| 1 | Safely carriage of STP 13 mtr long steel pole from PVVNL, Store/ other place/ dump store to site including loading & unloading at both ends. |
| 2 | Safely carriage of STP 11 mtr long steel pole from PVVNL, Store/ other place/ dump store to site including loading & unloading at both ends. |
| 3 | Safely carriage upto of PCC Pole 11 mtr from PVVNL, Store/ other place/ dump store/33KV S/S Place to site including loading & unloading at both ends. |
| 4 | Safely carriage upto of PCC Pole 9 mtr from PVVNL, Store/ other place/ dump store/33KV S/S Place to site including loading & unloading at both ends. |
| 5 | Safely carriage upto of PCC Pole 8.5 mtr from PVVNL, Store/ other place/ dump store/33KV S/S Place to site including loading & unloading at both ends. |
| 6 | Safely carriage of line material from PVVNL, Store/other Place/ dump store/ 33 KV S/S place to site including loading & unloading at both ends. |
| 7 | Carriage of 400 KVA T/F From PVVNL, Store/other place/dump store/33 KV S/S Place to site including loading and unloading at both ends. |
| 8 | Carriage of 250 KVA T/F From PVVNL, Store/other place/dump store/33 KV S/S Place to site including loading and unloading at both ends. |
| 9 | Safely carriage of 100 KVA T/F from PVVNL, Store/ other Place/ dump store/ 33KV S/S Place to site including loading & unloading at both ends. |
| 10 | Safely carriage of 63 KVA T/F from PVVNL, Store/ other Place/ dump store/ 33KV S/S Place to site including loading & unloading at both ends. |
| 11 | Safely carriage of 25 KVA T/F from PVVNL, Store/ other Place/ dump store/ 33KV S/S Place to site including loading & unloading at both ends. |
| 12 | Safely carriage of 10 KVA T/F from PVVNL, Store/ other Place/ dump store/ 33KV S/S Place to site including loading & unloading at both ends. |
| 13 | Carriage of old & used 400 KVA T/F From site to PVVNL Store including loading & unloading at both ends. |
| 14 | Carriage of old & used 250 KVA T/F From site to PVVNL Store including loading & unloading at both ends. |
| 15 | Safely carriage of old & used 100 KVA T/F from site to PVVNL Store including loading & unloading at both ends. |
| 16 | Safely carriage of old & used 63 KVA T/F from site to PVVNL Store including loading & unloading at both ends. |
| 17 | Safely carriage of old & used 25 KVA T/F from site to PVVNL Store including loading & unloading at both ends. |
| 18 | Safely carriage of old & used 10 KVA T/F from site to PVVNL Store including loading & unloading at both ends. |
| 19 | Safely Carriage of metering cubical from PVVNL, Store/ other place/ dump store to site including loading & unloading at both ends. |
| 20 | Safely Carriage of CT/PT unit from PVVNL, Store/ other place/ dump store to site including loading & unloading at both ends. |
| 21 | Safely Carriage of old & used metering cubical from site to PVVNL Store including loading & unloading at both ends. |
| 22 | Safely Carriage of old used CT/PT unit from site to PVVNL Store including loading & unloading at both ends. |
| 23 | Safely Carriage of VCB (33 KV/11KV) from PVVNL, Store/ other place/ dump store to site including loading & unloading at both ends. |
| 24 | Safely installation of VCB (33 KV/11KV) with proper alignment and proper connection as per Respo Norms. |
| 25 | Safely Carriage of old VCB (33 KV/11KV) from site to PVVNL, Store/ other place/ dump store including loading & unloading at both ends. |
| 26 | Safely Carriage of 11 Kv XLPE Cable 3x70 sqmm from PVVNL, Store to site of work including loading & unloading at both ends. |
| 27 | Safely Carriage of 11 kv XLPE Cable 3x120 sqmm from PVVNL, Store to site of work including loading & unloading at both ends. |
