| 1 | Creation of 250 KVA sub-station at Kowbag along with HT/LT network. |
| 2 | 250 kVA (11/0.433-0.250KV;50Hz), Copper WoundDistribution Transformer of latest Energy EfficiencyLevel-2 (New), IS1180 Part-I; 2014 as per latest upto dateamendment with externally fitted MCCB with cable box and 4x4 Mtrs. suitable cable of ratings |
| 3 | Gapless Surge Arrestor,9 kV ,10 kA ,LA with polymerhousing, Stn. Type |
| 4 | 11kV GO, AB Switch 3-Phase, 3-Pole, 200 Amp, Vertical |
| 5 | 11 kV Horn Gap Fuse Set 3 Phase 200A |
| 6 | 300 mm² (1ckt.) 1.1 kv Grade, PVC insulated stranded conductor FRLS type |
| 7 | 9 Mtr. Long Pole( ST-410 SP33) |
| 8 | 11kV Polymeric composite Disc Insulator 12kV,min failing load 45kN, Lightening Impulse 75kV Positive and80kV Negative, creepage distance 320mm |
| 9 | GI Channel/Angle/Flat of sizes including clamps |
| 10 | Galvinized Nuts and Bolts. |
| 11 | Earthing of substation --Excavation of earth pit of dia 650 mm & depth 3000 mm, installation of Earthing pipe of 40 mm Nominal bore & 4mm wall thickness & length 2.5 mtr long as Per IS 1239.GI Strip for neutral earthing of size 25 mm x 3 mm for connection of transformer body,G.O Set & lightening arrestor as per IS 2629/85, GI nuts & bolts,refilled with earth enhancement materials and earth Chamber made of brick masonary with RCC slab cover. |
| 12 | 11 KV polymeric composite Pin insulator, 12kv, 5 kn, lightening impulse 75 KV Positive and 80 KV Negative, creepage distance 320mm |
| 13 | Galvanized stay set with 50*8 mm stay clamp, guy insulator(2 nos), anchor plate (200*6mm), nuts-bolts, 2 Nos turn buckets, 1.8m long, 16 mm diameter solid GS stay rod & 7/15 mm dia GI strandard wire complete. |
| 14 | Wedge connctors/PG Clamps |
| 15 | Danger plates with clamps |
| 16 | GI Barbed wire for Anti Climbing |
| 17 | 3-phase 4 wire Trivector meter with CT |
| 18 | Cement Bottoming 1:2:4 mix as per REC Strandards 0.5 cum per pole |
| 19 | Painting of ST poles 9 mtr of substation including cross arm, clamps with 1 coat of Red Oxide (Asian/Nerolac make) |
| 20 | Painting of ST poles 9 mtr of substation including cross arm, clamps with 2 coat of Aluminium Paint (Asian/Nerolac make) |
| 21 | LT Distribution Box for 250 kVA DTR with MCCB forincomer & Switch Fuse Units for Outgoing Circuits |
| 22 | Sundry Item like aluminium lugs, jumpers, binding tape. |
| 23 | 9 Mtr. Long Pole( ST-410 SP33) |
| 24 | GI V cross-arm with top Bracket including clamp |
| 25 | GI Channel X-arm including clamps and braces |
| 26 | 30 mm² ACSR Conductor |
| 27 | 11kV Polymeric composite Pin Insulator 12kV, 5kN, Lighting Impulse 75kV Positive and 80kV Negative,creepage distance 320mm |
| 28 | 11kV Polymeric composite Disc Insulator 12kV,min failing load 45kN, Lighting Impulse 75kV Positive and 80kV Negative, creepage distance 320mm |
| 29 | Galvanized Nuts and Bolts |
| 30 | Earthing Complete by GI Pipe 40 mm or GI Rod 20mm 2.5 mtr long through GI Strip. |
| 31 | 8 Mtr. Long Pole(ST-410 SP15) |
| 32 | ACSR Rabbit |
| 33 | Shackle Insulator |
| 34 | M Clamp |
| 35 | Galvanized Nuts and Bolts |
| 36 | Earthing Complete by GI Pipe 40 mm or GI Rod 20mm 2.5 mtr long through GI Strip. |
