|
| 1 | Clearing grass and removal of rubbish up to a distance of 50m outside the periphery of the area, etc. complete as per the direction of the Engineer-in-charge. |
| 2 | Earth work excavation of foundation in ordinary soil within 50m initial lead and 1.5m initial lift including dressing and levelling the bed with shoring, shuttering and dewatering if required etc. complete and as per the direction of the Engineer-in-charge. |
| 3 | Filling in foundation and plinth with sand well watered and rammed below bed including cost, conveyance, royalty, taxes and labour charges etc. complete and as per the direction of the Engineer-in-charge. |
| 4 | Cement concrete M15 grade with 20mm and down graded hard granite crusher broken chips of approved quality free from skin materials mixing by concrete mixture including hoisting, lowering and laying the concrete in position to proper slope, level and compacting by vibrators in layers not exceeding 0.15m depth and finishing the exposed surface smooth including watering with cost, conveyance, hire and running charges of all machineries, royalty and other taxes of all T &P materials, labour etc. complete and as per the direction of the Engineer-in-charge. |
| 5 | Rigid and smooth centering and shuttering for concrete work and dismantling after casting with cost, conveyance, taxes of all materials and laboor charges etc. complete and as per the direction of the Engineer-in-charge. |
| 6 | Collecting, conveying, stacking and spreading moorum and consolidation with HRR including watering with cost, conveyance of moorum etc. complete as per the direction of the Engineer-in-charge. |
| 7 | Providing and laying cement concrete M15 grade with 20mm and down graded hard granite coarse aggregate for concrete laying to the bed and slope of canal with sleeper beams, keys etc. in panels including supply of materials, labour and machineries compacting with space vibrator or manually and finishing the concrete surface including trimming and dressing of canal bed and slopes including cutting trenches for sleeper beam, keys and drainage etc. including watering and compaction of slopes and bed with hand rammers to proper profile and supplying and laying polythene film of 100 micron complete and as per the direction of the Engineer-in-charge. |
| 8 | Filling the foundation & Plinth with excavated materials including watering and ramming etc. complete as directed by the Engineer-in-Charge. |
| 9 | Earthwork in ordinary soil within 50m initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per the direction of the Engineer-in-Charge. |
| 10 | Form work for concrete with F1 finishing using steel shutter plates of approved specification for surfaces not prominently or permanently exposed to public view including supply of all materials, T & P, labour and transportation of all materials etc. complete as directed by the Engineer-in-charge. |
| 11 | Earth work in excavation in ordinary soil from Canal bed within the initial lead of 50m & initial lift of 1.50m including dressing & levelling the bed and slope and breaking the clods to maximum size 5cm to 7cm and laying in layers not exceeding 0.30m in height and etc. complete as per the direction of the Engineer-in-charge. Please Enable Macros to View BoQ information |