| 1 | Part-A |
| 2 | Estimate for Shifting and Erection of 33 KV,11 KV & LT Line due to Widening of Road by R &B Division ,Nabarangpur for improvement of Umerkote Chandahandi Malgaon Road from 4/475 Km to 39/500 Km . |
| 3 | SCOPE OF THE WORK-Estimate for shifting and Erection in Road Widening Work by R & B Division ,Nabarangpur. 1.05 Nos of 11 Mtr Long WPB GI Poles for Road Crossing Guarding on 11 KV Line with 55 Sqmm AAAC =0.28 C Km , 13 Nos of 9 Mtr Long PSC Poles & 11 KV Line using 1x100 Sqmm XLPE insulated Covered Conductor with the proposed pole & 01 nos of intermediate pole at point A=0.08 C Km(From A-E) while passing the line undeneath of existing 33 KV Line . 2. Dismentaling of existing HT Pole. |
| 4 | Supply and fixing of 11 Mtr long WPB GI Pole of 160 x152 mm with Welded Base Plate (300X300X12). |
| 5 | Supply and fixing of 09 Mtr long 300 kg PSC pole(including transportation cost upto store) |
| 6 | Supply and fixing of RCC Base Plate |
| 7 | Supply and fixing of 11 KV V Cross Arm( 10.2 Kg each) |
| 8 | Supply and fixing of Back Clamp for 11 KV \\"V \\"Cross Arm( 13 nos of Pin Point Poles |
| 9 | Supply and fixing of 11 KV F-clamp 2.9 Kg each |
| 10 | Supply and fixing of 11 KV Pin Insulator polymer |
| 11 | Supply and fixing of Disc Insulator (B&S) 70 KN Polymer. |
| 12 | Supply and fixing of HW fitting (B&S) 70 KN (3 bolted). |
| 13 | Supply and fixing of Earthing device / Support Coil type (GI) |
| 14 | Supply and fixing of No-8 GI wire (Dia 4.6mm) 0.131 KG/ Mtr.-2 Mtr.For connecting pole with Coil earthing |
| 15 | Supply and fixing of GI Nuts &Bolts of Assorted size |
| 16 | Supply and fixing of 55 mm2 All Alloy Aluminium Conductor AAAC. |
| 17 | Supply and fixing of PG Clamp for 55 sq mm All Alloy Aluminium Conductor AAAC. |
| 18 | Supply and fixing of 100x50x6 mm channel for straight Cross arm 1.2 mtr Long for bottom Channel & 0.206 Mtr Long for Top Channel. |
| 19 | Supply and fixing of 100 mm2 All Alloy Aluminium Conductor.AAAC |
| 20 | Supply and fixing of 11 KV 1 Core ,100 mm2 XLPE insulated AAAC Conductor (unarmoured). |
| 21 | Supply and fixing of Ties for 11 KV covered conductor. |
| 22 | Supply and fixing of IPC for covered conductor 100 Sq mm. |
| 23 | Supply and fixing of Jt kit Term for 11 KV 100 Sqmm AAA Covered Conductor. |
| 24 | Supply and fixing of PG Clamp for 100 Sq mm AAAC. |
| 25 | Supply and fixing of 75 x 40 x6 mm MS channel of 1.5 mtr long 4 Nos for providing support for guarding at road crossing @ 6.8 kg/mtr. |
| 26 | Supply and fixing of No-6 G.I. wire (Dia 4.8 mm ),40 kg for 1 No guarding. |
| 27 | Supply and fixing of Eye hook. |
| 28 | Supply and fixing of 8 SWG GI wire for cross lacing & Earthing for guarding channel. |
| 29 | Supply and fixing of 40 mm nominal bore G.I. pipe (medium guage) earthing device with 3 mtr long. |
| 30 | Supply and fixing of 25 X 6 mm GI flat for Earthing. |
| 31 | Supply and fixing of HT Stay Set Complete. |
| 32 | Supply and fixing of 11 KV Stay insulator. |
| 33 | Supply and fixing of Stay Clamp. |