| 28 | Safely Carriage of 11 Kv XLPE Cable 3x185 sqmm from PVVNL, Store to site of work including loading & unloading at both ends. |
| 29 | Safely Carriage of 11 Kv XLPE Cable 3x300 Sqmm from PVVNL, Store to site of work including loading & unloading at both ends. |
| 30 | Safely carriage of 33 Kv XLPE Cable 3x300 sqmm from PVVNL, Store to site of work including loading & unloading at both ends. |
| 31 | Safely carriage of 33 Kv XLPE Cable 3x400 sqmm from PVVNL, Store to site of work including loading & unloading at both ends. |
| 32 | Erection of STP 13 mtr long steel Tubular pole support with proper alignment & upto depth of one sixth of length of pole alongwith proper fabrication and concreting, grouting with pole muffing as per respo norms. |
| 33 | Erection of STP 11 mtr long steel Tubular pole support with proper alignment & upto depth of one sixth of length of pole alongwith proper fabrication and concreting, grouting with pole muffing as per respo norms. |
| 34 | Providing & laying HDPE pipe 120 mm for 33KV/11KV line open cut methed as per respo norms. |
| 35 | Providing & laying HDPE pipe 140 mm for 33KV/11KV line open cut methed as per respo norms. |
| 36 | Providing & laying HDPE pipe 160 mm for 33KV/11KV line open cut methed as per respo norms. |
| 37 | Providing & laying HDPE pipe 200 mm for 33KV/11KV line open cut methed as per respo norms. |
| 38 | Providing & laying HDPE pipe 120 mm for 33KV/11KV line with HDD Methed as per respo norms. |
| 39 | Providing & laying HDPE pipe 140 mm for 33KV/11KV line with HDD Methed as per respo norms. |
| 40 | Providing & laying HDPE pipe 160 mm for 33KV/11KV line with HDD Methed as per respo norms. |
| 41 | Providing & laying HDPE pipe 200 mm for 33KV/11KV line with HDD Methed as per respo norms. |
| 42 | Erection of pcc pole 8.5 mtr support with proper alignment & upto depth of one sixth of length of pole and concreting, grouting pole muffing alongwith proper fabrication as per respo norms. |
| 43 | Erection of pcc pole 9 mtr support with proper alignment & upto depth of one sixth of length of pole and concreting, grouting pole muffing alongwith proper fabrication as per respo norms. |
| 44 | Erection of pcc pole 11 mtr support with proper alignment & upto depth of one sixth of length of pole and concreting, grouting pole muffing alongwith proper fabrication as per respo norms. |
| 45 | Construction of double pole with 13 mtr ST Pole support with proper alignment & upto depth of one sixth of length of pole and concreting, grouting pole muffing alongwith proper fabrication as per respo norms. |
| 46 | Construction of double pole with 11 mtr ST Pole support with proper alignment & upto depth of one sixth of length of pole and concreting, grouting pole muffing alongwith proper fabrication as per respo norms. |
| 47 | Construction of double pole with 9 mtr. PCC Pole support with proper alignment & upto depth of one sixth of length of pole and concreting, grouting pole muffing alongwith proper fabrication as per respo norms. |
| 48 | Construction of double pole with 11 mtr. PCC Pole support with proper alignment & upto depth of one sixth of length of pole and concreting, grouting pole plinth alongwith proper fabrication as per respo norms. |
| 49 | Construction of double pole with 8.5 mtr PCC Pole support with proper alignment & upto depth of one sixth of length of pole and concreting, grouting pole muffing alongwith proper fabrication as per respo norms. |
| 50 | Fixing of stay rod complete Stringing, nuzzling, binding with Grouting Ratio 1:4:8 cement, send & brick ballast including linting as per respo norms. |
| 51 | Laying stringing and sagging of ACSR Dog conductor including binding and jumpering as per respo norms. |
