Sales : +91-777 804 8217
| Sl. No. | Item Description |
| 1 | KURAVAN KURATHY (KIV No.KIV /ALP/PV/1003/12)-SMVBC MADUPATTY Towing the boat from the water body, hauling it ashore to the docking yard, and positioning it properly for carrying out the Dry Dock Survey works, including making all necessary arrangements for the same; and re-launching the boat into the water body after completion of the Dry Dock Survey, complete in all respects as per the directions of the concerned officials. |
| 2 | Carrying out FRP repairs on the deck of the boat using suitable FRP materials, including identifying the damaged/cracked areas; cleaning and grinding the affected portions; carrying out necessary FRP lamination works; finishing the repaired areas with gel coating to obtain a smooth and finished surface; and completing the work in all respects as per the directions of the concerned officials. |
| 3 | Carrying out FRP repairs on the damaged Hull/ keel area of the boat using suitable FRP materials, including identifying the leakage/cracked areas; cleaning and grinding the affected portions; carrying out the necessary FRP lamination works; and finishing the underwater hull areas and repaired areas with gel coating to obtain a smooth and finished surface, complete in all respects as per the directions of the concerned officials. |
| 4 | Providing and fixing MS clamps suitable for mounting a 6 kg Fire Extinguisher, including fixing the clamp to the body of the boat using SS base plates, bolts, and nylock nuts; providing a suitable FRP bottom support for proper seating of the fire extinguisher; cutting and making necessary openings in the FRP surface wherever required; carrying out the required FRP works to restore and neatly finish the surface after installation; and completing the work in all respects as per the directions of the concerned officials. |
| 5 | Supplying and fixing stainless steel (SS) cleats of approved size, using SS base plates, bolts and nylock nuts, including cutting and making suitable openings in the FRP surface for proper fixing; carrying out necessary FRP works to restore and finish the surface neatly after installation; and completing the work in all respects as per the directions of the concerned officials. |
| 6 | Supplying and fixing stainless steel (SS) handrails made of 20 mm diameter SS pipe, having a length of 1 metre, including SS base plates, bolts, and nylock nuts for proper fixing; cutting and making suitable openings in the FRP surface wherever required; carrying out necessary FRP works to restore and finish the surface neatly after installation; and completing the work in all respects as per the directions of the concerned officials. |
| 7 | Replacement of the existing wind glass with 2 mm thick good-quality clear polycarbonate sheet of required size for the front and side glasses, including cutting to the required size, carefully removing the existing glass from the frame, refitting the new sheet with suitable bolt/rivet arrangements, carrying out necessary repairs to the frame wherever required, etc., complete as per the direction of the concerned officials. |
| 8 | Maintenance of the existing rubber beeding around the boat, including tightening with suitable bolt/rivet arrangements; leak-proofing the entire beading by applying silicone sealant wherever necessary; carrying out necessary repairs to the beeding channel wherever required; etc., complete as per the directions of the concerned officials. |
| 9 | Painting the entire boat with approved quality PU Enamel Paint, applying one or more coats to obtain a uniform and good finish, including surface preparation by chipping, scraping, and cleaning the existing surface. The work shall also include plastic putty application for finishing and levelling the body, followed by the application of a suitable priming coat using PU Enamel Primer / All-Surface Epoxy Primer. The work shall be completed in all respects to achieve a neat and durable appearance, as per the directions of the concerned officials. |
| 10 | Providing and marking the Plimsoll and Draft Lines on the boat as per the prescribed standards and relevant rules, including all necessary surface preparation, painting, and finishing, complete in all respects as per the directions of the concerned officials. |
| 11 | Providing and displaying all mandatory instructions in the boat as required under the rules and guidelines of the Kerala Maritime Board, by affixing good quality stickers or standard lettering at appropriate locations. The work shall include supplying, printing, and properly fixing the instructions wherever necessary, and shall be completed in all respects as per the directions of the concerned officials. |
| 12 | HIMENDU-PONTOON BOAT (KIV No.KIV /KDR/PV/0391/14)- SMVBC MADUPATTY Towing the boat from the water body, hauling it ashore to the docking yard, and positioning it properly for carrying out the Dry Dock Survey works, including making all necessary arrangements for the same; and re-launching the boat into the water body after completion of the Dry Dock Survey, complete in all respects as per the directions of the concerned officials. |
