| 1 | Clearing & grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, sapling and trees girth upto 300mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of servicible materials to be used for auctioned, up to a lead of 1000 mtr. Including revoval & disposal of top organic soil not exceeding 150mm in thickness etc. Complete as per direction of Engineer-in-Charge. (Premeasurement to be recorded prior to execution) |
| 2 | Earth work in all kinds of soil from approved borrow areas except sand, sandy and slushy soil and transportation of excavated earth by mechanical /manual means with all leads, lifts and delifts including breacking clods maximum 5cm to 7cm and laying in layers not exceeding 0.30m in depth over the properly prepared surface including uprooting stumps with cost of hire and running charges of transport vehicle, T&P, royality and all other incidential charges etc. Complete as per direction of Engineer-in-Charge. (The earth should be arranged by the bidder at his own cost and royality will be deducted as applicable). Measurement will be taken on finished level section.) |
| 3 | Collecting, supplying and stacking good quality Moorum & sand in regular box heaps of size 1.50mx 1.50m x 0.50m to be measured as one cum and admixing moorum and sand in 60:40 proportion and laying in sub base in layers to the required thickness with all leads, lifts and delifts including cost, conveyance, royality and taxes of all materials etc. with all labour and hire charges of T&P materials required for the work, watering and compacting to the required density in OMC condition with PRR including hire and running charges of machineries etc. Complete asper direction of Engineer-in-Charge. |
| 4 | Collecting, supplying & stacking good quality IRC grade-III HG metal 53mm to 22.40 mm (as per MOST specification) of approved quality for metalling to an uniform thickness 100mm thick compacted and thickness packing the voids with small stones and hand packing the same to proper camber including conveying spreading of filler materials (moorum) and filling the interstices by spreading the same with proper camber over the surface watering consolidation with PRR including cost, carriage, royalty and all other taxes of materials to the site of work including hire and running charges of PRR with POL etc. Complete as per direction of Engineer-in-Charge. (Measurement will be taken on finished compacted surface only). |
| 5 | Collecting, supplying and stacking of good quality laterite moorumat work site in regullar box heap of 1.50x1.50x0.50 to be measured as one cum in and conveying from stacks and spresding on road surface in layers to the required thickness with all leads, lifts and delifts including cost, conveyance, royalty and taxes of all materials and labour including watering and consolidated with PRR with hire and running charges of all machineries etc. Complete as per direction of Engineer-in-Charge. |
| 6 | Providing applying primer coat with bitumen emulsion on prepared surface of granular base including cleaning of road surface and spraying primer at the rate pof 0.60kg/sqm using mechanical means as per clause 502 of MOSRT & H specification for road and bridge works including cost, carriage, royality and all other taxes of materials to the site of work etc. Complete as per direction of the Engineer -in- charge. |
| 7 | Providing applying tack coat including cost of bitumen emulsion of penetration grade over prepared surface using 0.20kg peneration grade per sqm over granular base treated with non primer surface including cost carriage and all other taxes of materials to the site of work etc. Complete as per direction of the Engineer -in- charge. |
| 8 | Labour for scarping, cleaning road surface and providing & laying 20mm thick premix carpet using 0.27 cum of 13.2mm to 5.6mm aggregate for 10m² with 14.60kg of penetration grade of bitumen including hand packing to proper camber and consolidation with PRR including hire & running charges of PRR hot mix plant & bitumen boiler with all cost, carriage, royalty of all materials, T&P to the site of work & taxes of all materials etc. Complete as per direction of Engineer-in-Charge. |
| 9 | Labour for laying 6mm thick pre coated seal coat over premix carpet using 0.06cum of 6mm size hard granite chips downgraded & 6.80 kg of bitumen for 10m² conveying chips from stacking yard at work site, feeding in to hot bitumen mixture, heating bitumen to required temperature, conveying and spreading for pre coating chips in required quantity to ensure through pre coating apply tack coat conveying pre-coated chips for mixture & laying the same to proper profile & consolidation with PRR inclusive of hire and running charges of PRR, with POL bitumen mixtures, tar boiler and all other T&P articles including cost, carriage, royalty of all materials required for the work etc. Complete as per the direction of Engineer-In-charge. Please Enable Macros to View BoQ information |