| 1 | Demolishing cement concrete manually or by mechanical means including disposal of unserviceable material in dumping yard outside the Infopark campus as per direction of Engineer-in-charge. |
| 2 | Demolishing brickwork (with or without tiles) in cement mortar/adhesive, manually/by mechanical means including stacking of serviceable materials and disposal of unserviceable material in dumping yard outside the Infopark campus as per direction of Engineer-in-charge. |
| 3 | Demolishing RCC work manually/by mechanical means including stacking of steel bars and disposal of unserviceable material in dumping yard outside the Infopark campus as per directions of Engineer-in-charge. |
| 4 | Dismantling aluminium / Gypsum/ Glass/wooden/ACP partitions/panelling, boarding, wooden planks, softboard/ecoboard, doors, windows, louvers, fixed glazing with or without frame and false ceiling including stacking of serviceable material and disposal of unserviceable surplus material outside the Infopark campus as directed by Engineer - in-Charge |
| 5 | Dismantling water closet carefully, clearing away and stacking of serviceable material and disposal of unserviceable surplus material outside the Infopark campus as per directions of Engineer-in-charge. |
| 6 | Dismantling wash basin, sink including Fittings (cp cock & angle cock) etc. carefully, clearing away and stacking of serviceable material and disposal of unserviceable surplus material outside the Infopark campus as per directions of Engineer-in-charge. |
| 7 | Dismantling urinal carefully, clearing away and stacking the material in the stockyard within Infopark campus as per directions of Engineer-in-charge. |
| 8 | Dismantling Pillar cock , angle cock, health faucet, sink tap etc. carefully, clearing away and stacking the material in the stockyard within Infopark campus as per directions of Engineer-in-charge. |
| 9 | Dismantling Consealed pipe line carefully, clearing away and stacking of serviceable material and disposal of unserviceable surplus materials in dumping yard outside Infopark campus as per direction of engineer-in-charge |
| 10 | Dismantling mirror carefully, clearing away and stacking the material in the stockyard within Infopark campus as per directions of Engineer-in-charge. |
| 11 | Dismantling tile work in floors/walls laid in cement mortar/adhesive including stacking of serviceable material and disposal of unserviceable surplus material outside the Infopark campus as directed by Engineer - in-Charge |
| 12 | Dismantling Granite counter carefully, clearing away and stacking of serviceable material and disposal of unserviceable surplus materials in dumping yard outside Infopark campus as per direction of engineer-in-charge |
| 13 | Removing white or colour wash by scrapping and sand papering and preparing the surface smooth including necessary repairs to scratches etc. complete. |
| 14 | Providing and laying cement concrete 1:1.5:3 using stone aggregate 20 mm nominal size etc. complete as per directions of Engineer-in-charge. |
| 15 | Reinforced cement concrete work in beams, suspended floors, roofs, having slope upto 15 degree landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases, excluding the cost of centering and shuttering, finishing and reinforcement, with 1:2:4 (1cement : 2 coarse sand : 4 graded stone aggregate 20mm nominal size) |
| 16 | Centering and shuttering including strutting, propping etc. and removal of form work for lintel |
| 17 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete at all levels using Thermomechnically treated bars of grade Fe500D or more |
| 18 | Solid block masonry using precast solid blocks factory made of size 40x20x10 cm or nearest available size confirming to IS 2185 part 1 of 1979 for superstructure of thickness 10 cm and above in CM 1:6 etc complete as per directions of Engineer-in-charge. |
| 19 | Providing and laying water proofing treatment in sunken portion of WCs, bathroom etc., by applying cement slurry mixed with water proofing cement compound (approved by infopark) consisting of applying : a) First layer of slurry of cement @ 0.488 kg/sqm mixed with water proofing cement compund @ 0.253 kg/sqm. This layer will be allowed to air cure for 4 hours. b) Second layer of slurry of cement @ 0.242 kg /sqm mixed with water proofing cement compound @ 0.126 kg/ sqm. This layer will be allowed to air cure for 4 hours followed with water curing for 48 hours. The rate includes preparation of surface, treatment and sealing of all joints, corners, junctions of pipes and masonry with polymer mixed slurry. |
