| 1 | Cartridge from store ,loading, unloading and installation of 8.5/9 meter long PCC pole with grouting and all accessories | Cartridge from store ,loading, unloading and installation of 8.5/9 meter long PCC pole with grouting and all accessories |
| 2 | Cartridge from store ,loading, unloading and installation of 11/13 meter long ST pole with grouting and all accessories | Cartridge from store ,loading, unloading and installation of 11/13 meter long ST pole with grouting and all accessories |
| 3 | Safe placement of 8.5/9 meter long PCC pole/11/13 meter long ST pole from dump site to the pit site of work including the work of dragging of the same through Kachha Pakka road. | Safe placement of 8.5/9 meter long PCC pole/11/13 meter long ST pole from dump site to the pit site of work including the work of dragging of the same through Kachha Pakka road. |
| 4 | Earthing of HT support through Earthing rod & and connecting it properly as per RESPO norms. | Earthing of HT support through Earthing rod & and connecting it properly as per RESPO norms. |
| 5 | Construction of plinth/ Muffing of aforesaid newly erected 11/13 meter long ST pole as per RESPO norms in CC 1:2:4 ratio in cement, sand and stone grit duly 12 mm thick plaster in 1:4 ratio of cement and sand to give strengthening | Construction of plinth/ Muffing of aforesaid newly erected 11/13 meter long ST pole as per RESPO norms in CC 1:2:4 ratio in cement, sand and stone grit duly 12 mm thick plaster in 1:4 ratio of cement and sand to give strengthening |
| 6 | Grouting, fixing and nozzling of stay rod, and grouting of stay rod shall be in ratio 1:4:8 [Cement, sand and brick ballast], as per RESPO norm, | Grouting, fixing and nozzling of stay rod, and grouting of stay rod shall be in ratio 1:4:8 [Cement, sand and brick ballast], as per RESPO norm, |
| 7 | Installation of Extra \\"T\\" as per RESPO manual | Installation of Extra \\"T\\" as per RESPO manual |
| 8 | Drilling of hole in channel, angle. | Drilling of hole in channel, angle. |
| 9 | Painting of dropper channel, top channel, T channel and guarding angle with 2 quote of Red Oxide including the cost of paint. | Painting of dropper channel, top channel, T channel and guarding angle with 2 quote of Red Oxide including the cost of paint. |
| 10 | Erection of double pole structure of 8.5/9 meter long PCC pole including fixing of HT fittings as per RESPO norms. | Erection of double pole structure of 8.5/9 meter long PCC pole including fixing of HT fittings as per RESPO norms. |
| 11 | Erection of double pole structure of 11/13 meter long PCC pole including fixing of HT fittings as per RESPO norms. | Erection of double pole structure of 11/13 meter long PCC pole including fixing of HT fittings as per RESPO norms. |
| 12 | Cartridge from store ,loading, unloading and installation and Laying, stringing, sagging, binding and jumpering etc of weasel conductor as per RESPO norms. | Cartridge from store ,loading, unloading and installation and Laying, stringing, sagging, binding and jumpering etc of weasel conductor as per RESPO norms. |
| 13 | Cartridge from store ,loading, unloading and Laying of Ariel bunch conductor cable of size 3x50 sqr. mm/3x95sqr mm | Cartridge from store ,loading, unloading and Laying of Ariel bunch conductor cable of size 3x50 sqr. mm/3x95sqr mm |
| 14 | Cartridge from store ,loading, unloading and Laying, stringing, sagging, binding and jumpering etc of dog conductor as per RESPO norms. | Cartridge from store ,loading, unloading and Laying, stringing, sagging, binding and jumpering etc of dog conductor as per RESPO norms. |
| 15 | Fixing of TPMO/ Fuse set on newly erected transformers. | Fixing of TPMO/ Fuse set on newly erected transformers. |
| 16 | Guarding of 11 KV line. | Guarding of 11 KV line. |
| 17 | Cartridge from store ,loading, unloading and installation of 10/16 KVA transformer | Cartridge from store ,loading, unloading and installation of 10/16 KVA transformer |