| 37 | Aluminium Paint |
| 38 | Red Oxide |
| 39 | Danger Plates |
| 40 | Anti-Climbing Device with Clamps |
| 41 | Cement bottoming 1:2:4 mix as per REC standards.45cum /pole |
| 42 | Creation of 100 KVA sub-station at Lamber along with HT/LT network. |
| 43 | 100 kVA (11/0.433-0.250KV;50Hz), Aluminium WoundDistribution Transformer of latest Energy EfficiencyLevel-2 (New), IS1180 Part-I; 2014 as per latest upto dateamendment with externally fitted MCCB with cable box and4x4 Mtrs. suitable cable of ratings. |
| 44 | Gapless Surge Arrestor,9 kV ,10 kA ,LA with polymerhousing, Stn. Type |
| 45 | 11kV GO, AB Switch 3-Phase, 3-Pole, 200 Amp, Vertical |
| 46 | 11 kV Horn Gap Fuse Set 3 Phase 200A |
| 47 | 185 mm² (1ckt.) 1.1 kv Grade, PVC insulated stranded conductor FRLS type |
| 48 | 9 Mtr. Long Pole( ST-410 SP33) |
| 49 | 11kV Polymeric composite Disc Insulator 12kV,min failing load 45kN, Lightening Impulse 75kV Positive and 80kV Negative, creepage distance 320mm |
| 50 | GI Channel/Angle/Flat of sizes including clamps |
| 51 | Galvinized Nuts and Bolts. |
| 52 | Earthing of substation --Excavation of earth pit of dia 650 mm & depth 3000 mm, installation of Earthing pipe of 40 mm Nominal bore & 4mm wall thickness & length 2.5 mtr long as Per IS 1239.GI Strip for neutral earthing of size 25 mm x 3 mm for connection of transformer body,G.O Set & lightening arrestor as per IS 2629/85, GI nuts & bolts, refilled with earth enhancement materials and earth Chamber made of brick masonary with RCC slab cover. |
| 53 | 11 KV polymeric composite Pin insulator, 12kv, 5 kn, lightening impulse 75 KV Positive and 80 KV Negative, creepage distance 320mm |
| 54 | Galvanized stay set with 50*8 mm stay clamp, guy insulator(2 nos), anchor plate (200*6mm), nuts-bolts, 2 Nos turn buckets, 1.8m long, 16 mm diameter solid GS stay rod & 7/15 mm dia GI strandard wire complete. |
| 55 | Wedge connctors/PG Clamps |
| 56 | Danger plates with clamps |
| 57 | GI Barbed wire for Anti Climbing |
| 58 | 3-phase 4 wire Trivector meter with CT |
| 59 | Cement Bottoming 1:2:4 mix as per REC Strandards 0.5 cum per pole |
| 60 | LT Distribution Box for 100 kVA DTR with MCCB for incomer & Switch Fuse Units for Outgoing Circuits |
| 61 | Painting of ST poles 9 mtr of substation including cross arm, clamps with 1 coat of Red Oxide (Asian/Nerolac make) |
| 62 | Painting of ST poles 9 mtr of substation including cross arm, clamps with 2 coat of Aluminium Paint (Asian/Nerolac make) |
| 63 | Wire mesh boundary fencing around the Xmer Structur |
| 64 | Sundry Item like aluminium lugs, jumpers, binding tape. |
| 65 | 9 Mtr. Long Pole( ST-410 SP33) |
| 66 | GI V cross-arm with top Bracket including clamp |
| 67 | GI Channel X-arm including clamps and braces |
| 68 | 30 mm² ACSR Conductor |
| 69 | 11kV Polymeric composite Pin Insulator 12kV, 5kN, Lighting Impulse 75kV Positive and 80kV Negative,creepage distance 320mm |
| 70 | 11kV Polymeric composite Disc Insulator 12kV,min failing load 45kN, Lighting Impulse 75kV Positive and 80kV Negative, creepage distance 320mm |
| 71 | Galvanized Nuts and Bolts |
