| 1 | covering slab |
| 2 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil |
| 3 | 15.9.1:Demolishing stone rubble masonry manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer -in- Charges:In Lime Mortar |
| 4 | 15.3:Demolishing R.C.C. work manually / by mechanical means including stacking of steel bars and disposal of unserviceable material with in 50 metres lead as per direction of Engineer -in-Charge. |
| 5 | OD50951/2025-2026:RING BUND- Putting up ring bund with driving down of half split coconut post of 3.5m height to a depth of 2m at a distance 2.5m centre to centre and the placing MS Sheet of 6mm thick in between the driven coconut post by interconnecting the MS sheet with GI pipe and laying of clay excavated from the thodu itself, behind the placed MS sheet for making leak proof till the completion of the work and clearing the site by dismantling the bund after completion of the work .etc .complete as per the instruction of Departmental officers at the site. |
| 6 | OD50949/2025-2026:Coconut Pile - Supplying and stacking well matured straight coconut post of required length having avg diameter on 25cm for driving down through various strata bellow bed level including cost conveyance labour charges etc complete. |
| 7 | OD50952/2025-2026:Driving down coconut pile to lines and levels through soft to medium clay soil strata including all hire charges and labour and all other appliances necessary for pile driving down after pointing the bottom end. |
| 8 | 60.2.3:Bailing out water using pump above 5 HP and Up to 10 HP-Bailing out water with engine and pump set above 5HP and up to 10HP, including conveyance to site and erection,cost of fuel, lubrication oil and other stores, pay of staff etc complete |
| 9 | OD50957/2025-2026:DR PACKING Under foundation, Dry stone departmental supply - packing under foundation with good quality blasted rubble including conveyance of material and labour charges etc. complete as per direction of departmental officers at site. |
| 10 | 60.7.2:DR PACKING Under foundation - Dry stone packing under foundation with good quality blasted rubble including conveyance of material and labour charges etc. complete as per direction of departmental officers at site. |
| 11 | OD50955/2025-2026:Providing temporary shoring using Z sheet pile driving down vertically in lines and levels, interlocking with adjacent piles with suitable pile driving unit and all accessories, including all labour, hire charges etc. complete for protection of adjacent structures and supporting horizontally and vertically using ISMB-150 sections and removing the same after removing the work as per the directions of the departmental officers at site. |
| 12 | 4.1.5:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources) |
| 13 | 5.33.1.2:Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana / Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge; for the following grades of concrete. Note: Extra cement up to 10% of the minimum specified cement content in design mix shall be payable separately. In case the cement content in design mix is more than 110% of the specified minimum cement content, the contractor shall have discretion to either re-design the mix or bear the cost of extra cementAll work upto plinth levelConcrete of M30 grade with minimum cement content of 350 kg /cum |
| 14 | 5.1.3:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size derived from natural sources) |
| 15 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more |
| 16 | 5.9.2:Centering and shuttering including strutting, etc. and removal of form for:Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc. |
| 17 | 60.6:PVC WEEP HOLES- Providing weep holes using 75mm dia. PVC pipes working pressure 4kg /sq.cm including cost of materials, conveyance, labour charges etc. complete. |
| 18 | 11.20.3:Chequerred precast cement concrete tiles 22 mm thick in footpath & courtyard, jointed with neat cement slurry mixed with pigment to match the shade of tiles, including rubbing and cleaning etc. complete on 20 mm thick bed of cement mortar 1:4 ( 1 cement : 4 coarse sand).Dark shade pigment using ordinary cement |
| 19 | OD50956/2025-2026:Supplying and laying interlocking tile 100mm or nearest size thickness, minimum strength M40 including providing a layer of 6 mm aggregate for 5m thickness, then laying interlock cobbles in lines and levels as [per the directions of engineer in charge inclusive of all cost and conveyance charges etc. |
| 20 | 10.2:Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. |
| 21 | OD50954/2025-2026:Supply of Heavy duty CI MH cover with frame |
| 22 | 2.25:Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m. |
| 23 | OD50958/2025-2026:Providing and laying of a strip seal expansion joint catering to maximum horizontal movement upto 70 mm, complete as per approved drawings and standard specifications to be installed by the manufacturer/supplier or their authorised representative ensuring compliance to the manufacturer's instructions for installation |
| 24 | OD54887/2025-2026:Engaging labour for removing wastes, clearing removed jungle and silt/clay from under side of slabs and for conveying waste from thodu to nearby road and labour for capping of unauthorized drainage lines to thodu etc. Please Enable Macros to View BoQ information |