| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: All kinds of soil : |
| 2 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) |
| 3 | Reinforced cement concrete work in walls (any thickness) including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts upto floor five level including curing but excluding cost of centering shuttering, finishing and reinforcement. 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) |
| 4 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level Cold twisted bars |
| 5 | Centering and shuttering including strutting, propping etc. and removal of form for |
| 6 | Foundations, footings, bases of columns etc. for mass concrete. |
| 7 | Providing and fixing gang saw cut, mirror polished, premoulded and prepolished, machine cut for kitchen platforms, vanity counters, window sills, facias and similar locations, of required size, approved shade, colour and texture laid over 20 mm thick base cement mortar 1:4 (1 cement : 4 coarse sand), joints treated with white cement, mixed with matching pigment, epoxy touch ups, including rubbing, curing, moulding and polishing to edges to give high gloss finish etc. complete at all levels Granite of any colour or shade (Area of slab over .5sqm) jet Black or equivalent (sample to be verified by the concerned department) |
| 8 | Providing edge moulding to 18 mm/16 mm thick marble stone counters, Vanities etc. including machine polishing to edge to give high gloss finishetc. complete as per design approved by Engineer-in-Charge.Granite Work |
| 9 | Providing and fixing focus lights of approved quality and brand as per the directions of engineer in charge |
| 10 | Engaging electrician for making electrical fittings and providing electrical conduits with wiring including cost of PVC electrical conduits and wire of approved brand and manufacture (anchor, supreme or equivalent brand) all complete job |
| 11 | Providing and laying vitrified floor tiles in different sizes (thickness to be specified by the manufacturer) with water absorption less than 0.08% and conforming to IS:15622 of approved make, in all colours and shades, aid on 20mm thick cement mortar 1:4 (1cement :4 coarse sand) including grouting the joints with white cement and matching pigments etc. complete Size of tile 600x600 mm (anti skid) |
| 12 | Engraving letters on granite as per the reqd size and specifications of the concerned department |
| 13 | Providing and fixing in position stainless steel balusters with ball cap at the top of reqd size and specifications as per directions of engineer in charge all complete job |
| 14 | Providing and fixing SS chain to balusters of reqd lengths. Thickness and size as per directions of engineer in charge all complete job(@ 2kg/m) |
| 15 | Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as10 sqm on plan including disposal of excavated earth, leadupto50meterand lift upto 1.5m, as directed by Engineer-in-Charge. All kinds of soil : |
| 16 | 12mm Cement plaster of mix: 1 : 6 ( 1 cement : 6 fine sand) |
| 17 | Providing and fixing cramps of required size and shape for anchoring stone wall lining to the backing or securing adjacent stones in stone wall lining in cement mortar 1:2 (1 cement: 2 coarse sand) including making the necessary chases in stone and holes in walls wherever required Stainless Steel Cramp |
| 18 | Carriage of material |
| 19 | Aggregate below 40mm for an average lead of 10kms |
| 20 | Aggregate above 40mm for an average lead of 10kms Please Enable Macros to View BoQ information |