| 13 | Dismantling the roof, side bodies, platforms, seats, etc., of the Pontoon Boat carefully without causing any damage, and separating the hulls from the platforms for proper inspection of each component and for carrying out the necessary repair/maintenance works. The work shall include all required arrangements and shall be completed in all respects as per the directions of the concerned officials. |
| 14 | Carefully removing the electric engine, electric boat batteries, battery frame, panel board, etc., from the Electric Pontoon Boat without causing any damage, and transporting the removed items to a safe storage location. The work shall also include refixing and reinstalling all the removed components after completion of the boat maintenance works, and carrying out a successful trial run of the boat to ensure proper functioning. The work shall include all necessary arrangements and shall be completed in all respects as per the directions of the concerned officials. |
| 15 | Carefully removing the steering system, from the Electric Pontoon Boat without causing any damage, and transporting the removed items to a safe storage location. The work shall also include refixing and reinstalling all the removed components after completion of the boat maintenance works, and carrying out a successful trial run of the boat to ensure proper functioning. The work shall include all necessary arrangements and shall be completed in all respects as per the directions of the concerned officials. |
| 16 | Carrying out FRP repair works on the damaged keel area and rectifying hull leakages of the boat using suitable FRP materials, including identifying the leakage/cracked areas, cleaning and grinding the affected portions, and carrying out the necessary FRP lamination works. The work shall also include finishing the underwater hull and the repaired portions with gel coating to obtain a smooth and finished surface. The work shall be completed in all respects as per the directions of the concerned officials. |
| 17 | Painting the entire hull of the boat with approved quality PU Enamel Paint, applying one or more coats to obtain a uniform and good finish, including surface preparation by chipping, scraping, and cleaning the existing surface. The work shall also include plastic putty application for finishing and levelling the body, followed by the application of a suitable priming coat using PU Enamel Primer / All-Surface Epoxy Primer. The work shall be completed in all respects to achieve a neat and durable appearance, as per the directions of the concerned officials. |
| 18 | Painting the entire steel frame of the Pontoon Boat, including the steel platform, with approved quality epoxy paint in two or more coats after scraping and thoroughly cleaning the surfaces. The work shall also include replacing damaged steel members wherever necessary, applying epoxy primer on the cleaned surfaces and on newly replaced steel members, and refixing all steel frames and platforms to the boat in proper alignment. The work shall be carried out with all necessary arrangements and completed in all respects as per the directions of the concerned officials. |
| 19 | Refixing the FRP deck platform over the steel frame already fixed in position, and carrying out FRP repair works wherever necessary. The work shall include applying one coat of PU primer/all-surface epoxy primer and finishing with one or more coats of PU enamel paint of approved quality to obtain a good appearance. The work shall be completed in all respects as per the directions of the concerned officials. |
| 20 | Refixing the FRP Roof over the steel frame already fixed in position, and carrying out FRP repair works wherever necessary. The work shall include applying one coat of PU primer/all-surface epoxy primer and finishing with one or more coats of PU enamel paint of approved quality to obtain a good appearance. The work shall be completed in all respects as per the directions of the concerned officials. |
| 21 | Refixing the FRP seats over the platform already fixed in position and carrying out FRP repair works wherever necessary. The work shall include the application of one coat of PU Primer / All-Surface Epoxy Primer and finishing with one or more coats of approved quality PU Enamel Paint to obtain a good and uniform appearance. The work shall be completed in all respects as per the directions of the concerned officials. |
| 22 | Refixing the FRP side sheets over the side steel frame already fixed in position and carrying out FRP repair and patch works wherever necessary. The work shall include the application of one coat of PU Primer / All-Surface Epoxy Primer and finishing with one or more coats of approved quality PU Enamel Paint to obtain a good and uniform appearance. The work shall be completed in all respects as per the directions of the concerned officials. |