| 34 | Supply and fixing of 7/10 SWG G.I. Stay wire. |
| 35 | Supply and fixing of Danger Board |
| 36 | Supply and fixing of Back Clamp for danger Plate 25X3 mm GI Earth Flat , 0.51 Mtr for Each Back Clamp. |
| 37 | Supply and fixing of ANTICLIMBING DEVICE / Barbed wire (3 KG per supprot ) |
| 38 | Supply and fixing of Back Clamp for ACD(25 X3 mm GI Earth Flat,0.59Kg/Mtr &0.51 Mtr for each Back Clamp. |
| 39 | Supply and fixing of Fish Plate for DP (50x8mm of Flat ,0.97Kg/Mtr & 0.28Mtr Long for Each ) |
| 40 | Supply and fixing of Black Paint. |
| 41 | Supply and fixing of Yellow Paint. |
| 42 | Saundries(paint,binding tape ,etc) |
| 43 | CIVIL ITEMS |
| 44 | Concreting ratio 1:1.5:3 (500mmX500mmX1500mm)=0.375Cu.mtr @ 6400/- for PSC Pole. |
| 45 | Couping ratio 1:1.5:3 with dimension ( 500X500X450)=0.1125 Cu mtr @ 6400/-for PSC Pole. |
| 46 | Concreting ratio 1:1.5:3 (500mmX500mmX1800mm)=0.45 Cu.mtr. |
| 47 | Cement Concreting for stay anchor plate with C.C 1:2:4,0.2 Cum. |
| 48 | Material for earthing including masonary work for earth pit ,salt,charcoal and RCC Cover. |
| 49 | Dismantling charges of existing HT lines |
| 50 | Dismantling charges of existing HT Poles. |
| 51 | Survey of incremental/delta network and assets changes of LT network and updation in GESW database. |
| 52 | Part-B |
| 53 | SCOPE OF THE WORK-Estimate for shifting and Erection in Road Widening Work by R & B Division ,Nabarangpur. 1.05 Nos of 9 Mtr Long Joist Pole and 06 nos of 9 Mtr Long PSC Pole with 3X95+1X70+1X16 Sq mm LT AB Cable =0.21 Km & 3 X35+1X25 +1X16Sqmm =0.105 Km (At point 1,2,3 & 8). 2.08 nos of 9 Mtr Long PSC Pole for shifting of Pole only. 3. Dismentaling of existing LT line of 08 nos span & 18 nos of Pole. |
| 54 | Supply and fixing of 9 mtr long 300 kg PSC pole (including Transportation cost) |
| 55 | Supply and fixing of 116 X100 mm RS joist (09 Mtr long) 23.0 Kg/Mtr (Each 207 Kg). |
| 56 | Supply and fixing of RCC Plate for support |
| 57 | Supply and fixing of RCC Base Plate |
| 58 | Supply and fixing of Earthing Device Coil Type(GI) |
| 59 | Supply and fixing of No-8 GI wire (Dia 4.6mm) 0.131 KG/ Mtr.- 2 Mtr. For connecting pole with Coil earthing |
| 60 | Supply and fixing of Pole Clamp for EYE hook (for XLPE Aerial bunched Cable) |
| 61 | Supply and fixing of Dead end clamp |
| 62 | Supply and fixing of Eye hook (for XLPE Aerial bunched Cable) for Dead End Clamp. |
| 63 | Supply and fixing of Suspension clamp with eye hook for ABC |
| 64 | Supply and fixing of LT Stay Set Complete |
| 65 | Supply and fixing of L.T stay insulator |
| 66 | Supply and fixing of L.T stay clamp |
| 67 | Supply and fixing of 7/12 G.I. stay wire |
| 68 | Supply and fixing of GI Bolt Nut& washer |
| 69 | Supply and fixing of 3x50+1x35+1X16 mm2 LT XLPE Aerial bunched Cable |
| 70 | Supply and fixing of 3x35+1X25+1x16 mm2 LT XLPE Aerial bunched Cable |
| 71 | Supply and fixing of Danger Board |
| 72 | Supply and fixing of Back Clamp for danger Board. |
| 73 | Supply and fixing of ANTICLIMBING DEVICE / Barbed wire (3 KG per supprot ) |
