| 1 | Safe Carriage loading & unloading with Proper stacking of following material from store centre to pit site/JE dump store. (Approx75km). |
| 2 | Supply and erection of X-Arm holding Clamp 50x6 mm for PCC Pole 8.5 mtr. long as per RESPO Norms |
| 3 | Supply and erection of Nut, Bolts and Washer all Size as per RESPO Norms |
| 4 | Supply and erection of 11 KV F-Clamp 50x6mm MS Flat as per RESPO Norms |
| 5 | Supply and erection of I Hook as per RESPO Norms |
| 6 | Supply and erection of Suspension for LT Clamp |
| 7 | Supply and erection of LT Clamp with nut Bolts for Pcc pole 8.5mtr. long as per RESPO Norms |
| 8 | Supply and erection of LT Clamp with nut Bolts for ST pole 11mtr. long as per RESPO Norms |
| 9 | Supply and erection of MS T-off channel clamp as per RESPO Norms |
| 10 | Supply and erection of MS Dropper clamp as per RESPO Norms |
| 11 | Supply and erection of MS Top channel 50x6 mm clamp as per RESPO Norms |
| 12 | Supply and erection of X-arm holding clamp for PCC 11 Mtr. long as per RESPO Norms |
| 13 | Supply and erection of Stay Clamp 50x6mm MS Flat for PCC Pole 8.5 mtr. long as per RESPO Norms |
| 14 | Supply and erection of Stay Clamp 50x6mm MS Flat for ST Pole 11 mtr. long as per RESPO Norms |
| 15 | Supply and erection of Stay Clamp 50x6mm MS Flat for PCC Pole 11 mtr. long as per RESPO Norms |
| 16 | Supply & erection of Stay Insulator as per RESPO norms. |
| 17 | Carriage of Cross Arm V-Type from store center or from any other place to the respective site of work Distence up to 75 km through the Kachha Pacca road including the work of its loading & unloading at the respective ends also including the work of its dragging etc. and also including the cost of labour, T & P and carrier etc. required for proper transportation of material at site. |
| 18 | Carriage of PCC Poles 8.5 mtr from store center or from any other place to the respective site of work Distance up to 75 km through the Kachha Pacca road including the work of its loading & unloading at the respective ends also including the work of its dragging etc. and also including the cost of labour, T & P and carrier etc. required for proper transportation of material at site. |
| 19 | Carriage of PCC/ST Poles 9/11 mtr from store center or from any other place to the respective site of work Distence up to 75 km through the Kachha Pacca road including the work of its loading & unloading at the respective ends also including the work of its dragging etc. and also including the cost of labour, T & P and carrier etc. required for proper transportation of material at site. |
| 20 | Carriage of Top Channel from store center or from any other place to the respective site of work Distence up to 75 km through the Kachha Pacca road including the work of its loading & unloading at the respective ends also including the work of its dragging etc. and also including the cost of labour, T & P and carrier etc. required for proper transportation of material at site. |
| 21 | Carriage of Dropper Channel from store center or from any other place to the respective site of work Distence up to 75 km through the Kachha Pacca road including the work of its loading & unloading at the respective ends also including the work of its dragging etc. and also including the cost of labour, T & P and carrier etc. required for proper transportation of material at site. |
| 22 | Carriage of SS Base angle from store center or from any other place to the respective site of work Distence up to 75 km through the Kachha Pacca road including the work of its loading & unloading at the respective ends also including the work of its dragging etc. and also including the cost of labour, T & P and carrier etc. required for proper transportation of material at site. |
| 23 | Carriage of M.S. T- off Channel from store center or from any other place to the respective site of work Distence up to 75 km through the Kachha Pacca road including the work of its loading & unloading at the respective ends also including the work of its dragging etc. and also including the cost of labour, T & P and carrier etc. required for proper transportation of material at site. |
| 24 | Carriage of Line material viz. ACSR Weasel, Racoon/ Dog Conductor from store center or from any other place to the respective site of work through the Kachha Pacca road including the work of its loading & unloading at the respective ends also including the work of its dragging etc. and also including the cost of labour, T & P and carrier etc. required for proper transportation of material at site. |
| 25 | Carriage of Line material viz. ABC Cable (various size )from store center or from any other place to the respective site of work through the Kachha Pacca road including the work of its loading & unloading at the respective ends also including the work of its dragging etc. and also including the cost of labour, T & P and carrier etc. required for proper transportation of material at site. |
| 26 | Carriage of Disc Insulator with fitting from store center or from any other place to the respective site of work through the Kachha Pacca road including the work of its loading & unloading at the respective ends also including the work of its dragging etc. and also including the cost of labour, T & P and carrier etc. required for proper completion of work |