| 23 | Providing and fixing MS clamps suitable for mounting a 6 kg Fire Extinguisher, including fixing the clamp to the body of the boat using SS base plates, bolts, and nylock nuts; providing a suitable FRP bottom support for proper seating of the fire extinguisher; cutting and making necessary openings in the FRP surface wherever required; carrying out the required FRP works to restore and neatly finish the surface after installation; and completing the work in all respects as per the directions of the concerned officials. |
| 24 | Providing and marking the Plimsoll and Draft Lines on the boat as per the prescribed standards and relevant rules, including all necessary surface preparation, painting, and finishing, complete in all respects as per the directions of the concerned officials. |
| 25 | Providing and displaying all mandatory instructions in the boat as required under the rules and guidelines of the Kerala Maritime Board, by affixing good quality stickers or standard lettering at appropriate locations. The work shall include supplying, printing, and properly fixing the instructions wherever necessary, and shall be completed in all respects as per the directions of the concerned officials. |
| 26 | SPARROW No.3 (KIV No.KIV /KDR/PV/0003/10)-ECHO-POINT Towing the boat from the water body, hauling it ashore to the docking yard, and positioning it properly for carrying out the Dry Dock Survey works, including making all necessary arrangements for the same; and re-launching the boat into the water body after completion of the Dry Dock Survey, complete in all respects as per the directions of the concerned officials. |
| 27 | Carrying out FRP repairs on the duck, damaged Hull/ keel area of the boat using suitable FRP materials, including identifying the leakage/cracked areas; cleaning and grinding the affected portions; carrying out the necessary FRP lamination works; and finishing the underwater hull areas and repaired areas with gel coating to obtain a smooth and finished surface, complete in all respects as per the directions of the concerned officials. |
| 28 | Painting the entire boat with approved quality PU Enamel Paint, applying one or more coats to obtain a uniform and good finish, including surface preparation by chipping, scraping, and cleaning the existing surface. The work shall also include plastic putty application for finishing and levelling the body, followed by the application of a suitable priming coat using PU Enamel Primer / All-Surface Epoxy Primer. The work shall be completed in all respects to achieve a neat and durable appearance, as per the directions of the concerned officials. |
| 29 | Providing and marking the Plimsoll and Draft Lines on the boat as per the prescribed standards and relevant rules, including all necessary surface preparation, painting, and finishing, complete in all respects as per the directions of the concerned officials. |
| 30 | Providing and displaying all mandatory instructions in the boat as required under the rules and guidelines of the Kerala Maritime Board, by affixing good quality stickers or standard lettering at appropriate locations. The work shall include supplying, printing, and properly fixing the instructions wherever necessary, and shall be completed in all respects as per the directions of the concerned officials. |
| 31 | AYIRAVALLI (KIV No.KIV /VZM/PV/0344/19)-TLBC KUNDALA Towing the boat from the water body, hauling it ashore to the docking yard, and positioning it properly for carrying out the Dry Dock Survey works, including making all necessary arrangements for the same; and re-launching the boat into the water body after completion of the Dry Dock Survey, complete in all respects as per the directions of the concerned officials. |
| 32 | Painting the entire boat with approved quality PU Enamel Paint, applying one or more coats to obtain a uniform and good finish, including surface preparation by chipping, scraping, and cleaning the existing surface. The work shall also include plastic putty application for finishing and levelling the body, followed by the application of a suitable priming coat using PU Enamel Primer / All-Surface Epoxy Primer. The work shall be completed in all respects to achieve a neat and durable appearance, as per the directions of the concerned officials. |
| 33 | Providing and marking the Plimsoll and Draft Lines on the boat as per the prescribed standards and relevant rules, including all necessary surface preparation, painting, and finishing, complete in all respects as per the directions of the concerned officials. |
| 34 | Providing and displaying all mandatory instructions in the boat as required under the rules and guidelines of the Kerala Maritime Board, by affixing good quality stickers or standard lettering at appropriate locations. The work shall include supplying, printing, and properly fixing the instructions wherever necessary, and shall be completed in all respects as per the directions of the concerned officials. |
