|
| 1 | Item No.1: Providing and supplying in standard lengths Polyethelene Pipes, confirming to IS 4984 / 14151 / 12786 / 13488 with nesessary jointing material like mechanical connector i. e. thread / insert joint / quick release coupler joint / compression fitting joint or flanged joint excluding coupler/specials, including transportation and freight charges, inspection charges, loading / unloading charges, conveyance to the departmental stores & stacking the same in closed shade duly protecting from sunrays & rains, excluding GST levied by GI & GOM in all respect etc.complete. 90 mm dia PE-100, 6Kg/Sq.cm |
| 2 | Item No 2 : Providing and supplying Air Valves as per IS-14845-2000 and MJP’s standard specifications of approved make and quality of following diameters including railway freight, inspection charges, unloading from railway wagons, loading into truck, transportation upto departmental stores, unloding and stacking excluding GST levied by GOI & GOM in all respect etc.complete .32 mm dia |
| 3 | Item No 3 : Excavation for foundation /pipe trenches in earth soils of all types, sand gravel and soft murum, including removing the excavated material up to a distance of 50 m and lifts as below, stacking and spreading as directed, normal dewatering, preparing etc. Complete. |
| 4 | Item No.4 : Excavation for foundation /pipe trenches in hard murum with boulders including removing the excavated material up to a distance of 50 m and lifts as below, stacking and spreading as directed, normal dewatering, preparing etc. Complete. |
| 5 | Item No.5 :Excavation for foundation /pipe trenches in soft rock & old cement road including removing the excavated material up to a distance of 50 m and lifts as below, stacking and spreading as directed, normal dewatering, preparing etc. Complete. |
| 6 | Item No.6 :- Excavation for foundation /pipe trenches in hard rock and concrete road by chiselling, wedging, line drilling by mechanical means or by all means other than blasting including removing the excavated material up to a distance of 50 m and lifts as below, stacking and spreading as directed, normal dewatering, preparing etc. Complete. |
| 7 | Item No.7 :The filling plinth and murum beading in trenches with approed murum from excavated materials from foundation 15 cm to 20 cm layers including watering etc comp. |
| 8 | Item No.8 : Lowering, Laying and Jointing H.D.P.E./M. D. P. E. pipes in proper position including all specials by compression fitting/electrofusion and butt fusion jointing procedure as per relevent IS Code complete with all materials for jointing procedure like Electrofusion machine, Electric heater/butt fusion welding machine with hydraulic jack, top loading clamp etc. and all labours as directed by engineer in charge as per IS-7634 Part II 90 mm dia PE-100, 6Kg/Sq.cm |
| 9 | Item No.9 :- Lowering, laying and fixing in proper alignment and position all types of C.I. air valves as directed by Engineer-in-charge including cost of conveyance from stores to site of work, cost of all material and givingsatisfactory hydraulic testing, etc. complete. (for all class of valves). |
| 10 | Item No.10 : Refilling the trenches with available excavated stuff with soft material first over pipeline and then hard material in 15 cm layers including consolidation , surcharging etc. comp |
| 11 | Item No.11 : Scheme Information Name Board etc comp Please Enable Macros to View BoQ information |