| 20 | Rough plastering for dadoing - Providing 6 mm cement plaster 1:3 (1 cement: 3 coarse sand) finished rough to receive dadoing etc. complete as per directions of Engineer-in-charge. |
| 21 | Smooth plastering of surface for painting - providing 12 mm thick cement plaster of mix 1:4 (1 cement : 4 fine sand) finished with a floating coat of neat cement etc complete as per directions of Engineer-in-charge |
| 22 | Providing and laying vitrified floor tiles of size 1200x600 mm (thickness to be specified by the manufacturer) with water absorption less than 0.08% and conforming to IS : 15622, of approved make, in all colours and shades in skirting riser of steps over 12 mm thick bed of cement mortar 1:3 (1 cement : 3 coarse sand), including grouting the joints with matching colour epoxy filling width upto 5mm., complete as per directions of Engineer-in-charge. |
| 23 | Providing and laying vitrified Wall tiles of size 1200x600 mm (thickness to be specified by the manufacturer) with water absorption less than 0.08% and conforming to IS : 15622, of approved make, in all colours and shades in skirting riser of steps over 12 mm thick bed of cement mortar 1:3 (1 cement : 3 coarse sand),including grouting the joints with matching colour epoxy filling width upto 5mm and PVC corner profile complete as per directions of Engineer-in-charge. |
| 24 | Providing and fixing at all height false ceiling conforming to IS:2095 (BS 1230) including providing and fixing of frame work made of special sections power pressed from GI sheet and galvanized in accordance with zinc coating of grade 350 as per IS:277 and consisting of angle cleat of size 25mm wide x 1.6mm thick with flanges of 22mm and 37mm at 1200mm centre to centre one flange fixed to the ceiling with dash fastener 12.5mm dia x 40mm long with 6 mm dia bolts to the angle hangers of 25x 25x 0.55 mm of required length, and other end of angle hanger being fixed with nut and bolts to GI channels 45x15x0.9mm running at the rate of 1200mm centre to centre to which ceiling section 0.5mm thick bottom wedge of 80mm with tapered flanges of 26mm each having clips of 10.5mm at 450mm centre to centre shall be fixed in a direction perpendicular to GI channel with connecting clips made out of 2.64mm dia x230 mm long GI wire at every junction including fixing the gypsum board with ceiling section and perimeter channels 0.5mm thick 27mm high having flanges of 20 mm and 30 mm long, The perimeter of ceiling shall be fixed to wall / partition with the help of raw plugs at 450 mm centre to centre with 25 mm long drive-all screws @ 230 mm interval including jointing and fixing to a flush finish of tapered and square edges of the gypsum board with recommended filler, paper tapes, finisher and two coats acrylic emulsion paint over two coats of primer suitable for gypsum board as per manufacturers specification after application of E-Mix/ Pop / Gypsum putty and all as per manufacturer’s specification etc completeand all as directed.and also including the cost of making openings for light fittings, grills, diffusers, trap doors, cutouts made with frame of perimeter channels suitably fixed all complete as per directions of engineer-in-charge. Vertical visible areas in drop ceiling will be measured separetely. |
| 25 | 12.5 mm thick Moisture resistant board |
| 26 | 12.5 mm thick tapered edge gypsum plain board |
