|
| 1 | REPLACE THE RUBBER STATOR ON SLUDGE OIL DOSAGE PUMP AND CHECK THE ROTOR FOR WEAR. IT SHOULD HAVE SMOOTH POLISHED SURFACE. (FOR FIRST YEAR) | REPLACE THE RUBBER STATOR ON SLUDGE OIL DOSAGE PUMP AND CHECK THE ROTOR FOR WEAR. IT SHOULD HAVE SMOOTH POLISHED SURFACE. (FOR FIRST YEAR) |
| 2 | REPLACE THE RUBBER STATOR ON SLUDGE OIL DOSAGE PUMP AND CHECK THE ROTOR FOR WEAR. IT SHOULD HAVE SMOOTH POLISHED SURFACE. (FOR SECOND YEAR) | REPLACE THE RUBBER STATOR ON SLUDGE OIL DOSAGE PUMP AND CHECK THE ROTOR FOR WEAR. IT SHOULD HAVE SMOOTH POLISHED SURFACE. (FOR SECOND YEAR) |
| 3 | ANNUAL ROUTINES PACKAGE (FOR FIRST YEAR) | ANNUAL ROUTINES PACKAGE (FOR FIRST YEAR) |
| 4 | ANNUAL ROUTINES PACKAGE (FOR SECOND YEAR) | ANNUAL ROUTINES PACKAGE (FOR SECOND YEAR) |
| 5 | SPEARES FOR 6 MONTHLY ROUTINES (FOR FIRST YEAR) | SPEARES FOR 6 MONTHLY ROUTINES (FOR FIRST YEAR) |
| 6 | SPEARES FOR 6 MONTHLY ROUTINES (FOR SECOND YEAR) | SPEARES FOR 6 MONTHLY ROUTINES (FOR SECOND YEAR) |
| 7 | CHECK ALL SAFETY DEVICES AND CALIBRATE (FOR FIRST YEAR) | CHECK ALL SAFETY DEVICES AND CALIBRATE (FOR FIRST YEAR) |
| 8 | CHECK ALL SAFETY DEVICES AND CALIBRATE (FOR SECOND YEAR) | CHECK ALL SAFETY DEVICES AND CALIBRATE (FOR SECOND YEAR) |
| 9 | CHECK ALL VALVES, PUMPS AND SOLENOID VALVES FOR LEAKAGE, REPAIR IF NECESSARY (FOR FIRST YEAR) | CHECK ALL VALVES, PUMPS AND SOLENOID VALVES FOR LEAKAGE, REPAIR IF NECESSARY (FOR FIRST YEAR) |
| 10 | CHECK ALL VALVES, PUMPS AND SOLENOID VALVES FOR LEAKAGE, REPAIR IF NECESSARY (FOR SECOND YEAR) | CHECK ALL VALVES, PUMPS AND SOLENOID VALVES FOR LEAKAGE, REPAIR IF NECESSARY (FOR SECOND YEAR) |
| 11 | REPLACE NOZZLE FOR DO BURNER WITH NEW ONE (FOR FIRST YEAR) | REPLACE NOZZLE FOR DO BURNER WITH NEW ONE (FOR FIRST YEAR) |
| 12 | REPLACE NOZZLE FOR DO BURNER WITH NEW ONE (FOR SECOND YEAR) | REPLACE NOZZLE FOR DO BURNER WITH NEW ONE (FOR SECOND YEAR) |
| 13 | MANDAYS CHARGES AT CHENNAI (FOR FIRST YEAR) | MANDAYS CHARGES AT CHENNAI (FOR FIRST YEAR) |
| 14 | MANDAYS CHARGES AT CHENNAI (FOR SECOND YEAR) | MANDAYS CHARGES AT CHENNAI (FOR SECOND YEAR) |
| 15 | MANDAYS AT OTHER PORT IN INDIAN (FOR FIRST YEAR) | MANDAYS AT OTHER PORT IN INDIAN (FOR FIRST YEAR) |
| 16 | MANDAYS AT OTHER PORT IN INDIAN (FOR SECOND YEAR) | MANDAYS AT OTHER PORT IN INDIAN (FOR SECOND YEAR) |
| 17 | CEILING FOR ANTICIPATORY SPARE FOR TOW YEARS | CEILING FOR ANTICIPATORY SPARE FOR TOW YEARS |