| 72 | Earthing Complete by GI Pipe 40 mm or GI Rod 20mm 2.5 mtr long through GI Strip. |
| 73 | Aluminium Paint |
| 74 | Red Oxide |
| 75 | Danger Plates with Clamps |
| 76 | Anti-Climbing Device with Clamps |
| 77 | Cement bottoming 1:2:4 mix as per REC standards 0.5cum per pole |
| 78 | Guard netting complete |
| 79 | 11kV GO, AB Switch 3-Phase, 3-Pole, 200 Amp, Vertical |
| 80 | Galvanised Stay Set with 50x8mm stay clamp, guy insulator(2Nos.), anchor plate (200x 200 x 6 mm), nut-bolts, 2 Nos turn-buckles, 1.8m long, 16 mm diameter solid GS stay rod & 7/3.15 mm dia GI stranded wire complete |
| 81 | 8 Mtr. Long Pole(ST-410 SP15) |
| 82 | 120 mm² AB (LT) Cable ( 3 x 120 + 1 x 16 + 1 x 70 mm²) XLPE (1.1kV, 3+1 C, Al) |
| 83 | Suspension/Tension Clamp with eye hook |
| 84 | Galvanized Nuts and Bolts |
| 85 | Danger Plates |
| 86 | Anti-Climbing Device with Clamps |
| 87 | Earthing Complete by GI Pipe 40 mm or GI Rod 20mm 2.5 mtr long through GI Strip |
| 88 | Red Oxide |
| 89 | Aluminium Paint |
| 90 | Cement bottoming 1:2:4 mix as per REC standards .45cum/pole |
| 91 | Insulating Piercing Connetors |
| 92 | Creation of 63 KVA sub-station at Konsi Nallah along with HT/LT network. |
| 93 | 63 kVA (11/0.433-0.250KV;50Hz), Aluminium WoundDistribution Transformer of latest Energy EfficiencyLevel-2 (New), IS1180 Part-I; 2014 as per latest upto dateamendment with externally fitted MCCB with cable box and 4x4 Mtrs. suitable cable of ratings |
| 94 | Gapless Surge Arrestor,9 kV ,10 kA ,LA with polymerhousing, Stn. Type |
| 95 | 11kV GO, AB Switch 3-Phase, 3-Pole, 200 Amp, Vertical |
| 96 | 11 kV Horn Gap Fuse Set 3 Phase 200A |
| 97 | 120 mm² (1ckt.) 1.1 kv Grade, PVC insulated stranded conductor FRLS type |
| 98 | 9 Mtr. Long Pole( ST-410 SP33) |
| 99 | 11kV Polymeric composite Disc Insulator 12kV,min failing load 45kN, Lightening Impulse 75kV Positive and80kV Negative, creepage distance 320mm |
| 100 | GI Channel/Angle/Flat of sizes including clamps |
| 101 | Galvinized Nuts and Bolts. |
| 102 | Earthing of substation --Excavation of earth pit of dia 650 mm & depth 3000 mm, installation of Earthing pipe of 40 mm Nominal bore & 4mm wall thickness & length 2.5 mtr long as Per IS 1239.GI Strip for neutral earthing of size 25 mm x 3 mm for connection of transformer body,G.O Set & lightening arrestor as per IS 2629/85, GI nuts & bolts,refilled with earth enhancement materials and earth Chamber made of brick masonary with RCC slab cover. |
| 103 | 11 KV polymeric composite Pin insulator, 12kv, 5 kn, lightening impulse 75 KV Positive and 80 KV Negative, creepage distance 320mm |
| 104 | Galvanized stay set with 50*8 mm stay clamp, guy insulator(2 nos), anchor plate (200*6mm), nuts-bolts, 2 Nos turn buckets, 1.8m long, 16 mm diameter solid GS stay rod & 7/15 mm dia GI strandard wire complete. |
| 105 | Wedge connctors/PG Clamps |
| 106 | Danger plates with clamps |
| 107 | GI Barbed wire for Anti Climbing |
| 108 | 3-phase 4 wire Trivector meter with CT |
| 109 | Cement Bottoming 1:2:4 mix as per REC Strandards 0.5 cum per pole |
| 110 | LT Distribution Box for 63 kVA DTR with MCCB forincomer & Switch Fuse Units for Outgoing Circuits |
