|
| 1 | Providing and laying river bed material including carriage, levelling with labour complet job(without rolling with power road roller) |
| 2 | Providing and laying in position cement concrete of specified grade including curing butexcluding the cost of centring and shuttering. All work upto plinth level with 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)(including carriage) |
| 4 | Centering and shuttering including strutting, propping etc. and removal of form for: Foundations, footings, bases of columns etc. for mass concrete |
| 5 | Providing and laying non-pressure NP2 class (light duty) R.C.C. pipes with collars jointed with stiff mixture of cement mortar in the proportion of 1:2 (1 cement: 2 fine sand) including testing of joints etc. complete 900 mm dia. R.C.C. pipe |
| 6 | Providing and laying non-pressure NP2 class (light duty) R.C.C. pipes with collars jointed with stiff mixture of cement mortar in the proportion of 1:2 (1 cement: 2 fine sand) including testing of joints etc. complete 600 mm dia. R.C.C. pipe |
| 7 | Providing and laying water bound macadam wuth specified stone aggregate,stone screening and binding material,including sorting spreading to template and consolidation with power road roller 8 to 10 tonne capacity Providing, laying, spreading and compacting graded stone aggregate (size range 53 mm to 0.075 mm ) to wet mix macadam (WMM) specification including premixing the material with water at OMC in mechanical mix plant, carriage of mixed material by tipper to site, for all leads & lifts, laying in uniform layers with mechanical paver finisher in sub- base / basecourse on well prepared surface and compacting with vibratory roller of 8 to 10 tonne capacity to achieve the desired density, complete as per specifications and directions of Engineer-in-Charge |
| 8 | Engaging backhole jcb genaral site clearance and remvoal of mulba |
| 9 | Finishing walls with premium Acrylic smooth exterior paint with silicon additives of required shade: Old work (one or more coats applied @ 0.83 liters/ 10sqm) |
| 10 | Applying priming coat With ready mixed red oxide Zinc Chromate primer of approved brand and manufacture on steel galvanized iron/steel works |
| 11 | Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade, one or more coats on old work. |
| 12 | Engagment of labour for removing uprooting,vegitation and allied works |
| 13 | Providing and fixing signe board,caution board complete job |
| 14 | providing and fixing crash barrier includind carriage fixing complet job Please Enable Macros to View BoQ information |