|
| 1 | D4 / D5 Exposed and Processed Film for pipe size up to 2-inch dia size | D4 / D5 Exposed and Processed Film for pipe size up to 2-inch dia size |
| 2 | 4\\" Width D2 Exposed and Processed Film below 3.9 MM Thickness (Above 2\\" dia) | 4\\" Width D2 Exposed and Processed Film below 3.9 MM Thickness (Above 2\\" dia) |
| 3 | 4\\" Width D4 Exposed and Processed Film from 3.91 MM to 6.0 MM Thickness (Above 2\\" dia) | 4\\" Width D4 Exposed and Processed Film from 3.91 MM to 6.0 MM Thickness (Above 2\\" dia) |
| 4 | 4\\" Width D5 / D7 Exposed and Processed Film Above 6.0 MM Thickness (Above 2\\" dia) | 4\\" Width D5 / D7 Exposed and Processed Film Above 6.0 MM Thickness (Above 2\\" dia) |
| 5 | Profile Radiography by D5 Exposed and Processed Film | Profile Radiography by D5 Exposed and Processed Film |
| 6 | RT Unit Hire Charges per Unit (12 hrs a shift) | RT Unit Hire Charges per Unit (12 hrs a shift) |
| 7 | Preheating of Carbon Steel / Alloy Steels | Preheating of Carbon Steel / Alloy Steels |
| 8 | Post heating of Carbon Steel / Alloy Steels | Post heating of Carbon Steel / Alloy Steels |
| 9 | Post Weld Heat Treatment (PWHT) of Carbon Steel / Alloy Steels | Post Weld Heat Treatment (PWHT) of Carbon Steel / Alloy Steels |
| 10 | PWHT Unit Hire Charges per Unit (12 hrs a shift) | PWHT Unit Hire Charges per Unit (12 hrs a shift) |
| 11 | Mobilization and Demobilization for Radiography / Heat treatment machines and Crew | Mobilization and Demobilization for Radiography / Heat treatment machines and Crew |
| 12 | D4 / D5 Exposed and Processed Film for pipe size up to 2-inch dia size | D4 / D5 Exposed and Processed Film for pipe size up to 2-inch dia size |
| 13 | 4\\" Width D2 Exposed and Processed Film below 3.9 MM Thickness (Above 2\\" dia) | 4\\" Width D2 Exposed and Processed Film below 3.9 MM Thickness (Above 2\\" dia) |
| 14 | 4\\" Width D4 Exposed and Processed Film from 3.91 MM to 6.0 MM Thickness (Above 2\\" dia) | 4\\" Width D4 Exposed and Processed Film from 3.91 MM to 6.0 MM Thickness (Above 2\\" dia) |
| 15 | 4\\" Width D5 / D7 Exposed and Processed Film Above 6.0 MM Thickness (Above 2\\" dia) | 4\\" Width D5 / D7 Exposed and Processed Film Above 6.0 MM Thickness (Above 2\\" dia) |
| 16 | Profile Radiography by D5 Exposed and Processed Film | Profile Radiography by D5 Exposed and Processed Film |
| 17 | RT Unit Hire Charges per Unit (12 hrs a shift) | RT Unit Hire Charges per Unit (12 hrs a shift) |
| 18 | Preheating of Carbon Steel / Alloy Steels | Preheating of Carbon Steel / Alloy Steels |
| 19 | Post heating of Carbon Steel / Alloy Steels | Post heating of Carbon Steel / Alloy Steels |
| 20 | Post Weld Heat Treatment (PWHT) of Carbon Steel / Alloy Steels | Post Weld Heat Treatment (PWHT) of Carbon Steel / Alloy Steels |
| 21 | PWHT Unit Hire Charges per Unit (12 hrs a shift) | PWHT Unit Hire Charges per Unit (12 hrs a shift) |
| 22 | Mobilization and Demobilization for Radiography / Heat treatment machines and Crew | Mobilization and Demobilization for Radiography / Heat treatment machines and Crew |