| 1 | drawings on completion of work the DPR (excluding structural design) shall be prepared according to \\"Terms & Conditions\\", Activity Sheet No-1\\" , List-1\\" , List 2 and List-3\\" given in Annexure-14 as amended from time to time appended with SOR. In addition to civil drawings, the architectural work shall include preparation of MEP drawings of Heating Ventilation and Air Conditioning (HVAC), Mechanical system (elevators/escalators etc), acoustics, sanitary, plumbing drainage, water supply, rain water harvesting, sewage, STP, ETP electrical, electronic, communication system, interior design, graphics signage, fire detection, fire protection, security systems, arboriculture, parking and landscaping based on the concept plan supplied by the department. All drawings shall be prepared according to soil condition, topographical condition surface & subsoil water levels at site, relevant codes/manuals, bylaws, green building and GRIHA norms. The work shall also include preparation of model of the building made of acrylic fiber sheet, on a suitable scale, mounted on a portable base and 3D views on flex on plain sheet as directed by the Engineer in charge. It will be the responsibility of the architect to collect the sub soil reports (Bearing Capacity for soil) from the department, if available. However, if bearing capacity of soil is not available with the department, then it will be responsibility of the architect to engage a geotechnical engineer empanelled with the Chief Architect and get the investigation done and collect the re4port for which payment shall be made separately according to geotechnical testing items in SOR. The work shall also include revision of the drawings, obtaining staturary approvals, obtaining utilities shifting estimates from owners of the utilities at site and other approvals such as GRIHA rating. (PWD SOR VOL-2 29.8/390) Please Enable Macros to View BoQ information |