| 35 | RIPPLES (KIV No.KIV /KDR/PV/0388/14)-DVBC SENGULAM : Towing the boat from the water body, hauling it ashore to the docking yard, and positioning it properly for carrying out the Dry Dock Survey works, including making all necessary arrangements for the same; and re-launching the boat into the water body after completion of the Dry Dock Survey, complete in all respects as per the directions of the concerned officials. |
| 36 | Carrying out FRP repairs on the deck, damaged Hull/ keel area of the boat using suitable FRP materials, including identifying the leakage/cracked areas; cleaning and grinding the affected portions; carrying out the necessary FRP lamination works; and finishing the underwater hull areas and repaired areas with gel coating to obtain a smooth and finished surface, complete in all respects as per the directions of the concerned officials. |
| 37 | Replacement of the existing wind glass with 2 mm thick good-quality clear polycarbonate sheet of required size for the front and side glasses, including cutting to the required size, carefully removing the existing glass from the frame, refitting the new sheet with suitable bolt/rivet arrangements, carrying out necessary repairs to the frame wherever required, etc., complete as per the direction of the concerned officials. |
| 38 | Supplying and fixing stainless steel (SS) cleats of approved size, using SS base plates, bolts and nylock nuts, including cutting and making suitable openings in the FRP surface for proper fixing; carrying out necessary FRP works to restore and finish the surface neatly after installation; and completing the work in all respects as per the directions of the concerned officials. |
| 39 | Replacing the existing seat fixing bolts and nylock nuts with new ones of approved quality and refixing the seats in their proper positions. The work shall include cutting and making suitable openings in the FRP surface wherever required for proper fixing of the seats. After installation, necessary FRP repair works shall be carried out to restore the surface, and the repaired portions shall be finished neatly to obtain a proper and uniform appearance.The work shall be completed in all respects as per the directions of the concerned officials. |
| 40 | Replacing the existing rubber beeding around the boat, including tightening with suitable bolt/rivet arrangements; leak-proofing the entire beading by applying silicone sealant wherever necessary; carrying out necessary repairs to the beeding channel wherever required; etc., complete as per the directions of the concerned officials. |
| 41 | Replacing the existing stainless steel (SS) engine bed plate of the boat with a new one of approved quality. The work shall include fixing the plate in position by tightening with suitable screws/rivet arrangements, cutting and making necessary openings in the FRP surface wherever required for proper installation, and carrying out the required FRP repair works to restore the surface. The repaired portions shall be neatly finished to obtain a proper and uniform appearance.The work shall be completed in all respects as per the directions of the concerned officials. |
| 42 | Painting the entire boat with approved quality PU Enamel Paint, applying one or more coats to obtain a uniform and good finish, including surface preparation by chipping, scraping, and cleaning the existing surface. The work shall also include plastic putty application for finishing and levelling the body, followed by the application of a suitable priming coat using PU Enamel Primer / All-Surface Epoxy Primer. The work shall be completed in all respects to achieve a neat and durable appearance, as per the directions of the concerned officials. |
| 43 | Providing and marking the Plimsoll and Draft Lines on the boat as per the prescribed standards and relevant rules, including all necessary surface preparation, painting, and finishing, complete in all respects as per the directions of the concerned officials. |
| 44 | Providing and displaying all mandatory instructions in the boat as required under the rules and guidelines of the Kerala Maritime Board, by affixing good quality stickers or standard lettering at appropriate locations. The work shall include supplying, printing, and properly fixing the instructions wherever necessary, and shall be completed in all respects as per the directions of the concerned officials. |
| 45 | SAHYADRI-PONTOON BOAT (KIV No.KIV /KDR/PV/0389/14)- DVBC SENGULAM Towing the boat from the water body, hauling it ashore to the docking yard, and positioning it properly for carrying out the Dry Dock Survey works, including making all necessary arrangements for the same; and re-launching the boat into the water body after completion of the Dry Dock Survey, complete in all respects as per the directions of the concerned officials. |
| 46 | Dismantling the roof, side bodies, platforms, seats, etc., of the Pontoon Boat carefully without causing any damage, and separating the hulls from the platforms for proper inspection of each component and for carrying out the necessary repair/maintenance works. The work shall include all required arrangements and shall be completed in all respects as per the directions of the concerned officials. |