| 52 | Laying stringing and sagging of ACSR weasel conductor including binding and jumpering as per respo norms. |
| 53 | Laying stringing and sagging of ACSR rabbit conductor including binding and jumpering as per respo norms. |
| 54 | Providing & Fixing of ST Pole/PCC pole holding clamp with Nut & bolts as per respo norms. |
| 55 | Fixing of disc insulator as per respo norms. |
| 56 | Fixing of pin insulator as per respo norms. |
| 57 | Supply and fixing of dead end clamp with J. Hook as per respo norms. |
| 58 | supply and fixing of suspention clamp with J. Hook as per respo norms. |
| 59 | supply and fixing of piercing connector as per respo norms. |
| 60 | Fixing of LT insulator as per respo norms. |
| 61 | Supply and fixing of Alu. crimpling lugs as per respo norms. |
| 62 | Supply and fixing of Alu. Crimpling lugs for LT distribution box as per respo norms. |
| 63 | Supply and fixing of PG clamp for Areal Bunch Conductor as per respo norms. |
| 64 | Construction of plinth 5'x5'x4 for placing upto 400 KVA T/F including cost of brick ballast, Ist class Brick , sand, cement, concrete and labour and plastring of plinth 12 mm thick as per respo norms. |
| 65 | Fixing of Top Channel/ Dropper channel/ substation angle, T-off & angle/ channel arm as per Respo norms. |
| 66 | Fixing of cross arm as per Respo norms. |
| 67 | Earthing of pole with help of M.S. Earthing rod as per respo norms. |
| 68 | Making of section of 11 kv line including proper binding and jumpering as per respo norms. |
| 69 | Mounting and installation of 10 KVA T/F on Pole as per respo norms. |
| 70 | Mounting and installation of 25 KVA T/F on D/Pole as per respo norms. |
| 71 | Mounting and installation of 63 KVA T/F on D/Pole as per respo norms. |
| 72 | Mounting and installation of 100 KVA T/F on D/Pole as per respo norms. |
| 73 | Mounting and installation of 250 KVA T/F on D/Pole as per respo norms. |
| 74 | Installation of 11 KV metering cubical at the meter room including making the chair by M.S. angle with grouting as per respo norms. |
| 75 | Installation of 11 KV CT/PT combined unit on the double pole with complete connection as per respo norms. |
| 76 | Laying of 11 KV XLPE cable 3x70 sqmm. After digging, trench making & redressing of site alongwith provisioning of material as per norms. |
| 77 | Laying of 11 KV XLPE cable 3x120 sqmm. After digging, trench making & redressing of site alongwith provisioning of material as per norms. |
| 78 | Laying of 11 KV XLPE cable 3x185 sq.mm After digging, trench making & redressing of site alongwith provisioning of material as per norms. |
| 79 | Laying of 11 KV XLPE cable 3x300sq.mm After digging, trench making & redressing of site alongwith provisioning of material as per norms. |
| 80 | Laying of 33 KV XLPE cable 3x300sq.mm After digging, trench making & redressing of site alongwith provisioning of material as per norms. |
| 81 | Laying of 33 KV XLPE cable 3x400sq.mm After digging, trench making & redressing of site alongwith provisioning of material as per norms. |
| 82 | Filling of outdoor type 11 KV cable jointing kit complete in all respect as per RESPO norms. |
| 83 | Filling of indoor type 11 KV cable jointing kit complete in all respect as per RESPO norms. |
| 84 | Filling of outdoor type 33 KV cable jointing kit complete in all respect as per RESPO norms. |
| 85 | Filling of indoor type 33 KV cable jointing kit complete in all respect as per RESPO norms. |
| 86 | Laying lifting, stringing and sagging of ABC conductor 3X16+1X35+1x16sqmm as per respo norms. |
| 87 | Laying lifting, stringing and sagging of ABC conductor 3X50+1X35+1x16sqmm as per respo norms. |
| 88 | Laying lifting, stringing and sagging of ABC conductor 3X95+1X50+1X16sqmm as per respo norms. |
