|
| 1 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees in area of light jungles upto 300mm girth, removal of stumps of trees cut earlier, disposal of unserviceable materials and debris away from the work site and stacking of serviceable materials to be used or auctioned up including removal and disposal of top organic soil not exceeding 150mm in thickness with all leads, lifts and delifts, all labour charges, T&P, B & O.C. Workers Welfare Cess etc. complete as directed by the Engineer-in-charge |
| 2 | Earth work in excavation of foundation in all kinds of soil including dressing and levelling the bed to required section, breaking clods to maximum 5 cm to 7 cm and depositing the excavated materials away from work site in layers not exceeding 0.3m in depth with all leads, lifts and delifts including dewatering, shoring, shuttering, etc. if required, all labour charges, T&P, B & O.C. Workers Welfare Cess etc. complete as directed by the Engineer-in-charge. |
| 3 | Filling in foundation and plinth and sides of structures with sand of approved quality including watering & ramming with all leads, lifts and delifts including cost, conveyance, royalty, EMF, DMF & Additional Charges taxes etc. of all materials, all labour charges, T & P, B & O.C. Workers Welfare Cess etc. complete as directed by the Engineer-in-Charge. |
| 4 | Cement concrete M-15 grade with 40 mm and down grade size crusher broken hard granite metal of approved quality free from weathered skin surface or any other deleterious materials, mixing and vibrating by mechanical means including hoisting and laying with all leads, lifts and delifts including cost, conveyance, royalty EMF, DMF & Additional Charges taxes etc. of all materials, all labour charges, providing weep holes and construction joints as per requirement, T&P, hire and running charges of all machineries, watering and curing, B & O.C. Workers Welfare Cess etc. complete as directed by Engineer in charge. |
| 5 | Providing Form Work for concrete with F-1 finish for unexposed surfaces of structures with steel shutters rigidly fixed and removal of forms and making good to the surfaces where necessary complete with all labour, materials & T & P, B & O.C. Workers Welfare Cess complete as directed by the Engineer-in-Charge. |
| 6 | Filling in foundation and plinth and sides of structures with excavated materials including watering & ramming with all leads, lifts & delifts, all labour charges, T & P, B & O.C. Workers Welfare Cess etc. complete as directed by the Engineer-in-charge. |
| 7 | Providing and laying granular sub-base with moorum and sand admixture (70:30) of approved quality and laying in layers not exceeding 100mm including watering and compaction to the required density with P.R.R including cost and conveyance of sub-base materials with all leads, lifts & delifts, all labour charges, T&P, hire and running charges of all machineries, B & O.C. Workers Welfare Cess etc. complete as directed by the Engineer-in-charge.(Measurement is to be taken on finished level section) |
| 8 | Providing, laying, spreading and compacting I.R.C. Grade - I stone aggregates of size 90 mm to 45 mm to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheeled steel roller 8-10 tonnes in stages to proper grade and camber, applying and brooming moorum of approved quality as crushable type binding material to fill up the interstices of coarse aggregates, watering and compacting to the required density as per Clause 404 of MoSRT&H Specifications for Road and Bridge works (4th Revision) with all leads, lifts & delifts including cost, conveyance, royalty, EMF, DMF & Additional Charges taxes etc. of all materials, all labour charges, T&P, hire and running charges of all machineries, B & O.C. Workers Welfare Cess etc. complete as per specification and as directed by the Engineer-in-charge. (Measurement is to be taken on finished level section). |
| 9 | Excavation, loading, unloading and carriage by mechanical means of all kinds of soil, including stoney earth, gravel and moorum etc. interspread with boulders up to 1/2 cum size with all leads, lifts and delifts including trimming of slopes and bed to design section and depositing the excavated materials away from work site as per specification and as directed by the Engineer-in-charge within initial lead of 1km from the place of excavation, B & O.C. Workers Welfare Cess etc. complete as per specification and as directed by the Engineer-in-charge.(Measurement is to be taken on finished level section). Please Enable Macros to View BoQ information |