| 1 | Supply of 3 Core X 185 sq. mm size, 11KV grade, multicore Aluminium HT Cables, Stranded Compacted Circular Aluminium Conductor, | Supply of 3 Core X 185 sq. mm size, 11KV grade, multicore Aluminium HT Cables, Stranded Compacted Circular Aluminium Conductor, Conductor Screen with Extruded Semi Conducting Compound, XLPE Insulated, Insulation Screening with Extruded Semi Conducting Compound in Combination with Copper Tape, Cores Laid Up, Innersheath of PVC, Galvanised Steel Flat Strip Armoured, & Overall PVC Sheathed Cable Conforming to IS 7098 (Part-2) 2011 with upto Date Amendments. |
| 2 | Laying of one number PVC insulated and PVC sheathed or XLPE insulated power cable of 11 KV grade of following size Above 120 sq mm and upto 400 sq mm | Laying of one number PVC insulated and PVC sheathed/XLPE insulated power cable of 11 KV grade of following size direct in ground including excavation, sand cushioning, protective covering and refilling the trench etc. as required. Above 120 sq. mm and upto 400 sq. mm |
| 3 | Laying of one number PVC insulated and PVC sheathed or XLPE insulated power cable of 11 KV grade of following size Above 120 sq. mm and upto 400 sq. mm | Laying of one number PVC insulated and PVC sheathed/XLPE insulated power cable of 11 KV grade of following sizein the existing RCC/ HUME/ METAL/HDPE pipe/duct as required. Above 120 sq. mm and upto 400 sq. mm |
| 4 | Supply of 200 mm Outer dia Anti Rodent Fire Retardant permanantly lubricated HDPE High density polyethylene pipe complete | Supply of 200 mm Outer dia Anti Rodent Fire Retardant permanantly lubricated HDPE (High density polyethylene) pipe complete with accessories like couplers, bends, tee etc. of with pulling rope fitted inside complete as required and as per technical specifications. |
| 5 | Laying of HDPE Pipe of size 200 mm OD direct in ground upto 750 mm below ground level with excavation | Laying of HDPE Pipe of size 200 mm OD direct in ground (upto 750 mm below ground level) with excavation, back filling & making good the same as per site requirement for bituminous road crossing etc., complete as required. |
| 6 | Laying of HDPE Pipe of size 200 mm OD, by cutting of road or pavement or concrete etc. up to 30cm. Including making the damages good etc. as required. | Laying of HDPE Pipe of size 200 mm OD, by cutting of road /pavement/concrete etc. up to 30cm. i/c making the damages good etc. as required. |
| 7 | Construction of Concrete Chamber 2m L x 2m B x 1m H by excavation of soft soil including dressing of sides and ramming of bottoms | Construction of Concrete Chamber 2m L x 2m B x 1m H by excavation of soft soil including dressing of sides and ramming of bottoms, getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 metres dry brick pitching at bottom including supply of bricks complete as required. |
| 8 | Supplying and making indoor cable end termination with heat shrinkable jointing kit complete with all accessories including lugs suitable for following size 3 core X 185 sq. mm | Supplying and making indoor cable end termination with heat shrinkable jointing kit complete with all accessories including lugs suitable for following size of 3 core ,XLPE Aluminium conductor cable of 11 KV grade complete as required. 3 core X 185 sq. mm |
| 9 | Supplying and making straight through joint with heat shrinkable kit including ferrules and other jointing materials for following size 3 core X 185 sq. mm | Supplying and making straight through joint with heat shrinkable kit including ferrules and other jointing materials for following size of XLPE insulated and PVC sheathed/XLPE aluminium conductor cable of 1.1 KV grade as required. 3 core X 185 sq. mm |