Name of Work:- GENERAL-Manjummel 25-26-Replacement of rubber seal -General Mechanical Work
Sl. No.
Item Description
1
Replacement of rubber seals
2
OD38126/2025-2026:Dismantling old rubber seal-chipping cutting and removing the bolt and nut dismantling taking out and stacking old rubber seal from the gate with out any damage. including cost of all labour tools and wccessories and lead lift and incidental and conveyance etc complete.
3
OD38125/2025-2026:Providing scaffolding for rubber seal replacement including cost of materials fabrication etc complete
4
85.116:Supplying and fixing in correct position with specified initial interface the flat type rubber seal confirming to IS 11855 to the gates including cost of SS bolts and nut all labour and machinery and incidental and conveyance charges complete as per approved specification and drawing
5
OD38596/2025-2026:Supplying and fixing in correct position with specified initial interface P-type bulb nose rubber seal confirming to IS11855 to the gates including cost of SS bolts and nuts and all labour and machinery and incidental and conveyance charges complete as per approved specifications and drawings
6
Patch work
7
OD38122/2025-2026:Supply of MS plates confirming to IS 2062GrB including the cost of conveyance charges
8
OD38121/2025-2026:Patchwork of mechanical structures and accessories as per approved specifications, drawings and directions of deptl officer at site including cost of labour, machinery, all leads and lifts, incidental and handling charges etc complete but excluding cost of material already supplied
9
85.114:Painting all the exposed surfaces of the gate and embedded parts with two coats of epoxy coal tar black paint confirming to IS14948 with a minimum film thickness of 150+/-5 microns per each coat over two coats of priming coat applied with zinc primer containing not less than 85% of zinc on dry film with a film thickness of 70+/-5 microns , so that the total film thickness of all coats including priming coat at any rate is not less than 350 microns after cleaning the surface using hand and power tool cleaning including cost of all materials, labour charges , cost of testing all painting materials, all incidental charges, hire of T&P etc. complete as per the direction of department officers at site Please Enable Macros to View BoQ information
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.