| 27 | Providing and fixing in true horizontal level false ceiling with GI metal ceiling Lay in perforated bevelled tegular edge/ microlook global white colour tiles of size 595x595 mm and 0.5 mm thick with 8 mm drop made of GI sheet having galvanising of 100 gms/sqm (both sides inclusive) and 20% perforation area with 1.8 mm dia holes and having NRC of 0.5, electro statically polyster powder coated of thickness 60 micron (minimum), including factory painted after bending and perforation, and backed with black glass fibre acoustical fleece laid in silhouette grid system with 15mm white flanges incorporating a 6mm central reveal in white/ black colour manufactured by approved supplier, using hot dipped galvanized steel section, exposed surface chemically cleaned capping pre-finished in baked polyester paint wall angle of size 3000mm x 19mm x 19mm used in periphery of the ceiling fixed to the wall partition/ RC column/ band walls with the help of screws at 600mm c/c. Main runner to be suspended from celing using GI slotted cleats of size 27x37x25x1.5 mm fixed to celing with 12.5 mm dia and 50 mm long dash fasteners, 4 mm GI adjustable rods with galvasined butterfly level clips of size 85x30x0.8 mm spaced at 1200 mm c/c along main tee and 1200mm long cross tee to be interlocked between in Main runner at 600mm c/c (max) to form a grid of 1200 x 600mm long cross tee fixed in between 1200mm long cross tee for forming a grid of 600mm x 600mm. The rate shall be inclusive of making openings for light fittings, grills, diffusers, cutouts, wastage and necessary hardware etc. The grid tiles which are replaced by diffucers/ lights should be handed over to Infopark. |
| 28 | Applying one coat of water thinnable cement primer of approved brand and manufacture on wall surface etc complete as per directions of Engineer - in - charge. |
| 29 | Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete as per directions of Engineer - in - charge. |
| 30 | Painting two or more coats with premium acrylic emulsion paint of interior grade, having VOC (Volatile Organic Compound ) content less than 50 grams/ litre. of approved brand and manufacture, including applying additional coats wherever required to achieve even shade and colour as per directions of Engineer-in-charge. |
| 31 | Painting with synthetic enamel paint (two or more coats) of approved brand and manufacture of required colour to an give even shade including preparation of surface by scrapping/cleaning etc. as per directions of Engineer-in-charge. |
| 32 | Providing & applying of two or more coats of Water Proof Painting for walls with two coats of suitable primer for even shade finish as per the direction as Engineer-In-charge. |
| 33 | Providing and fixing white vitreous china extended wall mounting water closet of approved make and suitable size of approved shape including providing & fixing white vitreous china cistern with dual flush fitting, of flushing capacity 3 litre/ 6 litre (adjustable to 4 litre/ 8 litres), including P trap, soft close seat cover, and cistern fittings, nuts, bolts and gasket etc complete. Works including cutting and making good the walls /floor wherever required, including cost and conveyance of all materials to the site, all labour charges, all taxes etc., complete finished item of work and as directed by the Site Engineer/Project In-Charge. The side gap between ewc mouth and pan connector to be filled with silicon sealant. |
| 34 | Providing and fixing white vitreous urinal of suitable size of approved shape with inlet from back side and pressmatic auto closing concealed urinal flush valve with wall flange, including fixing to wall with suitable brackets all as per manufacturers specification and as per directions of Engineer-in-charge . |
| 35 | Providing and fixing washbasin with integrated half pedestal of approved make and colour along with CP fittings of approved make such as 15mm CP brass pillar cock, 15mm CP brass angular stop cock, 32mm dia CP brass waste coupling, 32mm dia CP brass bottle trap with extension pipe including necessary supporting brackets, connection tube etc; complete. The supporting brackets, bolt and nuts supplied by the contractor. Works including cutting and making good the walls /floor wherever required, including conveyance of all materials to the site, all labour charges, all taxes etc; complete. |
| 36 | Supplying and fixing CP Health Faucet of superior quality including cost of materials and labour charges etc complete as per the direction of site Engineer-in-charge. |
| 37 | Supplying and fixing CP Angle cock of superior quality including cost of materials and labour charges etc complete as per the direction of site Engineer-in-charge. |
| 38 | Supply and installation of 8mm tempered frosted glass for urinal partition with approved shape as per the requirement of site by fixing clamps as required for supporting glass as per direction of Engineer-in-charge. (Approximate size - 900mm x 450mm) |