| 47 | Carefully removing the steering system, from the Electric Pontoon Boat without causing any damage, and transporting the removed items to a safe storage location. The work shall also include refixing and reinstalling all the removed components after completion of the boat maintenance works, and carrying out a successful trial run of the boat to ensure proper functioning. The work shall include all necessary arrangements and shall be completed in all respects as per the directions of the concerned officials. |
| 48 | Carrying out FRP repair works on the damaged keel area and rectifying hull leakages of the boat using suitable FRP materials, including identifying the leakage/cracked areas, cleaning and grinding the affected portions, and carrying out the necessary FRP lamination works. The work shall also include finishing the underwater hull and the repaired portions with gel coating to obtain a smooth and finished surface. The work shall be completed in all respects as per the directions of the concerned officials. |
| 49 | Painting the entire hull of the boat with approved quality PU Enamel Paint, applying one or more coats to obtain a uniform and good finish, including surface preparation by chipping, scraping, and cleaning the existing surface. The work shall also include plastic putty application for finishing and levelling the body, followed by the application of a suitable priming coat using PU Enamel Primer / All-Surface Epoxy Primer. The work shall be completed in all respects to achieve a neat and durable appearance, as per the directions of the concerned officials. |
| 50 | Painting the entire steel frame of the Pontoon Boat, including the steel platform, with approved quality epoxy paint in two or more coats after scraping and thoroughly cleaning the surfaces. The work shall also include replacing damaged steel members wherever necessary, applying epoxy primer on the cleaned surfaces and on newly replaced steel members, and refixing all steel frames and platforms to the boat in proper alignment. The work shall be carried out with all necessary arrangements and completed in all respects as per the directions of the concerned officials. |
| 51 | Refixing the FRP deck platform over the steel frame already fixed in position, and carrying out FRP repair works wherever necessary. The work shall include applying one coat of PU primer/all-surface epoxy primer and finishing with one or more coats of PU enamel paint of approved quality to obtain a good appearance. The work shall be completed in all respects as per the directions of the concerned officials. |
| 52 | Refixing the FRP Roof over the steel frame already fixed in position, and carrying out FRP repair works wherever necessary. The work shall include applying one coat of PU primer/all-surface epoxy primer and finishing with one or more coats of PU enamel paint of approved quality to obtain a good appearance. The work shall be completed in all respects as per the directions of the concerned officials. |
| 53 | Refixing the FRP seats over the platform already fixed in position and carrying out FRP repair works wherever necessary. The work shall include the application of one coat of PU Primer / All-Surface Epoxy Primer and finishing with one or more coats of approved quality PU Enamel Paint to obtain a good and uniform appearance. The work shall be completed in all respects as per the directions of the concerned officials. |
| 54 | Refixing the FRP side sheets over the side steel frame already fixed in position and carrying out FRP repair and patch works wherever necessary. The work shall include the application of one coat of PU Primer / All-Surface Epoxy Primer and finishing with one or more coats of approved quality PU Enamel Paint to obtain a good and uniform appearance. The work shall be completed in all respects as per the directions of the concerned officials. |
| 55 | Providing and fixing MS clamps suitable for mounting a 6 kg Fire Extinguisher, including fixing the clamp to the body of the boat using SS base plates, bolts, and nylock nuts; providing a suitable FRP bottom support for proper seating of the fire extinguisher; cutting and making necessary openings in the FRP surface wherever required; carrying out the required FRP works to restore and neatly finish the surface after installation; and completing the work in all respects as per the directions of the concerned officials. |
| 56 | Providing and marking the Plimsoll and Draft Lines on the boat as per the prescribed standards and relevant rules, including all necessary surface preparation, painting, and finishing, complete in all respects as per the directions of the concerned officials. |
