| 1 | Dismantling of Lime Concrete, cement concrete grade M-10 and below including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres etc. complete as per direction of the Engineer-in-charge. |
| 2 | Earth work in excavation in foundation in hard soil within initial lead of 50m & initial lift of 1.50m and breaking clods to maximum 5 C.m. to 7 C.m size and laying in layers not exceeding 0.30m depth etc. complete as directed by the Engineer-in-charge. |
| 3 | Sand filling in foundation and plinth with all cost, conveyance, royalty, taxes with all labour charges, watering, ramming etc. complete as per the specification and direction of the Engineer-in-charge. |
| 4 | Cement concrete M-15 grade with 40mm and down grade black hard granite (crusherbroken) stone chips including hoisting and laying graded mixed in concrete mixtures including cost of all materials, machineries and labour and placing of mixed concrete with all leads, lifts, delifts upto 1.5m height above average ground level as per direction of Engineer-in-charge. |
| 5 | Cement concrete M-15 grade with 20mm and down grade black hard granite (crusherbroken) stone chips including hoisting and laying graded mixed in concrete mixtures including cost of all materials, machineries and labour and placing of mixed concrete with all leads, lifts, delifts upto 1.5m height above average ground level as per direction of Engineer-in-charge. |
| 6 | Cement concrete M-20 grade with 20mm and down grade black hard granite (crusherbroken) stone chips including hoisting and laying graded mixed in concrete mixtures including cost of all materials, machineries and labour and placing of mixed concrete with all leads, lifts, delifts upto 1.5m height above average ground level as per direction of Engineer-in-charge. |
| 7 | Rigid and smooth centering, shuttering including all cost, conveyance, taxes, royalty dismantling after specified period and removing the debris after completion of works clear off the work site etc. complete as per the direction of the Engineer-in-charge. |
| 8 | Supplying , fitting and placing of reinforcement including cutting ,bending,binding of M.S. rod size including all cost, conveyance, labour charges, taxes of reinforcement etc. complete as per the specification and direction of the Engineer-in-charge. |
| 9 | Earth work in filling the embankments with hard soil ofapproved quality within one extra lead over initial lead of 50m.& within initial lift of 1.50m. and breaking clods to maximum 5 C.m. to 7 C.m.size and laying in layers not exceeding 0.30m. depth etc. complete as directed by the Engineer-in-charge. Please Enable Macros to View BoQ information |