|
| 1 | CIVIL |
| 2 | 2.6.1Earth work in excavation by mechanical means (Hydraulic excavator)/manual meansover areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan)including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5m, as directed by Engineer-in-charge.All kinds of soil |
| 3 | 44.1.8Providing and laying in position cement concrete of specified grade excluding the costof centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarsesand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mmnominal size derived from natural sources) |
| 4 | 5.9.1Centering and shuttering including strutting, etc. and removal of form for:Foundations,footings, bases of columns, etc for mass concrete |
| 5 | 5.22.6Steel reinforcement for R.C.C work including straightening, cutting, bending, placingin position and binding all complete upto plinth levelThermo - Mechanically Treatedbars of grade Fe-500D or more |
| 6 | 5.1.2Providing and laying in position specified grade of reinforced cement concrete,excluding the cost of centering, shuttering, finishing and reinforcement - All work upto plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mmnominal size derived from natural sources) |
| 7 | 13.1.112 mm cement plaster of mix:1:4 ( 1 cement : 4 fine sand)CEMENT PLASTER |
| 8 | 2.25Filling available excavated earth (excluding rock) in trenches, plinth, sides offoundation etc. in layers not exceeding 20 cm in depth, consolidating each depositedlayer by ramming and watering, lead up to 50 m and lift up to 1.5 m. |
| 9 | OD143869/2025-2026Road cutting Charges, Crane Charges |
| 10 | ELECTRICAL WORK |
| 11 | OD143855/2025-20267 Mtr GI Octagonal Pole with ring arm bracket for holding luminaries with top 90mmand bottom 210 mm dia. made of 3mm sheet thickness, base plate of size not less than 350x350x25mm,ringarm bracket,foundation bolts and all accessories included.Foundation casting should be made be with M25grade concrete in 600x600mm and 1300mm under soil and 200mm above ground level along with required reinforcement as required. The entire structure should withstand wind velocity of 150 km/hour . |
| 12 | OD143863/2025-2026Solar Panel of 200Wp Mono - Crystalline with excellent aging resistance and UVendurance to withstand harsh environment, environmentally sealed to IP67. |
| 13 | OD143861/2025-2026Street Luminaire shall have min 50W , 8400 Lumens System output dimmable,greater than 160 Lumens Per watt system efficiency, IP66 & IK10 Protection, luminaire made ofPressure Diecast aluminum Housing and individual lens for each LED embedded on PC cover. Minimum 75,000burning hours as per L70. |
| 14 | OD143860/2025-2026Supply and installation of battery box and solar moulding structure made by materialthat are durable, resistant to corrosion & abrasion and highly stable in heat. |
| 15 | OD143857/2025-2026Supply and drawing the following sizes of multi-core PVC insulated &FRLS PVC sheathed 650/1100 V grade copper conductor round flexible cables conformingto IS 694 part I 1960 in the existing surface / recess conduit as required includinggiving necessary connections of the following sizes.2 core 2.50 sq mm |
| 16 | OD143858/2025-2026Supply and fixing of Name Board with Angles, Flats, Square pipe, ACP Sheetincluding Nut &Bolt |
| 17 | OD143854/2025-2026supply and fixing of Inter connecting wires and accessories for the solar light system.WIRING ACESSORIES |
| 18 | OD143859/2025-2026Lithium Ferro Phosphate type Battery with 90Ah 12.8V with 1152Wh Maintenancefree having minimum2000 cycles life |
| 19 | OD143856/2025-2026The Charge controller using in the system shall be MPPT type Programmable andDimmable with > 93% efficiency, IP67 Connectors, built in protection of Battery Reverse Polarity, PanelReverse Polarity, Panel Reverse Current, Surge Protection at PV input, Battery Over Voltage, Load shortcircuit and fuse protection in series for battery.CONTROLLER |
| 20 | OD143862/2025-2026Fabrication ,supply, conveyance and installation of Granite name board indicating thecost involved, the commencement, completion and inauguration date etc.GRANITE Please Enable Macros to View BoQ information |