|
| 1 | Preparing existing black top surfaces by brushing with wire brushes for removing caked mud etc., sweeping with brooms and finally fanning the cleaned surface with gunny bags to remove all loose dirt etc. complete all as specified and as directed. |
| 2 | M & L for Applying evenly a priming/tack coat with bituminous primer at the rate of 5 kg per 10 sqm of surface complete all as specified and as directed. |
| 3 | M & L for Semi dense asphaltic concrete 30mm consolidated thickness with 5.5% binder content by weight of total mix, rolled and compacted to required camber and gradient complete all as specified and as directed.Note :- (i) Semi dense bituminous concrete shall be laid using self propelled hydrostatic paver finisher and preparation of mix shall be using hot mix plant and transporting the mix in tipper.(ii) The exact bitumen content required shall be determined following the Marshall Mix Design procedure contained in the Asphalt Institute Manual MS-2 (Sixth Edition) as referred in case 3.5.3 of IRC 111: 2009. The adjustment in rate due to variation in quantity of bitumen if any shall be priced at the rate of ₹75.30 per kg. |
| 4 | M & L for bituminous macadam not exceeding 75 mm thickness (compacted thickness) using hot mix plant and mechanical paver with 4% binder (paving grade bitumen VG-30 grade) content by weight of total mix, rolled and compacted with power roller 8 to 10 tonnes to required camber and gradient complete all as specified and as directed.Note :- (i) Bituminous macadam shall be laid using self propelled hydrostatic paver finisher and preparation of mix shall be using hot mix plant and transporting the mix in tipper.(ii) The exact bitumen content required shall be determined as per IRC 27: 2009. The adjustment in rate due to variation in quantity of bitumen if any shall be priced at the rate of ₹46.49 per kg. |
| 5 | Preparing Scarifed road surfaces by brushing with wire brushes for removing caked mud etc., sweeping with brooms and finally fanning the cleaned surface with gunny bags to remove all loose dirt etc. complete all as specified and as directed. |
| 6 | M & L for Applying evenly a priming/tack coat with bituminous primer at the rate of 10 kg per 10 sqm of surface complete all as specified and as directed. |
| 7 | Scarifying or picking gravelled, macadam or bituminous macadam surfaces in area n exc 400 sqm and n exc 50mm deep complete all as specified and as directed. |
| 8 | Scarifying or picking gravelled, macadam or bituminous macadam surfaces in area exc 400 sqm and n exc 50mm deep complete all as specified and as directed. |
| 9 | M & L for preparing bituminous surfaces of road and marking 2.5mm thick centre lines, stop lines, dashes, arrows etc. and the like n. exc 10cm wide on roads pavements with hot applied thermo plastic road marking paint of approved colour confirming to BS 3262-1989 with special applicator machine all as per manufacturers instruction including cost of material, labour, T & P, cleaning the road surface of all dirt, seals, oil, grease and foreign material etc. complete all as specified and as directed. |
| 10 | Supply and fixing, in repairs, Cat eye solar reflective type of metal body alloy of size 100mm x 100mm x 20mm with PAMA striplens reflector of model No. DA 972.0 fixed with and incl MS stud of suitable size as per manufactures instructions complete all as specified and as directed. |
| 11 | Supply and fixing, in repairs, Solar cat eye aluminum alloy shall (100% water proofing design according to 65) of size 125mm x 125mm x 25mm (shank 65mm) of high efficiency Mono rystafie solar panel 2.4V/ 0.3 watt one NI-ed rechargeable battery (1.2V/ 1600MA) consisting of super bright LED with 10,000 to 18,000 mcd completed as per manufactures instructions etc. complete all as specified and as directed. |
| 12 | Repair to potholes any depth, not exc 1 sq m each including sweeping free from dust and mud, or water, scoring sunken surfaces in roads, paths, etc. cutting around edges to at least 25 mm in depth, making good by filling in screened & graded road metal, watering and well ramming (including supply of road metal) complete all as specified and as directed. Please Enable Macros to View BoQ information |