|
| 1 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: All kinds of soil : |
| 2 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed:25 meter beyond 1 m from cutting edge. All kinds of soil |
| 3 | Demolishing cement concrete maually/by mechanical means including disposal of material within 50 metres lead 1:3:6 or richer mix |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering- All work upto plinth level. 1:3:6 (1 cement: 3 coarse sand: 6 graded stone aggregate 20mm nominal size Crushed) |
| 5 | Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centenng. shuttering, finishing and reinforcement. All work upto plinth level. excluding cost of centring, shuttering,finishing and reinforcement. 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded crushed stone aggregate 20mm nominal size) |
| 6 | Extra for laying concrete in or under foul conducations |
| 7 | Reinforcement for R.C.C work including straighening, cutting, bending placing in postion and binding all complete. Thermo- Mechanically Treated bars (Rate to Include Cost of Binding Wire) |
| 8 | Removal of unhygienic material (so classified by the site engineer) from designated sites and its disposal as per direction, all inclusive. |
| 9 | Centring and shuttering including strutting,propping etc. & removal of form for: |
| 10 | Foundations: footings, bases of columns etc. for mass concrete. |
| 11 | Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc. |
| 12 | Suspended floors, roofs, landings, balconies and access platforms. |
| 13 | Edges of slabs and breaks in floors and walls Under 20 cm wide |
| 14 | Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. In gratings, frames, guard bar, ladder, railings, brackets, gates andsimilar works. |
| 15 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m. |
| 16 | Carraige of Earth/Mulba for disposal 5km by M.T. |
| 17 | Carriage of Sand and Bajree for 10 kms by M.T. incl loading and unloading at site |
| 18 | Hand packing of stones in wires- crates excluding cost of Crates band Stones |
| 19 | Supply of stones. |
| 20 | Supply of Knitted wire crates of size 6 x 1.50 x 1.50 m 150 no. of crates Please Enable Macros to View BoQ information |