| 1 | Earth work in all kinds of soil from approved borrow areas except sand, sandy and slushy soil and transportation of excavated earth by mechanical /manual means with all leads, lifts and delifts including breacking clods maximum 5cm to 7cm and laying in layers not exceeding 0.30m in depth over the properly prepared surface including uprooting stumps with cost of hire and running charges of transport vehicle, T&P, royality and all other incidential charges etc. Complete as per direction of Engineer-in-Charge. (The earth should be arranged by the bidder at his own cost and royality will be deducted as applicable). Measurement will be taken on finished level section.) |
| 2 | Earth work in excavation of foundation in all kinds of soil by manual means/mechanical means with all leads, lifts & delifts including leveling and dressing the foundation bed upto design bed level and depositing the excavated earth away from the working area including breaking clods maximum 5cm to 7cm in size and laying in layers not exceeding 0.30mtr. in depth including bailing out water and dewatering if required etc. Complete as per direction of Engineer-In-Charge |
| 3 | Filling foundation and plinth with sand including watering & ramming with all labour and T&Ps with all leads, lifts and delifts including cost carriage & royalty of all materials etc. Complete as per direction of Engineer-in-Charge |
| 4 | Cement concrete (1:3:6) using 4cm size hard granite crusher broken metal free from weathered skin surface of uniform colour and texture from approved quarry and approved quality conferming to specification, mixing by concrete mixture including hoisting and laying concrete in position with all leads, lifts, and delifts including cost conveyance, royalty and taxes of materials including dewatering by suitable means, supplying T&P quaring for specified period with hire and running charges of machineries required for the work, construction and maintenance of coffer dam and approach road if required till completion of work etc. Complete as per direction of Engineer-in-Charge. |
| 5 | Cement concrete (1:2:4) using 12mm size hard crusher broken granite chips/aggregate free from weathered skin surface of uniform colour and texture from approved quarry and approved quality conforming to specification mixing by concrete mixure including hoisting, laying concrete in position including cost, carriage, royalty and taxes of materials including dewatering by suitable means, supplying T&P quaring for specified period with hire and running charges of machineries required to the site of work with curing upto required period etc. Complete as per direction of Engineer-in-Charge. |
| 6 | Providing and laying cement concrete (1:1.5:3) with 12mm downgraded hard granite chips free from weathered skin and other deleterious materials of approved quality of uniform colour and texture aggregate and sharp sand of approved grading and quality for RCC/CC confirming to the specifications with all leads, lifts delifts and and mixing by mechanical /manual means including cost, carriage, royalties and taxes of all materials including de watering by suitable means mixing concrete by concrete mixer and placing in position with all T&P curing for required period by suitable means, etc. Complete as per direction of Engineer-in-Charge. |
| 7 | Rigid smooth centering and shuttering for RCC/CC work including false work and dismantling them after casting and removing the debris away from the working area and stacking the useful materials for reuse including cost, carriage, royalty and taxes of all materials with all labour to the site of work etc. Complete as per direction of the Engineer-in-Charge. |
| 8 | Labour charges for straighting, cutting, bending, binding and tying the grils and placing in position for fabrication and finishing of reinforcement including topping when necessary including supply of binding wire 18 to 20 gauge with all leads, lifts from binding yard including cost, carriage of un coated HYSD bar confirming to Fe 415 grade including over lapping, and wastage, welding etc. Complete as per direction of the Engineer-in-Charge. |
| 9 | Providing good quality gravel backing in appron and revetment and spreading to proper thickness for Rough stone dry Packing with ramming, watering, ramming etc. including cost, carriage, royalty and all other taxes etc. Complete as per the direction of the Engineer-in-Charge. |
| 10 | Rough stone dry packing in aprons & revetments with hard granite stone boulder of 15cm to 30 cm size & filling interstices with small stone including cost, carriage & royalty and all other taxes of materials to the site of work for finished work etc. Complete asper direction of Engineer-in-Charge. |
| 11 | Filling foundation and plinth with excavated materials including watering ramming with all labour and all T&Ps with all leads, lifts and delifts including cost carriage & royalty of all materials etc. Complete as per direction of Engineer-in-Charge Please Enable Macros to View BoQ information |