|
| 1 | 13 Mtr long 150x150xmm G.I.R.S.Joist Pole |
| 2 | 99 SQ. MM. AAAC XLPE Covered Conductor |
| 3 | P.G Clamp for 100 Sq.mm AAAC Conductor |
| 4 | 11 KV Pin insulator Polymer |
| 5 | H W fitting (B & S) 70 KN (3 bolted) |
| 6 | Disc insulator (B & S) 70 KN Polymer |
| 7 | Earthing of Support (Coil Type) |
| 8 | Top Channel GI 100x50x6 MM (9.56 Kg/mtr each |
| 9 | Fish Plate 50x6mm, 2.36kg/mtr., each |
| 10 | Double Pole Belting Channel 75x40x4.8 mm |
| 11 | 50x50x6 mm GI Bracing Angle, 4.5 Kg/mtr |
| 12 | Danger Plate , 2 Nos. |
| 13 | Back Clamp for danger Plate 25x3mm |
| 14 | HT Stay set Complete |
| 15 | HT stay insulator Type-C |
| 16 | HT Stay Clamp , 50x8 mm flat(3.14kg/mtr) |
| 17 | 7/10 SWG GI stay wire, Grade-2 (15kg./ |
| 18 | GI bared wire anticlimbing device 3 Kg |
| 19 | Back Clamp for anticlimbing device25x3mm |
| 20 | GI Nut, Bolt & washer of different size |
| 21 | Stock storege and Insurance 3% of (A) |
| 22 | Contigency (3% of (A+C)) |
| 23 | Tool & Plant (2% of (A+C)) |
| 24 | Transport (7.5% of (A+C)) |
| 25 | Erection Charges (10% of A1+C1) |
| 26 | Erection Charges (20% of A2+C2) |
| 27 | Erection Charges (5% of A3+C3) |
| 28 | Painting of Pole in Black & Yellow Strip |
| 29 | Fixing of complete 11KV line complete set |
| 30 | Concreting Ratio 1:3:6 (500mm x 500mmx18 |
| 31 | Couping Ratio 1:3:6 with dimension |
| 32 | 75x40x6mm Channel -2x 2,2mtr |
| 33 | Eye Bolts (16mm) |
| 34 | 6 SWG (4.9mm) GI wire for tension |
| 35 | 8 SWG (4.06mm) GI wire for Lacing |
| 36 | GI Nut, Bolt & washer of different size |
| 37 | Stock storege and Insurance 3% of (A) |
| 38 | Contigency (3% of (A+C)) |
| 39 | Tool & Plant (2% of (A+C)) |
| 40 | Transport (7.5% of (A+C)) |
| 41 | Erection Charges (10% of A1+C1) |
| 42 | Erection Charges (20% of A2+C2) |
| 43 | Erection Charges (5% of A3+C3) |
| 44 | Labour Charge for dismantling + Transportation Charges- Salvage Value |
| 45 | Labour Cess Please Enable Macros to View BoQ information |