|
| 1 | DE-CENTERALIZE MATERIAL |
| 2 | Universal I Hook |
| 3 | PG CLAMP 95-25 SQ.mm. |
| 4 | STAY CLAMP WITH N&B PCC POLE 8.5MTR |
| 5 | SUSPENSION CLAMP |
| 6 | DEAD END CLAMP FOR AB CABLE |
| 7 | MS CLAMP FOR DEAD END CLAMP WITH N&B |
| 8 | Mid Span Insulator J.sleeve for LT ABC |
| 9 | SHEAR HEAD TYPE PRC 120 TO 25 SQmm |
| 10 | MS Clamp with N&B for Suspension Clamp |
| 11 | Head shrink type end caps for LT ABC |
| 12 | LT XLPE Cable 1x35 sqmm |
| 13 | LT DISTRUBITON BOX 3 PHASE |
| 14 | AL CRIMPING TYPE LUGS 35 SQ.mm |
| 15 | Al. Lug Long Barrel 120 sq. mm. |
| 16 | MS Half Clamp for LT Distribution Box |
| 17 | Labour Charge: |
| 18 | EXCAVATION OF PIT FOR STAY SET |
| 19 | ERECTION OF LT STAY SET |
| 20 | GROUTING OF STAY SET |
| 21 | EXCAVATION OF PIT FOR POLE |
| 22 | ERECTION OF SINGLE PCC POLE |
| 23 | CARTAGE PCC POLE, 0-20 KM |
| 24 | CARTAGE OF PETTY MATERIAL,0-20 KM |
| 25 | HEADLOAD CARTAGE PCC POLE(0-1 KM) |
| 26 | HEADLOAD CARTAGE OF MATERIAL(0-1 KM) |
| 27 | STRAIGHTNING OF TILTED EXISTING LT POLE |
| 28 | DISMANTLING OF AB CABLE |
| 29 | INST & FIX OF AL LUG FOR AB CABLE AT DTR |
| 30 | DISCONNECTION & RECONNECTION OF CONSUMER |
| 31 | FIXING OF HEAT SHRINK CAP FOR AB CABLE |
| 32 | FIXING OF JOINTING SLEEVES FOR AB CABLE |
| 33 | FIXING OF MS CLAMP |
| 34 | INSTALLATION OF LT DISTRIBUTION BOX |
| 35 | FIXING OF DEAD END CLAMP |
| 36 | FIXING OF SUSPENSION CLAMP WITH I HOOK. |
| 37 | LAYING AND FIXING OF 1X35SQMM XLPE CABLE |
| 38 | FIXING OF PIERCING CONNECTOR 120-35 SQMM |
| 39 | FIXING OF PG CLAMP 95-95 SQMM |
| 40 | LAYING/ERECTION & COMM. LT AB 3X120+95SQ |
| 41 | SUPPLY & FIXING OF LT DISTRIBUTION CLAMP |
| 42 | BACK CARRIAGE OF SCRAP MATERIAL |
| 43 | LOOPING AND CHOPPING OF TREE BRANCHES Please Enable Macros to View BoQ information |