| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. |
| 2 | P/L in position in C.C specified grade excluding the cost of centering, shuttering ,finishing and reinforcement ( 1:6:12)with cement ,fine sand and 40mm gauge B/ ballast i/c all as per PWD(SCH)273 |
| 3 | Providing and laying in position1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : |
| 4 | Steel reinforcement for R.C.C. work including straightening, cutting,bending, placing in position and binding all complete upto plinth level. |
| 5 | Centering and shuttering including strutting, etc. and removal of form for: |
| 6 | Class-150 brick work in 1:4 cement and coarse sand of 2.25 fineness modulous mortar in foundation and plinth including supply of all materials,labour and T&P etc.required for proper completion of the work |
| 7 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor V level in all shapes and sizes in :Cement mortar 1:4 (1 cement : 4 coarse sand) |
| 8 | Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works. |
| 9 | 12 mm thick plaster in 1:4 cement & f/sand mortor i/c all as per 13.1.1 |
| 10 | Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete.as per 13.80 |
| 11 | Finishing walls with Premium Acrylic Smooth exterior paint with Silicone additives of required shade:13.47.1 New work (Two or more coats applied @ 1.43 ltr/10 sqmover and including priming coat of exterior primer applied@ 2.20 kg/10 sqm) asper 13.47.1 |
| 12 | Painting with synthetic enamel paint of approved brand and manufacture to give an even shade :Two or more coats on new work. |
| 13 | Supply and fixing of information sign board including letter writing and painting etc for compelition of work Please Enable Macros to View BoQ information |