|
| 1 | Supply, fabrication and erection of shutter and hoisting |
| 2 | OD2631/2025-2026:Dismantling of the Canal Shutter ( Up to 2 Tonne weight ) / Hoisting Unit / Embedded parts etc. of the same and stacking at a distance of 100 meter including hire of machinery labour etc. complete as directed by the departmental officer at the site.(Weight of the unserviceable shutters and embedded parts may be calculated as 60% and unserviceable hoisting units as 80 % ) |
| 3 | OD1927/2025-2026:Supply of MS plates confirming to IS 2062GrB including cost of conveyance charges |
| 4 | OD1928/2025-2026:Supply of MS Tees, Angles, Joists, ISMB, ISMC confirming to IS2062GrA/B including cost of conveyance charges |
| 5 | OD1929/2025-2026:Supply of MS round bar including cost of conveyance charges |
| 6 | OD1924/2025-2026:Fabrication and supply of Structural steel canal shutters ( Up to 2 tonne weight ) /Hoisting Bridge /Platform and accessories etc. for the same as per approved specifications, drawings and directions of deptl. officer at site including cost of labour, machinery, all leads and lifts, incidental and handling charges etc complete but excluding cost of material already supplied |
| 7 | 85.114:Painting all the exposed surfaces of the gate and embedded parts with two coats of epoxy coal tar black paint confirming to IS14948 with a minimum film thickness of 150+/-5 microns per each coat over two coats of priming coat applied with zinc primer containing not less than 85% of zinc on dry film with a film thickness of 70+/-5 microns , so that the total film thickness of all coats including priming coat at any rate is not less than 350 microns after cleaning the surface using hand and power tool cleaning including cost of all materials, labour charges , cost of testing all painting materials, all incidental charges, hire of T&P etc. complete as per the direction of department officers at site |
| 8 | 85.115:Cost of painting with 2 coats of enamel paint over 1 coat of zinchromate primer as per IS1477:1994 after hand and power tool cleaning including cost of all materials, labour charges, cost of testing all painting materials, all incidental charges, hire of T&P etc. complete as per the direction of department officers at site |
| 9 | OD1925/2025-2026:Erection of the canal shutter (Up to 2 Tonne weight) /Hoist Bridge /Platform including hand rails . lader etc for the same including, alignment correcting and setting complete including cost of all labour, machinery , incidental and conveyance, lead and lift charges etc complete but excluding cost of material already supplied. |
| 10 | OD2655/2025-2026:Supply of EN8 rod of Dia 32mm ncluding cost of conveyance charges |
| 11 | Operating mechanism |
| 12 | OD1921/2025-2026:Providing EN-8 Screw (63 mm) rod with one number of EN-8 Screw shaft, hand operation including the cost of all materials, labour, hire charges and conveyance. |
| 13 | OD2632/2025-2026:Providing base and nut arrangement for hoisting the shutter including cost of all materials labour etc |
| 14 | Valves |
| 15 | OD2642/2025-2026:Bailing out water Using 5HP Pump- Bailing out water with 5HP engine and pump set including conveyance to site and erection,cost of fuel, lubrication oil and other stores, pay of staff etc complete |
| 16 | OD2641/2025-2026:Removing mud and soil by mechanical means/ manual means from well of depth of 2m below the ground level in which valve is placed including disposal of excavated earth, lead up to 50 m and lift up to 2 m, disposed earth to be levelled and neatly dressed as per the direction of the Departmental officers at site including cost of labour, tools and plants etc complete |
| 17 | OD2636/2025-2026:Cutting the bolts and nuts for dismantling the bonnet and stem bushing from the valve body and lifting the bonnet of valve, gland, gland flange, stem packing, stem, stem nut and disc from the well by using derrick and chain block including cost of labour, hire charge of tools and plants etc complete as per the directions of Departmental officers at site |
| 18 | OD2645/2025-2026:Lifting the bonnet of valve, gland, gland flange, stem packing, stem, stem nut and disc from the well by using derrick and chain block including cost of labour, hire charge of tools and plants etc complete as per the directions of Departmental officers at site |
| 19 | OD2649/2025-2026:Lifting the bonnet of valve, gland, gland flange, stem packing, stem, stem nut and disc from the hanging fitting using derrick and chain block including cost of labour, hire charge of tools and plants etc complete as per the directions of Departmental officers at site |
| 20 | OD2643/2025-2026:Casting machining and supplying valve stem nut made of brass including cost of material machining labour etc complete |
| 21 | OD2647/2025-2026: Supply of Stainless steel spindle of diametre 32mm IS 6603 Gr20Cr12 including cost of all materials, labour, hire charges and conveyance |
| 22 | OD2646/2025-2026:Supply of SS Bolt and Nuts |
| 23 | OD2648/2025-2026:Supply of Head gasket/ stem bushing gasket including cost of all materials, labour, hire charges and conveyance. |
| 24 | OD2637/2025-2026:Supply of key for hand wheel of valve including cost of material conveyance etc complete |
| 25 | OD2640/2025-2026:Supply of Bonnet gasket as per the existing dimensions and specifications including cost of materials conveyance etc complete |
| 26 | OD2638/2025-2026:Checking and cleaning inside the valve including valve seat etc |
| 27 | OD2633/2025-2026:Erecting the valve by using derrick and chain block including cost of labour, hire charge of tools and plants etc complete as per the directions of Departmental officers at site |
| 28 | OD4730/2025-2026:Providing temporary platform for lifting the valve stem hub and cutting the bolt and nuts and erecting the valve including cost of materials labour, fabrication charges etc complete as per the direction from the deptl officers at site Please Enable Macros to View BoQ information |