| 1 | Earthwork in excavation in foundation including lift 1.5m and lead 30m including all labour material T & P etc. all cost complete (Sl. No. 251) |
| 2 | Concrete with 4cm gauge Brick Ballast, Fine sand and cement in propration 8:4:1 in foundation including supply of all material, labour and T&P etc. requried for proper completion of the work (Sl. No. 275) |
| 3 | Frist class brick work in 1 : 4 cement and coarse sand mortar in foundation including supply of all material, labour and T&P etc. requried for proper completion of the work (Sl. No. 305) |
| 4 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing bymix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specificatin Clause 401. |
| 5 | Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 4.7-405(3) |
| 6 | 12 mm thick plaster with cement and coarse sand morta in 1 : 5 ratio including supply of all material, labour and T&P etc. requried for proper completion of the work Sl. No. 584(I) |
| 7 | Supply and lying of factory made 80 mm. thick tiles of precosst compressed C.C. passing minimum 30 megapfscle compssive strenght I.SI. marked including levelling and dressing of surface to required level and slope filling joints with local sand including cost of all materials labour and T&P etc.but excluding cost of local sand required for proper completion of the work asper directed by E/I.CH.NO 20,NEW ITEM (1) |
| 8 | Cement concrete with 2cm gauge approved stone ballast, approved coarse sand and cement in the proportion of 4:2:1 including supply of all materials, labour and T&P etc. requried for proper completion of the work (Sl. No. 279(I)) |
| 9 | Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with as per Technical Specification Clause 301.5 |
| 10 | R.C.C work with cement approved coarse sand and 2cm gauge approved stone ballast in the proportion of 1:1.5:3 including supply of all materials, labour and T&P etc. requried for proper completion of the work, excluding supply of reinforce cement (Sl. No. 283a) |
| 11 | Mild steel or iron work in planeor R.C.C. work including cutting bending and fixing position including all completion of the work (S.I. No. 504) |
| 12 | Supply and fixing of Informatory Sign Board including all complete. Please Enable Macros to View BoQ information |