| 27 | Carriage of MS Earthing Rod with fitting from store center or from any other place to the respective site of work through the Kachha Pacca road including the work of its loading & unloading at the respective ends also including the work of its dragging etc. and also including the cost of labour, T & P and carrier etc. required for proper completion of work |
| 28 | Carriage of G.I. Wire from store center or from any other place to the respective site of work through the Kachha Pacca road including the work of its loading & unloading at the respective ends also including the work of its dragging etc. and also including the cost of labour, T & P and carrier etc. required for proper completion of work |
| 29 | Carriage of 11& 33 KV Disc Insulator with fitting from store center or from any other place to the respective site of work through the Kachha Pacca road including the work of its loading & unloading at the respective ends also including the work of its dragging etc. and also including the cost of labour, T & P and carrier etc. required for proper completion of work |
| 30 | Carriage of Stay Set Complete from store center or from any other place to the respective site of work through the Kachha Pacca road including the work of its loading & unloading at the respective ends also including the work of its dragging etc. and also including the cost of labour, T & P and carrier etc. required for proper completion of work |
| 31 | Replacement/ Erection of P.C.C 8.5 mtr Single pole including the work of complete H.T. fittings provided by contactor as per RESPO manual and Cross Arm, Pin insulator, Earthing Complete etc. as as per direction of engineer Incharge including the cost of labour, T & P and carrier etc. required for proper completion of work. |
| 32 | Replacement/ Erection of P.C.C 8.5 mtr Double pole including the work of complete H.T. fittings provided by contractor as per RESPO manual and Top, dropper channel , S/S base angle, T-off, pin insulator, disk insulator as per direction of engineer Incharge including the cost of labour, T & P and carrier etc. required for proper completion of work. |
| 33 | Replacement/ Erection of P.C.C 9/11 mtr Single pole including the work of complete H.T. fittings provided by contractor as per RESPO manual and Cross Arm, Pin insulator, Earthing Complete etc. as per direction of engineer Incharge including the cost of labour, T & P and carrier etc. required for proper completion of work. |
| 34 | Replacement/ Erection of ST/ P.C.C 9/11 mtr Double pole including the work of complete H.T. fittings provided by contractor as per RESPO manual and M.S. Angle, Top and Dropper channel, Disc Insulator, Pin Insulator, Earthing Complete as per direction of engineer Incharge including the cost of labour, T & P and carrier etc. required for proper completion of work. |
| 35 | Grouting of various size STP/PCC Pole Single/Double Structure. The support shall be grouted with cement, sand and brick ballast/stone ballast In ratio 1:4:8 including the cost of arrangement of cement, sand, brick ballast/stone ballast, stone pad etc. as per actual site requirement. |
| 36 | Rebinding of Damaged stay set as per RESPO manual and also including the cost of all outing material, labour, T & P etc. required for proper completion of work. |
| 37 | Dismentling of Rusted Weasal/Racoon /DOG conductor wire and G.I Wire & safe carriage of scrap material back to store as per RESPO manual and as per direction of supervising engineer. It includes the cost of labour, T & P, carries etc. required for proper completion of work. |
| 38 | Laying, Sagging, Stringing, Binding and Jumpering etc. of Weasal conductor in new erected pole as per RESPO manual and as per direction of supervising engineer. It includes the cost o labour, T & P, carries etc. required for proper completion of work. |
| 39 | Re-Sagging, of old Weasal conductor in pole as per RESPO manual and as per direction of supervising engineer. It includes the cost of labour, T & P, carries etc. required for proper completion of work. |
| 40 | Laying, Sagging, Stringing, Binding and Jumpering etc. of Rabbit conductor as per RESPO manual and as per direction of supervising engineer. It includes the cost of labour, T & P, carries etc. required for proper completion of work. |
| 41 | Re-Sagging, of DOG conductor as per RESPO manual and as per direction of supervising engineer. It includes the cost of labour, T & P, carries etc. required for proper completion of work. |
| 42 | Laying/Strengthening of Damaged various LT ABC Single/3- Phase As per respo manual |
| 43 | Allingment of Tillted Pole to Complete Line as per RESPO Norms. |
| 44 | Repairing of double pole to complete HT line fitting as per RESPO Norms. |
| 45 | Trimming of Tree Branches in New/existing 11 K.V Line. |
| 46 | Fabrication erection and comissioning of 63/25/16/10 KVA T/F on double/single pole with all accessories. All Material except 25/16/10 KVA T/F shall be provided by the contractor. |
| 47 | Errection of Stay set complete |
| 48 | Resagging of various size LT ABC Cable |
| 49 | Fixing of Ordinary Earthing by 11 KV MS Earth Rod 2500 mm long as per RESPO Schedule Please Enable Macros to View BoQ information |