| 111 | Painting of ST poles 9 mtr of substation including cross arm, clamps with 1 coat of Red Oxide (Asian/Nerolac make) |
| 112 | Painting of ST poles 9 mtr of substation including cross arm, clamps with 2 coat of Aluminium Paint (Asian/Nerolac make) |
| 113 | Sundry Item like aluminium lugs, jumpers, binding tape. |
| 114 | 9 Mtr. Long Pole( ST-410 SP33) |
| 115 | GI V cross-arm with top Bracket including clamp |
| 116 | GI Channel X-arm including clamps and braces |
| 117 | 11 KV polymeric composite Pin insulator, 12kv, 5 kn, lightening impulse 75 KV Positive and 80 KV Negative, creepage distance 320mm |
| 118 | 50sqmm ACSR Conductor |
| 119 | Danger Plates |
| 120 | Anti-Climbing Device with Clamps |
| 121 | Earthing Complete by GI Pipe 40 mm or GI Rod 20mm 2.5 mtr long through GI Strip |
| 122 | Red Oxide |
| 123 | Aluminium Paint |
| 124 | Cement bottoming 1:2:4 mix as per REC standards .45cum /pole |
| 125 | 11kV Polymeric composite Disc Insulator 12kV,min failing load 45kN, Lightening Impulse 75kV Positive and80kV Negative, creepage distance 320mm |
| 126 | Galvanised Stay Set with 50x8mm stay clamp, guy insulator(2Nos.), anchor plate (200x 200 x 6 mm), nut-bolts, 2 Nos turn-buckles, 1.8m long, 16 mm diameter solid GS stay rod & 7/3.15 mm dia GI stranded wire complete |
| 127 | PG Clamps for 50sqnn ACSR Conductor |
| 128 | Galvanized Nuts and Bolts |
| 129 | Aluminium Jointing Slleves |
| 130 | 8 Mtr. Long Pole(ST-410 SP15) |
| 131 | 120 mm² AB (LT) Cable ( 3 x 120 + 1 x 16 + 1 x 70 mm²) XLPE (1.1kV, 3+1 C, Al) |
| 132 | Suspension/Tension Clamp with eye hook |
| 133 | Galvanized Nuts and Bolts |
| 134 | Danger Plates |
| 135 | Anti-Climbing Device with Clamps |
| 136 | Earthing Complete by GI Pipe 40 mm or GI Rod 20mm 2.5 mtr long through GI Strip |
| 137 | Red Oxide |
| 138 | Aluminium Paint |
| 139 | Cement bottoming 1:2:4 mix as per REC standards .45cum/pole |
| 140 | Insulating Piercing Connetors |
| 141 | Creation of 100 KVA sub-station at Kanga along with HT/LT network. |
| 142 | 100 kVA (11/0.433-0.250KV;50Hz), Aluminium WoundDistribution Transformer of latest Energy EfficiencyLevel-2 (New), IS1180 Part-I; 2014 as per latest upto dateamendment with externally fitted MCCB with cable box and4x4 Mtrs. suitable cable of ratings. |
| 143 | Gapless Surge Arrestor,9 kV ,10 kA ,LA with polymerhousing, Stn. Type |
| 144 | 11kV GO, AB Switch 3-Phase, 3-Pole, 200 Amp, Vertical |
| 145 | 11 kV Horn Gap Fuse Set 3 Phase 200A |
| 146 | 185 mm² (1ckt.) 1.1 kv Grade, PVC insulated stranded conductor FRLS type |
| 147 | 9 Mtr. Long Pole( ST-410 SP33) |
| 148 | 11kV Polymeric composite Disc Insulator 12kV,min failing load 45kN, Lightening Impulse 75kV Positive and 80kV Negative, creepage distance 320mm |
| 149 | GI Channel/Angle/Flat of sizes including clamps |
| 150 | Galvinized Nuts and Bolts. |
| 151 | Earthing of substation --Excavation of earth pit of dia 650 mm & depth 3000 mm, installation of Earthing pipe of 40 mm Nominal bore & 4mm wall thickness & length 2.5 mtr long as Per IS 1239.GI Strip for neutral earthing of size 25 mm x 3 mm for connection of transformer body,G.O Set & lightening arrestor as per IS 2629/85, GI nuts & bolts, refilled with earth enhancement materials and earth Chamber made of brick masonary with RCC slab cover. |
