|
| 1 | Earth work in excavation of foundation in all kinds of soil including dressing and levelling the bed to required section, breaking clods to maximum 5 cm to 7 cm and depositing the excavated materials away from work site in layers not exceeding 0.3m in depth with all leads, lifts and delifts including dewatering, shoring, shuttering, etc. if required, all labour charges, T&P, B & O.C. Workers Welfare Cess etc. complete as directed by the Engineer-in-charge. |
| 2 | Filling in foundation and plinth and sides of structures with sand of approved quality including watering & ramming with all leads, lifts and delifts including cost, conveyance, royalty, EMF, DMF & Additional Charges taxes etc. of all materials, all labour charges, T & P, B & O.C. Workers Welfare Cess etc. complete as directed by the Engineer-in-Charge. |
| 3 | Cement concrete M-15 grade with 40 mm and down grade size crusher broken hard granite metal of approved quality free from weathered skin surface or any other deleterious materials, mixing and vibrating by mechanical means including hoisting and laying with all leads, lifts and delifts including cost, conveyance, royalty EMF, DMF & Additional Charges taxes etc. of all materials, all labour charges, providing weep holes and construction joints as per requirement, T&P, hire and running charges of all machineries, watering and curing, B & O.C. Workers Welfare Cess etc. complete as directed by Engineer in charge. |
| 4 | Cement concrete M-15 grade with 20 mm and down grade size crusher broken hard granite metal of approved quality free from weathered skin surface or any other deleterious materials, mixing and vibrating by mechanical means including hoisting and laying with all leads, lifts and delifts including cost, conveyance, royalty EMF, DMF & Additional Charges taxes etc. of all materials, all labour charges, providing weep holes and construction joints as per requirement, T&P, hire and running charges of all machineries, watering and curing, B & O.C. Workers Welfare Cess etc. complete as directed by Engineer in charge. |
| 5 | Excavation, loading, unloading and carriage by mechanical means of all kinds of soil, including stoney earth, gravel and moorum etc. interspread with boulders up to 1/2 cum size with all leads, lifts and delifts including trimming of slopes and bed to design section and depositing the excavated materials away from work site as per specification and as directed by the Engineer-in-charge within initial lead of 1km from the place of excavation, B & O.C. Workers Welfare Cess etc. complete as per specification and as directed by the Engineer-in-charge.(Measurement is to be taken on finished level section). |
| 6 | Providing Form Work for concrete with F-1 finish for unexposed surfaces of structures with steel shutters rigidly fixed and removal of forms and making good to the surfaces where necessary complete with all labour, materials & T & P, B & O.C. Workers Welfare Cess complete as directed by the Engineer-in-Charge. |
| 7 | Filling in foundation and plinth and sides of structures with excavated materials including watering & ramming with all leads, lifts & delifts, all labour charges, T & P, B & O.C. Workers Welfare Cess etc. complete as directed by the Engineer-in-charge. Please Enable Macros to View BoQ information |