| 18 | Cartridge from store ,loading, unloading and installation of 25/63 KVA transformer | Cartridge from store ,loading, unloading and installation of 25/63 KVA transformer |
| 19 | Cartridge from store ,loading, unloading and installation of 250/400 KVA transformer | Cartridge from store ,loading, unloading and installation of 250/400 KVA transformer |
| 20 | Chemical Earthing 250/400 T/F After providing chemical rode | Chemical Earthing 250/400 T/F After providing chemical rode |
| 21 | Construction of Plinth for T/P 250/400 kVA as per RESPO norms, and as per direction is supervising engineer. | Construction of Plinth for T/P 250/400 kVA as per RESPO norms, and as per direction is supervising engineer. |
| 22 | Cartridge from store, loading, unloading and installation of 11 KV Cubical Box 15/5 Amp. | Cartridge from store, loading, unloading and installation of 11 KV Cubical Box 15/5 Amp. |
| 23 | Installation of Distribution box as per RESPO manual and as per direction of supervising engineer. | Installation of Distribution box as per RESPO manual and as per direction of supervising engineer. |
| 24 | Cartage and Digging, laying and back filling 3x70/3x120/3x185/3x300 mm XLPE cable trench as per RESPO manual and as per direction of. supervising engineer, including the cost of arrangement of bricks, sand, labourer, T&P etc. required for proper completion of work. | Cartage and Digging, laying and back filling 3x70/3x120/3x185/3x300 mm XLPE cable trench as per RESPO manual and as per direction of. supervising engineer, including the cost of arrangement of bricks, sand, labourer, T&P etc. required for proper completion of work. |
| 25 | Cartage and Laying of 3x70/3x120/3x185/3x300 sqmm. XLPE cable in open and its making connection with transformer and 11 KV feeders also as per direction of supervising engineer. | Cartage and Laying of 3x70/3x120/3x185/3x300 sqmm. XLPE cable in open and its making connection with transformer and 11 KV feeders also as per direction of supervising engineer. |
| 26 | Filling and fixing of cable box suitable for XLPE cable, including the cost of arrangement of labourer, T&P etc. required for proper completion of work, but the box shall be provided by the corporation free of cost, as per actual sit requirement. | Filling and fixing of cable box suitable for XLPE cable, including the cost of arrangement of labourer, T&P etc. required for proper completion of work, but the box shall be provided by the corporation free of cost, as per actual sit requirement. |
| 27 | Dismantling of 11 KV/LT Line as per site requirement weasel conductors, dog conductors, AB cable | Dismantling of 11 KV/LT Line as per site requirement weasel conductors, dog conductors, AB cable |
| 28 | Dismantling of poles with accessories 8.5 long pcc pole | Dismantling of poles with accessories 8.5 long pcc pole |
| 29 | Dismantling of poles with accessories 9/11 meter ST pole | Dismantling of poles with accessories 9/11 meter ST pole |
| 30 | Installation material Contractor arrange by own his cost Installation of following line material in proper alignment and direction as per RESPO manual, including the cost for arrangement of labourer, T&P etc. required for proper completion of work for the supervising engineer. | Installation material Contractor arrange by own his cost Installation of following line material in proper alignment and direction as per RESPO manual, including the cost for arrangement of labourer, T&P etc. required for proper completion of work for the supervising engineer. |
| 31 | 11 KV-cross arm holding clamp with nut & bolt | 11 KV-cross arm holding clamp with nut & bolt |
| 32 | 11 KV U clamp with nut & bolt | 11 KV U clamp with nut & bolt |
| 33 | 11 KV F clamp with nut & bolt | 11 KV F clamp with nut & bolt |
| 34 | Chopping of tree branches for clearance of line | Chopping of tree branches for clearance of line |