Bids Are Invited For Design Installation And Maintenance Of Educational Lab/Centre - Science Lab; Supply And Installation Of Hardware, Power System-Ii; Buyer - I.D.M.T. Over Current Relay (Electro Mechanical Type)(A) To Study The Construction Of The, Gonda-Uttar Pradesh
TDR : 55404706
Tender Notice
BOQ
10 Days Left
Gonda
Uttar Pradesh
Bids Are invited for Design Installation And Maintenance Of Educational Lab/Centre - Science Lab; Supply And Installation Of Hardware, Power System-Ii; Buyer - I.D.M.T. Over Current Relay (Electro Mechanical Type)(A) To Study The Construction Of The
I.D.M.T. OVER CURRENT RELAY (ELECTRO MECHANICAL TYPE)(a) To study the construction of the Relay.(b) To find the operating characteristics of the Relay for time and current settings.(c) To determine Reset ratio.Over Current RelayType - Single Pole/Element Over Current Relay CT Input - 1 AmpPMS - 50% - 200% in step of 25%.TMS - 0.1 to 1 in steps of 0.1sFunction - IDMTCurve - IDMT Curve of 2 sec as per IEC-255 Features - Self poweredHand reset type-mechanical flag indicatorOver Current Relay Set KitThis relay setup is designed to test the over current relay with IDMT characteristics. It consists of:-
I.D.M.T. OVER CURRENT RELAY (ELECTRO MECHANICAL TYPE)(a) To study the construction of the Relay.(b) To find the operating characteristics of the Relay for time and current settings.(c) To determine Reset ratio.Over Current RelayType - Single Pole/Element Over Current Relay CT Input - 1 AmpPMS - 50% - 200% in step of 25%.TMS - 0.1 to 1 in steps of 0.1sFunction - IDMTCurve - IDMT Curve of 2 sec as per IEC-255 Features - Self poweredHand reset type-mechanical flag indicatorOver Current Relay Set KitThis relay setup is designed to test the over current relay with IDMT characteristics. It consists of:-
2
TO STUDY PERCENTAGE DIFFERENTIAL RELAYExperiments to be performed1. Study the operating current of relay.2. Study the out-zone fault of relay.3. Study the in-zone fault of relay.Testing panel modules mounted on sturdy aluminum profile 40x40 flat demo system, consisting of screen printed/ vinyl printed overlays circuit diagram, metering section, starter section and power supply section fixed on high insulated glass epoxy board modular design (all mosules must be housed in MS powder coated module housing) fixed to modular aluminium profile structure foot mounted with extended control desk made of 18 mm plyboard with sunmica and ESD sheet with wrist band earth protector . fitted top. and ms channel framed to mount on floor. The setup comes with Intel Core i5 13th Generation Processor, Windows 11, 8 GB DDR4 RAM, 512 GB SSD Hard Drive, Wired Keyboard & Mouse with 22.5\\" Monitor & Computer Table , installed completed PC based software to operate relay and measurement , uploading and downloading the setting and logicdiagram files directly to relay
TO STUDY PERCENTAGE DIFFERENTIAL RELAYExperiments to be performed1. Study the operating current of relay.2. Study the out-zone fault of relay.3. Study the in-zone fault of relay.Testing panel modules mounted on sturdy aluminum profile 40x40 flat demo system, consisting of screen printed/ vinyl printed overlays circuit diagram, metering section, starter section and power supply section fixed on high insulated glass epoxy board modular design (all mosules must be housed in MS powder coated module housing) fixed to modular aluminium profile structure foot mounted with extended control desk made of 18 mm plyboard with sunmica and ESD sheet with wrist band earth protector . fitted top. and ms channel framed to mount on floor. The setup comes with Intel Core i5 13th Generation Processor, Windows 11, 8 GB DDR4 RAM, 512 GB SSD Hard Drive, Wired Keyboard & Mouse with 22.5\\" Monitor & Computer Table , installed completed PC based software to operate relay and measurement , uploading and downloading the setting and logicdiagram files directly to relay
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.