|
| 1 | 11 Mtr long 150x150xmm G.I.R.S.Joist Pole |
| 2 | 11 KV V Cross Arm (10.2 K.G. each) |
| 3 | Top Bracket 100x50x6 mm GI channel |
| 4 | 99 SQ. MM. AAAC XLPE Covered Conductor |
| 5 | PG Clamp for 100 sq. mm AAA Conductor |
| 6 | 11 KV Pin insulator Polymer |
| 7 | H W fitting (B & S) 70 KN, 3 Bolts |
| 8 | Disc insulator (B & S) 70 KN, Polymer |
| 9 | Back Clamp GIF/11 KV V Cross Arm |
| 10 | Earthing of Support (Coil Type) |
| 11 | Top Channel 100x50x6mm,9.56 kg/mtr each |
| 12 | Fish Plate 50x6mm., 2.36 Kg/mtr.,each |
| 13 | Double pole Belting Channel 75x40x4.8mm |
| 14 | 50x50x6 mm , GI Bracing Angle, 4.5 Kg/mtr |
| 15 | Danger Plate , 2 Nos. |
| 16 | Back Clamp for danger Plate 25x3mm |
| 17 | H.T Stay Set (Complete) |
| 18 | H.T Stay Insulator Type-C (2 No's) |
| 19 | H.T Stay Clamp, 50x8 mm, flat, 3.14 Kg/M |
| 20 | 7/10 SWG Stay Wire 15 Kg/Stay |
| 21 | GI bared wire anticlimbing device 3 Kg |
| 22 | Back Clamp for anticlimbing device25x3mm |
| 23 | GI Nut, Bolt & washer of different size |
| 24 | 75x40x6 mm Channel-2 x2,2 mtr |
| 25 | Eye Bolts(16mm) |
| 26 | 6 SWG(4.9mm) GI wire for tension |
| 27 | 8 SWG(4.06mm) GI wire for Lacing |
| 28 | Stock storege and Insurance 3% of (A) |
| 29 | Contigency (3% of (A+C)) |
| 30 | Tool & Plant (2% of (A+C)) |
| 31 | Transport (7.5% of (A+C)) |
| 32 | Erection Charges (10% of A1+C1) |
| 33 | Erection Charges (20% of A2+C2) |
| 34 | Erection Charges (5% of A3+C3) |
| 35 | Painting of Pole in Black & Yellow Strip |
| 36 | Fixing of Complete 33KV line Complete set |
| 37 | Concreting Ratio 1:3:6 (500mm x 500mmx22 |
| 38 | Couping Ratio 1:3:6 with dimension |
| 39 | Labour Charge for dismantling + Transportation Charges- Salvage Value |
| 40 | Labour Cess Please Enable Macros to View BoQ information |