| 1 | Earth work in excavation of foundation in all kinds of soil including dressing and levelling the bed to required section, breaking clods to maximum 5 cm to 7 cm and depositing the excavated materials away from work site in layers not exceeding 0.3m in depth with all leads, lifts and delifts including dewatering, shoring, shuttering, etc. if required, all labour charges, T&P, B & O.C. Workers Welfare Cess etc. complete as directed by the Engineer-in-charge. |
| 2 | Filling in foundation and plinth and sides of structures with sand of approved quality including watering & ramming with all leads, lifts and delifts including cost, conveyance, royalty, EMF, DMF & Additional Charges taxes etc. of all materials, all labour charges, T & P, B & O.C. Workers Welfare Cess etc. complete as directed by the Engineer-in-Charge. |
| 3 | Cement concrete M-15 grade with 40 mm and down grade size crusher broken hard granite metal of approved quality free from weathered skin surface or any other deleterious materials, mixing and vibrating by mechanical means including hoisting and laying with all leads, lifts and delifts including cost, conveyance, royalty EMF, DMF & Additional Charges taxes etc. of all materials, all labour charges, providing weep holes and construction joints as per requirement, T&P, hire and running charges of all machineries, watering and curing, B & O.C. Workers Welfare Cess etc. complete as directed by Engineer in charge. |
| 4 | R.C.C. work of M-20 grade with 20 mm and down grade size crusher broken hard granite chips of approved quality free from weathered skin surface or any other deleterious materials, mixing and vibrating by mechanical means including hoisting and laying with all leads, lifts and delifts including cost, conveyance, royalty EMF, DMF & Additional Charges taxes etc. of all materials, all labour charges, T&P, hire and running charges of all machineries, watering and curing, B & O.C. Workers Welfare Cess etc. complete as directed by Engineer in charge. |
| 5 | Providing Form Work for concrete with F-1 finish for unexposed surfaces of structures with steel shutters rigidly fixed and removal of forms and making good to the surfaces where necessary complete with all labour, materials & T & P, B & O.C. Workers Welfare Cess complete as directed by the Engineer-in-Charge. |
| 6 | Filling in foundation and plinth and sides of structures with excavated materials including watering & ramming with all leads, lifts & delifts, all labour charges, T & P, B & O.C. Workers Welfare Cess etc. complete as directed by the Engineer-in-charge. |
| 7 | Supplying, straightening, cutting, bending, binding, tying with binding wire 18 to 20 SWG, fitting and placing in position uncoated HYSD bar reinforcement of different sizes complete as per drawing and technical specification with all laps, hooks, ties etc. with all leads, lifts & delifts including cost, conveyance etc. of all materials, all labour charges, T&P, B & O.C. Workers Welfare Cess etc. complete as directed by the Engineer-in-charge. |
| 8 | Earth work in excavation in hard soil in approved borrow area by mechanical means, loading into and transportation of the excavated materials by mechanical means and depositing them in filling reaches of canals on properly prepared and scientifically approved surface to the required section including breaking clods to maximum 5cm to 7cm size and laying in layers not exceeding 0.3m in depth, spreading and levelling with all leads, lifts & delifts including cost, conveyance and royalty of earth, all labour charges, T&P, hire and running charges of transport vehicle, B & O.C. Workers Welfare Cess etc. complete as per specification and as directed by the Engineer-in-charge.(Mesurement is to be taken on finished level section.) Please Enable Macros to View BoQ information |