| 74 | Supply and fixing of Back clamp for ACD. |
| 75 | Supply and fixing of Black Paint. |
| 76 | Supply and fixing of Yellow Paint. |
| 77 | Sundries & minor materials |
| 78 | CIVIL ITEMS |
| 79 | Concrete material for stay anchor plate (0.45x0.45x1.5)mtr |
| 80 | Concreting ratio 1:1.5:3 (500mmX500mmX1500mm) = 0.375Cu.mtr @ 6400/- for PSC Pole. |
| 81 | Couping ratio 1:1.5:3 with dimension ( 500X500X450)= 0.1125 Cu mtr @ 6400/- for PSC Pole. |
| 82 | Dismantling of LT Line poles |
| 83 | Dismantling of AB Cable. |
| 84 | SCOPE OF THE WORK-Estimate for shifting and Erection of 33 KV Line in Road Widening Work by R & B Division ,Nabarangpur. 1. 02 Nos of 13 Mtr Long WPB Pole for Road Crossing Guarding on 33 KV Line with 100 Sqmm AAA =0.19 C Km . 2. Dismentaling of existing HT Pole. |
| 85 | Supply and fixing of 13 Mtr long pole of 162 x150 mm with Welded Base Plate. |
| 86 | Supply and fixing of 33 KV Pin Insulator Polymer. |
| 87 | Supply and fixing of Disc insulator (B & S) 90 KN Polymer. |
| 88 | Supply and fixing of HW fitting (B & S) 90 KN ,4 Bolt. |
| 89 | Supply and fixing of 100 mm2 AAA Conductor. |
| 90 | Supply and fixing of PG Clamp for 100 mm2 AAA Conductor. |
| 91 | Supply and fixing of HT Stay Complete. |
| 92 | Supply and fixing of HT Stay insulator. |
| 93 | Supply and fixing of HT Stay clamp (1.9 kg /Pair). |
| 94 | Supply and fixing of 7/8 SWG G.I. Stay wire. |
| 95 | Supply and fixing of Earthing device /Support Coil type(GI). |
| 96 | Supply and fixing of No-8 GI Wire (Dia 4.6 mm) 0.131 KG/Mtr -2 Mtr for connecting pole with Coil earthing. |
| 97 | Supply and fixing of GI Nuts & Bolts of Assorted size. |
| 98 | Supply and fixing of 100 x50 x6 mm channel for straight Cross arm 1.8 mtr Long for Bottom Channel & 0.306 Mtr Long for Top Channel. |
| 99 | Supply and fixing of 75 x 40 x6 mm MS channel of 2.2 mtr long 4 Nos for providing support for guarding at road crossing @ 6.8 kg/mtr. |
| 100 | Supply and fixing of No-6 G.I. wire (Dia 4.8 mm ),40 kg for 1 No guarding. |
| 101 | Supply and fixing of Eye hook. |
| 102 | Supply and fixing of 8 SWG GI wire for cross lacing & Earthing for guarding channel. |
| 103 | Supply and fixing of 40 mm nominal bore G.I. pipe (medium guage) earthing device with 3 mtr long. |
| 104 | Supply and fixing of 25 X 6 mm GI flat for Earthing. |
| 105 | Supply and fixing of Danger Board |
| 106 | Supply and fixing of Back Clamp for danger Plate 25X3 mm GI Earth Flat ,0.59 Kg/Mtr & 0.51 Mtr for Each Back Clamp. |
| 107 | Supply and fixing of ANTICLIMBING DEVICE / Barbed wire (3 KG per supprot ) |
| 108 | Supply and fixing of Back Clamp for ACD(25 X3 mm GI Earth Flat,0.59Kg/Mtr &0.51 Mtr for each Back Clamp. |
| 109 | Supply and fixing of Fish Plate for DP (50x8mm of Flat ,0.97Kg/Mtr & 0.28Mtr Long for Each ) |
| 110 | Supply and fixing of Black Paint. |
| 111 | Supply and fixing of Yellow Paint. |
| 112 | Saundries(paint,binding tape ,etc) |
| 113 | CIVIL ITEMS |
| 114 | Concreting ratio 1:1.5:3 (500mmX500mmX1500mm)=0.55 Cu mtr. |
| 115 | Couping ratio 1:1.5:3 with dimension ( 500X500X450)=0.1125 Cu mtr |