| 152 | 11 KV polymeric composite Pin insulator, 12kv, 5 kn, lightening impulse 75 KV Positive and 80 KV Negative, creepage distance 320mm |
| 153 | Galvanized stay set with 50*8 mm stay clamp, guy insulator(2 nos), anchor plate (200*6mm), nuts-bolts, 2 Nos turn buckets, 1.8m long, 16 mm diameter solid GS stay rod & 7/15 mm dia GI strandard wire complete. |
| 154 | Wedge connctors/PG Clamps |
| 155 | Danger plates with clamps |
| 156 | GI Barbed wire for Anti Climbing |
| 157 | 3-phase 4 wire Trivector meter with CT |
| 158 | Cement Bottoming 1:2:4 mix as per REC Strandards 0.5 cum per pole |
| 159 | LT Distribution Box for 100 kVA DTR with MCCB for incomer & Switch Fuse Units for Outgoing Circuits |
| 160 | Painting of ST poles 9 mtr of substation including cross arm, clamps with 1 coat of Red Oxide (Asian/Nerolac make) |
| 161 | Painting of ST poles 9 mtr of substation including cross arm, clamps with 2 coat of Aluminium Paint (Asian/Nerolac make) |
| 162 | Wire mesh boundary fencing around the Xmer Structur |
| 163 | Sundry Item like aluminium lugs, jumpers, binding tape. |
| 164 | 9 Mtr. Long Pole( ST-410 SP33) |
| 165 | GI V cross-arm with top Bracket including clamp |
| 166 | GI Channel X-arm including clamps and braces |
| 167 | 30 mm² ACSR Conductor |
| 168 | 11kV Polymeric composite Pin Insulator 12kV, 5kN, Lighting Impulse 75kV Positive and 80kV Negative,creepage distance 320mm |
| 169 | 11kV Polymeric composite Disc Insulator 12kV,min failing load 45kN, Lighting Impulse 75kV Positive and 80kV Negative, creepage distance 320mm |
| 170 | Galvanized Nuts and Bolts |
| 171 | Earthing Complete by GI Pipe 40 mm or GI Rod 20mm 2.5 mtr long through GI Strip. |
| 172 | 11kV GO, AB Switch 3-Phase, 3-Pole, 200 Amp, Vertical |
| 173 | 8 Mtr. Long Pole(ST-410 SP15) |
| 174 | 120 mm² AB (LT) Cable ( 3 x 120 + 1 x 16 + 1 x 70 mm²) XLPE (1.1kV, 3+1 C, Al) |
| 175 | Suspension/Tension Clamp with eye hook |
| 176 | Galvanized Nuts and Bolts |
| 177 | Danger Plates |
| 178 | Anti-Climbing Device with Clamps |
| 179 | Earthing Complete by GI Pipe 40 mm or GI Rod 20mm 2.5 mtr long through GI Strip |
| 180 | Red Oxide |
| 181 | Aluminium Paint |
| 182 | Cement bottoming 1:2:4 mix as per REC standards .45cum/pole |
| 183 | Insulating Piercing Connetors |
| 184 | Creation of LT netwwork for already existing 100 KVA sub-station at Chanderkote |
| 185 | 70 mm² AB (LT) Cable ( 3X70+1x16+1X50 mm²) XLPE (1.1kV, 3+1 C, Al) |
| 186 | Suspension/Tension Clamp with eye hook |
| 187 | Galvanized Nuts and Bolts |
| 188 | LT Distribution Box for 100 kVA DTR with MCCB forincomer & Switch Fuse Units for Outgoing Circuits |
| 189 | Support Galvanised angle frame and legs (50mm x 50 mm x 6 mm) for Distribution Box , leg height 1m with 0.3m in soil approx [email protected] per mtr |
| 190 | Sundry Item like aluminium lugs, jumpers, binding tape. |
| 191 | Insulating Piercing Connetors |
| 192 | Galvanised Stay Set Complete Please Enable Macros to View BoQ information |