| 57 | Providing and displaying all mandatory instructions in the boat as required under the rules and guidelines of the Kerala Maritime Board, by affixing good quality stickers or standard lettering at appropriate locations. The work shall include supplying, printing, and properly fixing the instructions wherever necessary, and shall be completed in all respects as per the directions of the concerned officials. |
| 58 | SREERAGAM (KIV No.KIV /KDR/PV/0057/11)-EABC ANAYIRANGAL Towing the boat from the water body, hauling it ashore to the docking yard, and positioning it properly for carrying out the Dry Dock Survey works, including making all necessary arrangements for the same; and re-launching the boat into the water body after completion of the Dry Dock Survey, complete in all respects as per the directions of the concerned officials. |
| 59 | Carrying out FRP repairs on the deck, damaged Hull/ keel area of the boat using suitable FRP materials, including identifying the leakage/cracked areas; cleaning and grinding the affected portions; carrying out the necessary FRP lamination works; and finishing the underwater hull areas and repaired areas with gel coating to obtain a smooth and finished surface, complete in all respects as per the directions of the concerned officials. |
| 60 | Providing and fixing MS clamps suitable for mounting a 6 kg Fire Extinguisher, including fixing the clamp to the body of the boat using SS base plates, bolts, and nylock nuts; providing a suitable FRP bottom support for proper seating of the fire extinguisher; cutting and making necessary openings in the FRP surface wherever required; carrying out the required FRP works to restore and neatly finish the surface after installation; and completing the work in all respects as per the directions of the concerned officials. |
| 61 | Supplying and fixing stainless steel (SS) handrails made of 20 mm diameter SS pipe, having a length of 1 metre, including SS base plates, bolts, and nylock nuts for proper fixing; cutting and making suitable openings in the FRP surface wherever required; carrying out necessary FRP works to restore and finish the surface neatly after installation; and completing the work in all respects as per the directions of the concerned officials. |
| 62 | Replacement of the existing wind glass with 2 mm thick good-quality clear polycarbonate sheet of required size for the front and side glasses, including cutting to the required size, carefully removing the existing glass from the frame, refitting the new sheet with suitable bolt/rivet arrangements, carrying out necessary repairs to the frame wherever required, etc., complete as per the direction of the concerned officials. |
| 63 | Maintenance of the existing rubber beeding around the boat, including tightening with suitable bolt/rivet arrangements; leak-proofing the entire beading by applying silicone sealant wherever necessary; carrying out necessary repairs to the beeding channel wherever required; etc., complete as per the directions of the concerned officials. |
| 64 | Painting the entire boat with approved quality PU Enamel Paint, applying one or more coats to obtain a uniform and good finish, including surface preparation by chipping, scraping, and cleaning the existing surface. The work shall also include plastic putty application for finishing and levelling the body, followed by the application of a suitable priming coat using PU Enamel Primer / All-Surface Epoxy Primer. The work shall be completed in all respects to achieve a neat and durable appearance, as per the directions of the concerned officials. |
| 65 | Providing and marking the Plimsoll and Draft Lines on the boat as per the prescribed standards and relevant rules, including all necessary surface preparation, painting, and finishing, complete in all respects as per the directions of the concerned officials. |
| 66 | Providing and displaying all mandatory instructions in the boat as required under the rules and guidelines of the Kerala Maritime Board, by affixing good quality stickers or standard lettering at appropriate locations. The work shall include supplying, printing, and properly fixing the instructions wherever necessary, and shall be completed in all respects as per the directions of the concerned officials. |
| 67 | Loading the speed boat at EABC, Anayirangal and transporting it to SMVBC, Mattupatty for carrying out the Dry Dock Survey works, including safe unloading at the destination. The work shall include all necessary arrangements for handling and transportation and shall be completed in all respects as per the directions of the concerned officials. |
| 68 | SNEHAVAHINI (KIV No.KIV /BPR/PV/0013/10)-EABC ANAYIRANGAL Towing the boat from the water body, hauling it ashore to the docking yard, and positioning it properly for carrying out the Dry Dock Survey works, including making all necessary arrangements for the same; and re-launching the boat into the water body after completion of the Dry Dock Survey, complete in all respects as per the directions of the concerned officials. |