| 116 | Cement Concreting for stay anchor plate with C.C. 1:2:4,0.2 Cum |
| 117 | Material for earthing including masonary work for earth pit,salt,charcoal and RCC Cover. |
| 118 | Survey of incremental/delta network and assets changes of 33 network and updation in GESW database. |
| 119 | Dismantling charges of existing HT poles |
| 120 | Dismantling charges of existing AAAC. |
| 121 | AIO LED Solar Street Lights for illumination |
| 122 | Supply of 8 mtr long hot dip galvanized Octagonal pole having base dia of 155 mm and top dia of 70 mm and plate thick ness of 4 mm or more. complete with base plate and 4 nos. Jtype En 8 grade foundation bolts to withstand 180 KM / HR or more wind speed considering the weight & dimension of 1 nos 60 W AIO Solar light to be fitted in the pole at two diffrent heights ( One light on Pole Top and second light on the differential bracket)(Make - Bajaj/Utkarsh/Valmount /RR Ispat/Equivalent) |
| 123 | Supply of Elegant look 60 W (+/-10%) AIO LED Solar Street lights having extruded alluminium housing, 180Wp or more Mono Crystalline Panel/Laminates fixed on the top of the luminaire housing, maintenance free 12.8 volts 78 Ah or more LiFePO4 battery(BIS certified) , BMS, MPPT charge controller, PIR sensor to provide 2 days (24 hrs ) back up . The luminaire is having IP 65 protection for critical components, IK 07 and having lumen output of > 10000 lumen and having minimum lumen efficacy >160 lm/w) as per LM 79 report third party NABL lab to justify the lumen output & lumen efficacy . Lenses should be provided on the LED chip for better lighting dstribution to avoid glare on human eyes. Both the luminaire and Mono Crystalline Panel must be manufactured in India. |
| 124 | The Solar lighting company must submit the third party NABL lab reports to justify the luen efficacy,luminaire output , IK 08 and IP 65 protection . The Luminaire should be supplied along with adjustable type mounting bracket which can be fitted directly on the pole. The Solar Street light and solar panel having capacity of 180 Wp or more must be designed to take the wind load at 180 KM/HR wind speed (As per wind load test report ) .The Solar lighting manufacturer must submit the declaration letter by mentioning that complete solar light and the solar panel are manufactured in India and warranty certificate on their company's letterhead by mentioning warranty period as 5 years and necessary aftersales service will be provided through their tollfree base service network located within 100 KM from the project site. |
| 125 | The Solar Street light manufacturer should have own NABL accredieted laborotory. |
| 126 | Construction of RCC foundation by using M20grade RCC and Fe415 grade reinforcement in the foundation by considering the SBC as 10T per sq mtr and fixing 4 nos .EN8 grade foundation bolts in that foundation for installation of pole with solar lighten that foundation. The work shall be executed as per the instruction of EIC. Please Enable Macros to View BoQ information |