| 1 | Stage I: Construction of 6.0 KLD Capacity FSTP in Decentralized Wastewater Treatment System (DEWATS) Technology at Goreswar ULB |
| 2 | Schedule I: Engineering Services : Design Services |
| 3 | Sub Soil Investigation & Survey, Design, Drawings work based on the guidelines laid down in the Manual published by CPHEEO, Ministry of Housing & Urban Affairs and SBM (Urban) 2.0 as per socpe of the work of tender document.. |
| 4 | Schedule II: Civil Works for FSTP of 6.0 KLD Capacity in Decentralized Wastewater Treatment System (DEWATS) Technology |
| 5 | Design, supply, construction, installation, testing and commissioning of Sludge Receiving Chamber |
| 6 | Design, supply, construction, installation, testing and commissioning of Inlet Chamber |
| 7 | Design, supply, construction, installation, testing and commissioning of Unplanted Sludge Drying bed |
| 8 | Design, supply, construction, installation, testing and commissioning of Leachate Sump |
| 9 | Design, supply, construction, installation, testing and commissioning of Anaerobic Baffled Reactor |
| 10 | Design, supply, construction, installation, testing and commissioning of Horizontal Planted Gravel Filter |
| 11 | Design, supply, construction, installation, testing and commissioning of Polishing Pond |
| 12 | Design, supply, construction, installation, testing and commissioning of Vehicular Ramp |
| 13 | Schedule III: Electrical Work for FSTP |
| 14 | Design, supply, installation, testing and commissioning of internal wiring for light, fan, exhaust fan, call bell points, light/power circuits and sub mains with GI boxes & modular plates; distribution boards with MCBs; lights and fans; LT cable laying (1.1 kV grade); Main LT Panel (incoming: 2 nos. 63A TP MCB 18kA with thermal magnetic release from transformer & DG set); street lighting including poles and associated items; and complete earthing system. |
| 15 | Schedule IV :Power Connection for FSTP |
| 16 | Providing electrical power connection of required kVA to STP & Lifting station site including drawal of electrical power line from the nearby APDCL Grid, setting up of required capacity Sub-Station, providing electrical control panel & metering unit etc. and obtaining necessary approval & load sanction from APDCL and payment of supervision & other charges to APDCL |
| 17 | Schedule V: Electro Mechanical works for FSTP |
| 18 | Design, supply, erection, testing and commissioning of all Mechanical works for FTP including Coarse Bar Screen, Fine Stainless-Steel Screen, Chlorine Dosing Pump, Chlorine Dosing tank agitator, Electro-Magnetic Flow Meter, Pen stock gate/sluice, Pressure Gauge, Level Sensors (For All Pumps), Pipe & fittings with all accessories, PH meter, Dissolved Oxygen Meter, Valve & fittings, etc and all associated components installed and completed in accordance with the Employer's Requirements. |
| 19 | Schedule VI: Construction of Community Level Soak Pit System. |
| 20 | Design and Construction of Community Level Soak Pit System with Screen Chamber, Settling Tank, Soak Pit as per the standard engineering practice outlined in the CPHEEO Manual and IS 2470 & all complete as per Employer's Requirements. |
| 21 | Schedule VII: Infrastructure Works |
| 22 | Design & Construction of Internal Path and Approach Road, complete in all respects, as directed by the Engineer-in-Charge/Employer. |
| 23 | Design & Construction of Gate complete in all respects, as directed by the Engineer-in-Charge/Employer. |
| 24 | Design & Construction of Boundary Wall / Fencing at Treatment plant, as directed by the Engineer-in-Charge/Employer. |
| 25 | Design & Construction of Office cum Storage Building at Treatment plant, as directed by the Engineer-in-Charge/Employer. |
| 26 | Schedule VIII: Five Year O&M (Operation and Maintenance (after completion of Capex work and trial & satisfactory commissioning of complete project) |
| 27 | Operation & Maintenance of the entire Faecal Sludge Treatement project including Manpower, chemicals and material, repairing of all components as required, painting of civil or non-civil structures (if any), retrofitting works of the civil structure wherever necessary and management of FSTP, pumps and motors, including mechanical, electrical panels, necessary accessories. It also includes activities for maintenance of campus development, laboratory, etc. for 5(Five) years.(APDCL Energy Charges will be borne by the ULB) |
| 28 | 1st year of Operation and Maintenance |
| 29 | 2nd year of Operation and Maintenance |
| 30 | 3rd year of Operation and Maintenance |
| 31 | 4th year of Operation and Maintenance |
| 32 | 5th year of Operation and Maintenance |