| 69 | Carrying out FRP repairs on the duck, damaged Hull/ keel area of the boat using suitable FRP materials, including identifying the leakage/cracked areas; cleaning and grinding the affected portions; carrying out the necessary FRP lamination works; and finishing the underwater hull areas and repaired areas with gel coating to obtain a smooth and finished surface, complete in all respects as per the directions of the concerned officials. |
| 70 | Providing and fixing MS clamps suitable for mounting a 6 kg Fire Extinguisher, including fixing the clamp to the body of the boat using SS base plates, bolts, and nylock nuts; providing a suitable FRP bottom support for proper seating of the fire extinguisher; cutting and making necessary openings in the FRP surface wherever required; carrying out the required FRP works to restore and neatly finish the surface after installation; and completing the work in all respects as per the directions of the concerned officials. |
| 71 | Supplying and fixing stainless steel (SS) handrails made of 20 mm diameter SS pipe, having a length of 1 metre, including SS base plates, bolts, and nylock nuts for proper fixing; cutting and making suitable openings in the FRP surface wherever required; carrying out necessary FRP works to restore and finish the surface neatly after installation; and completing the work in all respects as per the directions of the concerned officials. |
| 72 | Replacement of the existing wind glass with 2 mm thick good-quality clear polycarbonate sheet of required size for the front and side glasses, including cutting to the required size, carefully removing the existing glass from the frame, refitting the new sheet with suitable bolt/rivet arrangements, carrying out necessary repairs to the frame wherever required, etc., complete as per the direction of the concerned officials. |
| 73 | Maintenance of the existing rubber beeding around the boat, including tightening with suitable bolt/rivet arrangements; leak-proofing the entire beading by applying silicone sealant wherever necessary; carrying out necessary repairs to the beeding channel wherever required; etc., complete as per the directions of the concerned officials. |
| 74 | Painting the entire boat with approved quality PU Enamel Paint, applying one or more coats to obtain a uniform and good finish, including surface preparation by chipping, scraping, and cleaning the existing surface. The work shall also include plastic putty application for finishing and levelling the body, followed by the application of a suitable priming coat using PU Enamel Primer / All-Surface Epoxy Primer. The work shall be completed in all respects to achieve a neat and durable appearance, as per the directions of the concerned officials. |
| 75 | Providing and marking the Plimsoll and Draft Lines on the boat as per the prescribed standards and relevant rules, including all necessary surface preparation, painting, and finishing, complete in all respects as per the directions of the concerned officials. |
| 76 | Providing and displaying all mandatory instructions in the boat as required under the rules and guidelines of the Kerala Maritime Board, by affixing good quality stickers or standard lettering at appropriate locations. The work shall include supplying, printing, and properly fixing the instructions wherever necessary, and shall be completed in all respects as per the directions of the concerned officials. |
| 77 | PONTOON BOAT (KIV No.KIV /KDR/PV/0007/10)- EABC ANAYIRANGAL: Towing the boat from the water body, hauling it ashore to the docking yard, and positioning it properly for carrying out the Dry Dock Survey works, including making all necessary arrangements for the same; and re-launching the boat into the water body after completion of the Dry Dock Survey, complete in all respects as per the directions of the concerned officials. |
| 78 | Dismantling the roof, side bodies, platforms, seats, etc., of the Pontoon Boat carefully without causing any damage, and separating the hulls from the platforms for proper inspection of each component and for carrying out the necessary repair/maintenance works. The work shall include all required arrangements and shall be completed in all respects as per the directions of the concerned officials. |
| 79 | Carefully removing the steering system, from the Electric Pontoon Boat without causing any damage, and transporting the removed items to a safe storage location. The work shall also include refixing and reinstalling all the removed components after completion of the boat maintenance works, and carrying out a successful trial run of the boat to ensure proper functioning. The work shall include all necessary arrangements and shall be completed in all respects as per the directions of the concerned officials. |
| 80 | Carrying out FRP repair works on the damaged keel area and rectifying hull leakages of the boat using suitable FRP materials, including identifying the leakage/cracked areas, cleaning and grinding the affected portions, and carrying out the necessary FRP lamination works. The work shall also include finishing the underwater hull and the repaired portions with gel coating to obtain a smooth and finished surface. The work shall be completed in all respects as per the directions of the concerned officials. |