| 89 | Laying lifting, stringing and sagging of ABC conductor 3x120+1x95+1X16sqmm as per respo norms. |
| 90 | Fixing of LT Distribution Box at poles along with clamp as per respo norms. |
| 91 | Neutral/Body earthing of T/F/ meter cubical/ct/pt unit boaring & fixing of 60 ft. deep G.I. Pipe of class 'B' 1.5 dia and connected with G.I. strip of size 30x5 mm including providing required charcoel & salt as per Respo norms. |
| 92 | Safely Carriage of 33 kv XLPE cable 3x120sqmm from PVVNL stor to work site including loading unloading both end. |
| 93 | Laying of 33 kv XLPE cable 3x120sqmm after digging trunch making & redressing of site along with provisioning of material as per Respo Norms |
| 94 | filling of outdoor type 33 kv XLPE cable 3x120sqmm jointing kit complete in all respect as per Respo Norms |
| 95 | Providing and Fixing of F Bracket as per Respo Norms |
| 96 | Providing and Fixing of E Bracket as per Respo Norms |
| 97 | Providing and Painting of Alu. Paint as per Respo Norms |
| 98 | Providing and Painting of Red oxide Paint as per Respo Norms |
| 99 | Providing and Fixing of Alu. Binding wire as per Respo Norms |
| 100 | Providing and Fixing of G.I. Barbed wire as per Respo Norms |
| 101 | Providing and Fixing of Danger Board with clamp & Bolt & Nuts as per Respo Norms |
| 102 | Providing and Fixing of Number Plate with clamp & Bolt & Nuts as per Respo Norms |
| 103 | Installation of 33 KV Metering Cubicle as per Respo Norms |
| 104 | Installation of 33 KV CT/PT combind unit as per Respo Norms |
| 105 | fixing of MS channel 100x50mm providing suitable holding clamp with nuts & bolts as per Respo Norms |
| 106 | fixing of MS angle 65x65x6 sqmm providing suitable holding clamp with nuts & bolts as per Respo Norms |
| 107 | fixing of MS angle 75x75x6 sqmm providing suitable holding clamp with nuts & bolts as per Respo Norms |
| 108 | fixing of MS angle 50x50x6 sqmm providing suitable holding clamp with nuts & bolts as per Respo Norms |
| 109 | Laying of LT XLPE cable 3.5x50 sqmm as per Respo Norms |
| 110 | Providing & Fixing of suitable lugs for LT XLPE cable 3.5x50 sqmm as per Respo Norms |
| 111 | Laying of LT XLPE cable 3.5x70 sqmm as per Respo Norms |
| 112 | Providing & Fixing of suitable lugs for LT XLPE cable 3.5x70 sqmm as per Respo Norms |
| 113 | Laying of LT XLPE cable 3.5x150 sqmm as per Respo Norms |
| 114 | Providing & Fixing of suitable lugs for LT XLPE cable 3.5x150 sqmm as per Respo Norms |
| 115 | Laying of LT XLPE cable 3.5x240 sqmm as per Respo Norms |
| 116 | Providing & Fixing of suitable lugs for LT XLPE cable 3.5x240 sqmm as per Respo Norms |
| 117 | Laying of LT XLPE cable 3.5x400 sqmm as per Respo Norms |
| 118 | Providing & Fixing of suitable lugs for LT XLPE cable 3.5x400 sqmm as per Respo Norms |
| 119 | Laying of LT XLPE cable 1x120 sqmm as per Respo Norms |
| 120 | Providing & Fixing of suitable lugs for LT XLPE cable1x120 sqmm as per Respo Norms |
| 121 | Laying of LT XLPE cable 1x240 sqmm as per Respo Norms |
| 122 | Providing & Fixing of suitable lugs for LT XLPE cable1x240 sqmm as per Respo Norms |
| 123 | Laying of LT XLPE cable 1x400 sqmm as per Respo Norms |
| 124 | Providing & Fixing of suitable lugs for LT XLPE cable1x400 sqmm as per Respo Norms |
| 125 | Fixing of 11 kv fuse set as per Respo Norms |
| 126 | Fixing of 11 kv TPMO as per Respo Norms |
| 127 | Providing & Fixing of single core 1Cx16 sqmm lead for LT distribution Box |
| 128 | Providing & Fixing of G.I. Pipe 6\\" Dia as per norms |
| 129 | Fencing of T/F up to 400 KVA as per Respo Norms |
| 130 | Dismantle of HT/LT Line. |
| 131 | Dismantle of PCC pole |
| 132 | Dismantle of ST pole |
| 133 | Carriage of Dismantle line metrial from site to PVVNL Store Please Enable Macros to View BoQ information |