| 39 | Providing and fixing beveled edge mirror of superior glass (of approved quality) complete fixed with stainless steel flat headed mirror screw and washers. Necessary back support should be provided if needed and edges should be properly treated to prevent peeling off of mirror film complete as per direction of Engineer-in-charge. (Approximate size of mirror - 550mm x 750mm) |
| 40 | Providing and fixing Stainless steel satin finish Towel rod 600 mm long or nearest available length with brackets fixed to SS cleats with necessary fittings of approved quality complete as per the direction of Engineer-in-charge. |
| 41 | Supplying and fixing of CP Anti cockroach floor trap gratings consisting floor drain grating, inner filter and outer filter and rim, fixed over the floor trap. Works including cleaning of floor traps before fixing the gratings. While fixing the gratings, flooring should be cut to required size of grating, (not more than 2mm of the grating sizes) using tile cutter etc; complete. The gap should be filled silicon sealant to match the flooring color. The color and shape of the gratings shall be got the approval from Infopark. To avoid damage of the cp gratings, acid cleaning of flooring shall be done before fixing of gratings. |
| 42 | Supplying, fixing and testing of 110 or 75 mm dia SS Floor clean out used in sunken floors, 75 or 110 mm dia extension boss tee arrangements. |
| 43 | Supply, fabrication and installation of MS shaft door with frame(Approzimate size 60cm X 120cm) including all nessessary hardwares like, Hinges, lock, inserted handle etc. all complete as per direction of Engineer-in-charge |
| 44 | Providing and fixing Fiber Glass Reinforced plastic (FRP) Door Frames of cross- section 90 mm x 45 mm having single rebate of 32 mm x 15 mm to receive shutter of 30 mm thickness. The laminated shall be moulded with fire resistant grade unsaturated polyester resin and chopped mat. Door frame laminate shall be 2 mm thick and shall be filled with suitable wooden block in all the three legs. The frame shall be covered with fiber glass from all sides. M.S. stay shall be provided at the bottom to steady the frame. The frames shall be fixed in existing opening including with dash fasteners/ chemical fasteners of appropriate size ( 3 nos on each vertical member of door chowkhat and 2 nos on each vertical member of window chowkhats), including cost of dash fasteners/ chemical fastener etc. complete as per directions of Engineer-in-charge. |
| 45 | Providing and fixing to existing door frames 30 mm thick Glass Fibre Reinforced Plastic (FRP) panelled door shutter of required colour and approved brand and manufacture, made with fire - retardant grade unsaturated polyester resin, moulded to 3 mm thick FRP laminate for forming hollow rails and styles, with wooden frame and suitable blocks of seasoned wood inside at required places for fixing of fittings, cast monolithically with 5 mm thick FRP laminate for panels conforming to IS : 14856, including fixing to frames, Handles latch with/without lock (as per site condition) with 2 keys, door closer, tower bolt etc. complete as per directions of Engineer-in-charge. |
| 46 | Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot & cold water supply, including all CPVC plain & brass threaded fittings including fixing the pipe with clamps at 1.00 m spacing. This includes jointing of pipes & fittings with one step CPVC solvent cement and testing of joints complete as per direction of Engineer-in-Charge. After laying the pipes, before closing the pipes, Pressure test to be conducted and get the approval from the Engineer-in-charge. Internal work- Concealed work, including cutting chases and making good the walls etc. |
| 47 | 20 mm nominal outer dia pipes |
| 48 | 25 mm nominal outer dia pipes |
| 49 | 32 mm nominal outer dia pipes |