| 33 | Stage II: Construction of 6.0 KLD Capacity FSTP in Decentralized Wastewater Treatment System (DEWATS) Technology at Tihu ULB |
| 34 | Schedule IX: Engineering Services : Design Services |
| 35 | Sub Soil Investigation & Survey, Design, Drawings work based on the guidelines laid down in the Manual published by CPHEEO, Ministry of Housing & Urban Affairs and SBM (Urban) 2.0 as per socpe of the work of tender document.. |
| 36 | Schedule X: Civil Works for FSTP of 6.0 KLD Capacity in Decentralized Wastewater Treatment System (DEWATS) Technology |
| 37 | Design, supply, construction, installation, testing and commissioning of Sludge Receiving Chamber |
| 38 | Design, supply, construction, installation, testing and commissioning of Inlet Chamber |
| 39 | Design, supply, construction, installation, testing and commissioning of Unplanted Sludge Drying bed |
| 40 | Design, supply, construction, installation, testing and commissioning of Leachate Sump |
| 41 | Design, supply, construction, installation, testing and commissioning of Anaerobic Baffled Reactor |
| 42 | Design, supply, construction, installation, testing and commissioning of Horizontal Planted Gravel Filter |
| 43 | Design, supply, construction, installation, testing and commissioning of Polishing Pond |
| 44 | Design, supply, construction, installation, testing and commissioning of Vehicular Ramp |
| 45 | Schedule XI: Electrical Work for FSTP |
| 46 | Design, supply, installation, testing and commissioning of internal wiring for light, fan, exhaust fan, call bell points, light/power circuits and sub mains with GI boxes & modular plates; distribution boards with MCBs; lights and fans; LT cable laying (1.1 kV grade); Main LT Panel (incoming: 2 nos. 63A TP MCB 18kA with thermal magnetic release from transformer & DG set); street lighting including poles and associated items; and complete earthing system. |
| 47 | Schedule XII :Power Connection for FSTP |
| 48 | Providing electrical power connection of required kVA to STP & Lifting station site including drawal of electrical power line from the nearby APDCL Grid, setting up of required capacity Sub-Station, providing electrical control panel & metering unit etc. and obtaining necessary approval & load sanction from APDCL and payment of supervision & other charges to APDCL |
| 49 | Schedule XIII: Electro Mechanical works for FSTP |
| 50 | Design, supply, erection, testing and commissioning of all Mechanical works for FTP including Coarse Bar Screen, Fine Stainless-Steel Screen, Chlorine Dosing Pump, Chlorine Dosing tank agitator, Electro-Magnetic Flow Meter, Pen stock gate/sluice, Pressure Gauge, Level Sensors (For All Pumps), Pipe & fittings with all accessories, PH meter, Dissolved Oxygen Meter, Valve & fittings, etc and all associated components installed and completed in accordance with the Employer's Requirements. |
| 51 | Schedule XIV: Construction of Community Level Soak Pit System. |
| 52 | Design and Construction of Community Level Soak Pit System with Screen Chamber, Settling Tank, Soak Pit as per the standard engineering practice outlined in the CPHEEO Manual and IS 2470 & all complete as per Employer's Requirements. |
| 53 | Schedule XV: Infrastructure Works |
| 54 | Design & Construction of Internal Path and Approach Road, complete in all respects, as directed by the Engineer-in-Charge/Employer. |
| 55 | Design & Construction of Gate complete in all respects, as directed by the Engineer-in-Charge/Employer. |
| 56 | Design & Construction of Boundary Wall / Fencing at Treatment plant, as directed by the Engineer-in-Charge/Employer. |
| 57 | Design & Construction of Office cum Storage Building at Treatment plant, as directed by the Engineer-in-Charge/Employer. |
| 58 | Schedule XVI: Five Year O&M (Operation and Maintenance (after completion of Capex work and trial & satisfactory commissioning of complete project) |
| 59 | Operation & Maintenance of the entire Faecal Sludge Treatement project including Manpower, chemicals and material, repairing of all components as required, painting of civil or non-civil structures (if any), retrofitting works of the civil structure wherever necessary and management of FSTP, pumps and motors, including mechanical, electrical panels, necessary accessories. It also includes activities for maintenance of campus development, laboratory, etc. for 5(Five) years.(APDCL Energy Charges will be borne by the ULB) |
| 60 | 1st year of Operation and Maintenance |
| 61 | 2nd year of Operation and Maintenance |
| 62 | 3rd year of Operation and Maintenance |
| 63 | 4th year of Operation and Maintenance |
| 64 | 5th year of Operation and Maintenance Please Enable Macros to View BoQ information |