| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil anddisposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil. |
| 2 | Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared. |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) |
| 5 | Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns, etc. for mass concrete |
| 6 | Providing and fixing aluminium extruded section body tubular type universal hydraulic door closer (having brand logo with ISi, IS : 3564, embossed on the body, door weight upto 36 kg to 80 kg and door widthrom 701 mm to 1000 mm), with double speed adjustment with necessaryaccessories and screws etc. complete. |
| 7 | Providing and fixing aluminium sliding door bolts, ISI marked anodised (anodic coating not less than grade AC 10 as per IS : 1868), transparent or dyed to required colour or shade, with nuts and screws etc. complete : 300x16 mm |
| 8 | Providing and fixing aluminium tower bolts, ISI marked, anodised (anodic coating not less than grade AC 10 as per IS : 1868 ) transparent or dyed to required colour or shade, with necessary screws etc. complete : 150x10 mm |
| 9 | Providing and fixing aluminium handles, ISI marked, anodised (anodic coating not less than grade AC 10 as per IS : 1868) transparent or dyed to required colour or shade, with necessary screws etc. complete : 100 mm |
| 10 | Providing and fixing aluminium hanging floor door stopper, ISI marked,anodised (anodic coating not less than grade AC 10 as per IS : 1868)transparent or dyed to required colour and shade, with necessary screwsetc. complete.Twin rubber stopper |
| 11 | Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete.Hot finished welded type tubes |
| 12 | Providing and fixing on wall face unplasticised - PVC moulded fittings/ accessories for unplasticised Rigid PVC rain water pipes conforming to IS : 13592 Type A, including jointing with seal ring conforming to IS : 5382, leaving 10 mm gap for thermal expansion.Shoe (Plain).110 mm Shoe |
| 13 | Providing and fixing unplasticised -PVC pipe clips of approved design to unplasticised - PVC rain water pipes by means of 50x50x50 mm hard wood plugs, screwed with M.S. screws of required length, including cutting brick work and fixing in cement mortar 1:4 (1 cement : 4 coarse sand) and making good the wall etc. complete. 110 mm |
| 14 | Providing and fixing 0.50mm TCT , high strength (550 Mpa yield stress minimum) anti-corrosive steel sheets AZ-150 with resin coat on both surfaces to 150 grams sq.grams mass of coating(total both sides) .The sheets will have length upto 12 metre or as desired by Engineerin-charge. The sheet shall be fixed using self drilling /self tapping screws of size (5.5x 55 mm) with EPDM seal, complete upto any pitch in horizontal/ vertical or curved surfaces, excluding the cost of purlins, rafters and trusses and including cutting to size and shape wherever required. |
| 15 | 12 mm cement plaster of mix :1:6 (1 cement: 6 fine sand) |
| 16 | Distempering with oil bound washable distemper of make '' Asian UNO''to give an even shade :New work (two or more coats) over and including water thinnable priming coat with cement primer of make ''Asian paint Smart Care ''. |
| 17 | Painting with synthetic enamel paint of Asiam make Apcolite to give an even shade : Two or more coats on new work |
| 18 | Finishing walls with Acrylic Smooth exterior paint of required shade :Old work (One or more coat applied @ 0.90 ltr/10 sqm). |
| 19 | Taking out doors, windows and clerestory window shutters (steel or wood) including stacking within 50 metres lead :Of area 3 sq. metres and below |
| 20 | Disposal of building rubbish / malba / similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved dumping ground or as approved by Engineer-in-charge for all leads including all lifts involved |
| 21 | Making chases up to 7.5x7.5 cm in walls including making good andfinishing with matching surface after housing G.I. pipe etc. |
| 22 | Providing and fixing aluminium work for doors, windows, ventilatorsand partitions with extruded built up standard tubular sections/appropriate Z sections and other sections of approved makeconforming to IS: 733 and IS: 1285, fixing with dash fasteners ofrequired dia and size, including necessary filling up the gaps atjunctions, i.e. at top, bottom and sides with required EPDM rubber/neoprene gasket etc. Aluminium sections shall be smooth, rust free,straight, mitred and jointed mechanically wherever required includingcleat angle, Aluminium snap beading for glazing / paneling, C.P. brass / stainless steel screws, all complete as per architecturaldrawings and the directions of Engineer-in-charge. (Glazing, panelingand dash fasteners to be paid for separately) :Powder coated aluminium (minimumthickness of powder coating 50 micron For shutters of doors, windows & ventilators including providing and fixing hinges/ pivots and making provision for fixing of fittings wherever required including the cost of EPDM rubber / neoprene gasket required (Fittings shall be paid for separately) |
| 23 | Providing and fixing glazing in aluminium door, window, ventilatorshutters and partitions etc. with EPDM rubber / neoprene gasketetc. complete as per the architectural drawings and the directions ofengineer-in-charge . (Cost of aluminium snap beading shall be paidin basic item): With float glass panes of 5 mm thickness (weight notless than 12.50 kg/sqm) |
| 24 | Providing and fixing on wall face unplasticised - Rigid PVC rain water pipes conforming to IS : 13592 Type A including jointing with seal ring conforming to IS : 5382 leaving 10 mm gap for thermal expansion. (i) Single socketed pipes. 150 mm diameter |
| 25 | Providing and fixing on wall face unplasticised - PVC moulded fittings/ accessories for unplasticised Rigid PVC rain water pipes conforming to IS : 13592 Type A including jointing with seal ring conforming to IS : 5382 leaving 10 mm gap for thermal expansion. Shoe (plain), 150 mm shoe |
| 26 | Providing & fixing 100 mm length & 12 mm dia M,S, anhor bolt with nut and washer to M.S. plate including all necessary fittings as required as per directed by the EIC. |
| 27 | Providing and fixing unplasticised -PVC pipe clips of approved design to unplasticised - PVC rain water pipes by means of 50x50x50mm hard wood plugs, screwed with M.S. screws of required length including cutting brick work and fixing in cement mortar 1:4 (1 cement : 4 coarse sand) and making good the wall etc. complete.150 mm |
| 28 | Providing and fixing on wall face unplasticised - PVC moulded fittings/ accessories for unplasticised Rigid PVC rain water pipes conforming to IS : 13592 Type A including jointing with seal ring conforming to IS : 5382 leaving 10 mm gap for thermal expansion. Bend 87.5 degree. 150mm plain bend |
| 29 | Supplying and filling in plinth with local sand under floors including, watering, ramming consolidating and dressing complete. |
| 30 | Providing and fixing 8 mm thick plain multipurpose cement board fixed in aluminium doors, windows shutters and partition frames with C.P. brass / stainless steel screws etc. complete as per architectural drawings and directions of engineer-in-charge. |
| 31 | Removing the existing PVC sheet flooring including cleaning the surface as good in condition and disposal of dismantled material , for all leads including all lifts involved. as per direction of Engineer-in-charge. |
| 32 | Providing & fixing 2 mm thick homogenous vinyle sheet of make wonderfloor over the existing floor with adhesive of fevicol 505, after cleaning the floor & make the surface good with all respect as per the direction of EIC Please Enable Macros to View BoQ information |