| 50 | Providing and fixing of approved make of 50 mm dia 10kgf/cm2 PVC pipes confirming to IS 4985-2000. and fittings (moulded and fabricated fittings ) such as tee, elbow, 'y', coupler, multi-purpose trap etc confirming to IS 7834 with latest amendment for soil and waste pipe works in toilets and utility area, etc complete. Pipes shall be laid in sunken floors with proper gradient with proper brick pedestal supports. For laying the pipes in walls, before chasing, the pipe line routing shall be marked using chalk line with the help of Hilti make leveling instrument; wall cutting shall be done using wall cutting machine, and chasing to be done using electric jack hammer machine. Cutting and chasing with hammer shall not be permitted. Pipes and fittings shall be cleaned with pipe cleaners and joined by approved make solvent cement. After laying the pipes, before closing the pipes, gravity test to be conducted and get the approval from the Engineer-in-charge. Chased portions shall be covered with cement mortar. Work includes making required size holes in brick walls wherever necessary and redoing the same with water proofing components to the entire satisfaction of Engineer-in-charge, etc complete. All the stub outs shall be closed with proper end caps until the installation of Sanitarywares and accessories etc; complete. |
| 51 | Providing, fixing and testing of approved make of 75 mm dia SWR - B- Class PVC pipes and fittings confirming to IS 13592-1992. and fittings (avialable fittings in market and fabriacted fittings ) such as tee, elbow, 'y' , coupler, multi-purpose trap etc. confiming to 14735 with latest amendment for soil and waste pipe works in toilets and utility area,etc. Pipes shall be laid in vertical stack and sunken in floors as per approved layout with proper allignment and gradient as per the layout with proper split clamp,anchor fastener and 10mm thread rod supports.Wall cutting shall be done using wall cutting machine, and chasing to be done using electric jack hammer machine. Cutting and chasing with hammer shall not be permitted. Pipes and fittings shall be cleaned with pipe cleaners and joined by approved make solvent cement. After laying the pipes, before closing the pipes, gravity test to be conducted and get the approval from the Engineer-in-charge. Chased portions shall be covered with cement morter. Work includes making required size holes in brick walls wherever necessary and re do same with water proofing components to the entire satisfaction of Engineer-in-charge.etc complete. All the stub outs shall be closed with proper end caps till of installation of sanitraywares and accessories etc. complete. |
| 52 | Providing, fixing and testing of approved make of 110 mm dia SWR - B- Class PVC pipes and fittings confirming to IS 13592-1992. and fittings (avialable fittings in market and fabriacted fittings ) such as tee, elbow, 'y' , coupler, multi-purpose trap etc. confiming to 14735 with latest amendment for soil and waste pipe works in toilets and utility area,etc. Pipes shall be laid sunken in floors and in vertical stack as per approved layout with proper allignment and gradient as per the layouts with proper split clamp, anchor fastener and 10 mm thread rod supports. Wall cutting shall be done using wall cutting machine, and chasing to be done using electric jack hammer machine. Cutting and chasing with hammer shall not be permitted. Pipes and fittings shall be cleaned with pipe cleaners and joined by approved make solvent cement. After laying the pipes, before cloasing the pipes, gravity test to be conducted and got the approval from the Engineer-in-charge. chased portions shall be covered with cement morter. Work includes making required size holes in brick walls wherever necessary and re do same with water proofing components to the entire satisfaction of Engineer-in-charge.etc complete. All the stub outs shall be closed with proper end caps till of installation of sanitraywares and accessories etc. complete. |
| 53 | Removal and refixing of toilet cubicle: The work shall include the dismantling of existing toilet cubicle without causing any damage and stacking the same with all accessories like leg, hinges, locking system etc. and refixing the same cubicle with all accessories if any required after completion of all works inside the toilet, all complete as per the direction of Engineer-in-charge. |
| 54 | Engaging labours for undertaking miscellaneous work.(muster roll and reports shall be maintained) as per directions of Engineer-in-charge: |
| 55 | Coolie |
| 56 | Mason Please Enable Macros to View BoQ information |