| 81 | Painting the entire hull of the boat with approved quality PU Enamel Paint, applying one or more coats to obtain a uniform and good finish, including surface preparation by chipping, scraping, and cleaning the existing surface. The work shall also include plastic putty application for finishing and levelling the body, followed by the application of a suitable priming coat using PU Enamel Primer / All-Surface Epoxy Primer. The work shall be completed in all respects to achieve a neat and durable appearance, as per the directions of the concerned officials. |
| 82 | Painting the entire steel frame of the Pontoon Boat, including the steel platform, with approved quality epoxy paint in two or more coats after scraping and thoroughly cleaning the surfaces. The work shall also include replacing damaged steel members wherever necessary, applying epoxy primer on the cleaned surfaces and on newly replaced steel members, and refixing all steel frames and platforms to the boat in proper alignment. The work shall be carried out with all necessary arrangements and completed in all respects as per the directions of the concerned officials. |
| 83 | Refixing the FRP deck platform over the steel frame already fixed in position, and carrying out FRP repair works wherever necessary. The work shall include applying one coat of PU primer/all-surface epoxy primer and finishing with one or more coats of PU enamel paint of approved quality to obtain a good appearance. The work shall be completed in all respects as per the directions of the concerned officials. |
| 84 | Refixing the FRP Roof over the steel frame already fixed in position, and carrying out FRP repair works wherever necessary. The work shall include applying one coat of PU primer/all-surface epoxy primer and finishing with one or more coats of PU enamel paint of approved quality to obtain a good appearance. The work shall be completed in all respects as per the directions of the concerned officials. |
| 85 | Refixing the FRP seats over the platform already fixed in position and carrying out FRP repair works wherever necessary. The work shall include the application of one coat of PU Primer / All-Surface Epoxy Primer and finishing with one or more coats of approved quality PU Enamel Paint to obtain a good and uniform appearance. The work shall be completed in all respects as per the directions of the concerned officials. |
| 86 | Refixing the FRP side sheets over the side steel frame already fixed in position and carrying out FRP repair and patch works wherever necessary. The work shall include the application of one coat of PU Primer / All-Surface Epoxy Primer and finishing with one or more coats of approved quality PU Enamel Paint to obtain a good and uniform appearance. The work shall be completed in all respects as per the directions of the concerned officials. |
| 87 | Providing and fixing MS clamps suitable for mounting a 6 kg Fire Extinguisher, including fixing the clamp to the body of the boat using SS base plates, bolts, and nylock nuts; providing a suitable FRP bottom support for proper seating of the fire extinguisher; cutting and making necessary openings in the FRP surface wherever required; carrying out the required FRP works to restore and neatly finish the surface after installation; and completing the work in all respects as per the directions of the concerned officials. |
| 88 | Providing and marking the Plimsoll and Draft Lines on the boat as per the prescribed standards and relevant rules, including all necessary surface preparation, painting, and finishing, complete in all respects as per the directions of the concerned officials. |
| 89 | Providing and displaying all mandatory instructions in the boat as required under the rules and guidelines of the Kerala Maritime Board, by affixing good quality stickers or standard lettering at appropriate locations. The work shall include supplying, printing, and properly fixing the instructions wherever necessary, and shall be completed in all respects as per the directions of the concerned officials. |
| 90 | Loading the speed boat at EABC, Anayirangal and transporting it to SMVBC, Mattupatty for carrying out the Dry Dock Survey works, including safe unloading at the destination. The work shall include all necessary arrangements for handling and transportation and shall be completed in all respects as per the directions of the concerned officials. Please Enable Macros to View BoQ information |
| SR No | FileName | File Description |
| 1 | Click here to download tender document | Tender Documents |
| 2 | Click here to download tender document | Tender Documents |
| 3 | Click here to download tender document | Tender Documents |
| 4 | Click here to download tender document | Tender Documents |
Copyright © 2026 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail