| 1 | PART A:Construction of 0.120 CKM , 11 KV O/H line using 55 Sq.mm. XLPE Insulated Conductor |
| 2 | DP Without AB Switch |
| 3 | WPB (GI) Pole 160x152 (11Mtr. Long, 30.44KG/Mtr.)-DP(Total Pole Weight with Base Plate & Stiffner=334.84 KG+10.74 KG= 345.58 KG) |
| 4 | Top Channel(GI) 100X50X6mm, 9.56 KG/Mtr., each Channel(GI) length 2.3 mtr., 2 no's Channel(GI) required =( 2x9.56x2.3) |
| 5 | Fish Plate(GI) 50x6 mm., 2.36 kg/Mtr., each 0.280 mtr. length, 6 no's required = (6x2.36x0.280) |
| 6 | AB switch Mounting Channel(GI) 75X40X4.8mm, 7.14KG/Mtr, each Channel(GI) length 3 Mtr., 2 no's Channel(GI) required =( 7.14x3x2) |
| 7 | AB Switch Side Support Channel(GI) 100X50X6mm,9.56 KG/Mtr., each Channel(GI) length 0.35 mtr., 2 no's Channel(GI) required =( 9.56x2x0.35) |
| 8 | Channel(GI) Support for down Pipe 75X40X 4.8mm., 7.14KG/Mtr., each Channel(GI) length 0.8 Mtr., 1 no's Channel(GI) required =( 7.14x0.8x1) |
| 9 | Double Pole Belting Channel(GI) 75X40X 4.8mm., 7.14KG/Mtr., each Channel(GI) length 1.66 Mtr., 4 no's Channel(GI) required =( 7.14x1.66x4) |
| 10 | 50x50x6mm.GI Bracing Angle(GI), 4.5Kg./mtr., each Angle(GI) length 2.671 mtr., 4 nos Angle(GI) required = (4.5x2.671x4) |
| 11 | Danger Plate, 2 no's. |
| 12 | Back Clamp for danger Plate 25X3 mm. Flat(GI), 0.59Kg/Mtr. Flat(GI) of 0.510mtr length 2 no's = (2x0.59x0.510) |
| 13 | H.T. Stay clamp, 50x8 mm. Flat(GI), 3.14Kg/Mtr., 0.551 Mtr. Length, 2 no's qty. required ( 1 Pair) |
| 14 | H.T. Stay set (Complete ) |
| 15 | H.T. Stay Insulator Type-C |
| 16 | 7/10 SWG Stay Wire 15kg /stay |
| 17 | Gi Pipe Earthing 40mm. 3 Mtr. Long |
| 18 | 50x6mm Flat(GI) for earthing, 2.36kg/mtr., (2.5 mtr. For mesh formation and 2.5 mtr. For raising)= 5x2.36 |
| 19 | GI barbed wire anticlimbing device 3 Kg. Per support, 2 no's qty. required =(2x3kg) |
| 20 | Back Clamp for anticlimbing device 25X3 mm. Flat(GI), 0.59Kg/Mtr. Flat(GI) of 0.510mtr length 8 no's = (8x0.59x0.510) |
| 21 | Lightning Arrester(12KV,10KA) (Station Class,class-2) |
| 22 | AB Switch (11KV,400A.3pole,50Hz) |
| 23 | 11 KV pin insulator polymer |
| 24 | H W fitting(B&S) 70KN, 3Bolt |
| 25 | Disc insulator (B&S) 70 KN polymer |
| 26 | NON METALLIC TIES -11KV 55SQMM CVRD AAAC |
| 27 | IPC for 55 sq.mm AAA conductor (For covered conductor)-11kV |
| 28 | Spike (GI ) (using 50x6mm Flat(GI) welded with 8 mm square bar) ( 2 Nos of spike per Set in each Pole ) |
| 29 | GI Nut , Bolt & Washer of different sizes (12.261 Kg each DP without AB Switch) |
| 30 | Black Paint(GIS Numbering & Zebra Stripping) |
| 31 | Yellow Colour Paint(GIS Numbering & Zebra Stripping) for Background |
| 32 | Civil & Services |
| 33 | Fixing of complete 11KV line Complete stay set includes 1) Turn Buckle Assembly 2) Stay Rod & Stay plate 3) Stay Insulator 4) Stay Wire.5)Stay clamps with Nuts & bolts BA will do the excvation including excvation, supply of 0.5Cum cement concrete foundation 1:2:4 size ( 500mmx500mmx800mm) using 20mm BHG metal with all labour and material as per TPCODL Drawing & Standard. |
| 34 | Concreting ratio 1:1.5:3(M-20 Grade) (500mmX500mmX1800mm) = 0.45Cu.mtr(Per Pole) |
| 35 | Couping ratio 1:1.5:3(M-20 Grade) with dimension (500X500X450)= 0.1125 Cu mtr(Per Pole) |
| 36 | Provide necessary civil material for construction of Earthing chamber, excavation & installation of incuding earthingpipe dia up to 100mm dia for length of 3Mtr.Scope also includes necessary nutbolt, 25 Kg Bentonide Power , connection & welding with incoming earth Flat(GI). The work to be executed as per TPCODL drawing & design |
| 37 | 11 KV Cut Point with 90 Degree Angle |
| 38 | WPB (GI) Pole 160x152 (11Mtr. Long, 30.44KG/Mtr.)(Total Pole Weight with Base Plate & Stiffner=334.84 KG+10.74 KG= 345.58 KG) |
| 39 | Straight Cross Arm 100X50X6mm, 9.56 KG/Mtr., each Channel(GI) length 1.2 mtr., 4 no's Channel(GI) required =( 4x9.56x1.2) |
| 40 | Fish Plate(GI) 50x6 mm., 2.36 kg/Mtr., each 0.280 mtr. length, 16 no's required = (16x2.36x0.280) |
| 41 | Straight Cross Arm 100X50X6mm, 9.56 KG/Mtr., each Channel(GI) length 0.306 mtr., 4 no's Channel(GI) required =( 4x9.56x0.306) |
| 42 | Danger Plate, 1 no's. |
| 43 | Back Clamp for danger Plate 25X3 mm. Flat(GI), 0.59Kg/Mtr. Flat(GI) of 0.510mtr length 1 no's = (1x0.59x0.510) |
| 44 | GI barbed wire anticlimbing device 3 Kg. Per support |
| 45 | Back Clamp for anticlimbing device 25X3 mm. Flat(GI), 0.59Kg/Mtr. Flat(GI) of 0.510mtr length 4 no's = (4x0.59x0.510) |
| 46 | 11 KV pin insulator polymer |
| 47 | H W fitting(B&S) 70KN, 3Bolt |
| 48 | Disc insulator (B&S) 70 KN polymer |
| 49 | Earthing of Support ( Coil Type ) |
| 50 | No-8 GI wire (Dia 4.6mm) 0.131 KG/ Mtr.- 2 Mtr. For connecting pole with Coil earthing |
| 51 | NON METALLIC TIES -11KV 55SQMM CVRD AAAC |
| 52 | IPC for 55 sq.mm AAA conductor (For covered conductor)-11kV |
| 53 | Spike (GI ) (using 50x6mm Flat(GI) welded with 8 mm square bar) ( 2 Nos of spike per Set in each Pole ) |
| 54 | H.T. Stay clamp, 50x8 mm. Flat(GI), 3.14Kg/Mtr., 0.551 Mtr. Length, 2 no's qty. required ( 1 Pair) |
| 55 | H.T. Stay set (Complete ) |
| 56 | H.T. Stay Insulator Type-C |
| 57 | 7/10 SWG Stay Wire 15kg /stay |
| 58 | GI Nut , Bolt & Washer of different sizes (7.433 Kg each Cut Pole) |
| 59 | Black Paint(GIS Numbering & Zebra Stripping) |
| 60 | Yellow Colour Paint(GIS Numbering & Zebra Stripping) for Background |
| 61 | Civil & Services |
| 62 | Fixing of complete 11KV line Complete stay set includes 1) Turn Buckle Assembly 2) Stay Rod & Stay plate 3) Stay Insulator 4) Stay Wire.5)Stay clamps with Nuts & bolts BA will do the excvation including excvation, supply of 0.5Cum cement concrete foundation 1:2:4 size ( 500mmx500mmx800mm) using 20mm BHG metal with all labour and material as per TPCODL Drawing & Standard. |
| 63 | Concreting ratio 1:1.5:3(M-20 Grade) (500mmX500mmX1800mm) = 0.45Cu.mtr(Per Pole) |
| 64 | Couping ratio 1:1.5:3(M-20 Grade) with dimension ( 500X500X450)= 0.1125 Cu mtr(Per Pole) |
| 65 | 11 KV Pin Points With WPB |
| 66 | 55 SQ.MM. AAAC XLPE Covered Conductor |
| 67 | Part-B:Installation of One No. of 11KV DP with AB Switch and LA for HT metering unit |
| 68 | WPB (GI) Pole 160x152 (13Mtr. Long, 30.44KG/Mtr.)-DP (Total Pole Weight with Base Plate & Stiffner=395.72 KG+10.74 KG= 406.46 KG) |
| 69 | Top Channel(GI) 100X50X6mm, 9.56 KG/Mtr., each Channel(GI) length 3 mtr., 2 no's Channel(GI) required =( 2x9.56x3) |
| 70 | Fish Plate(GI) 50x6 mm., 2.36 kg/Mtr., each 0.280 mtr. length, 6 no's required = (6x2.36x0.280) |
| 71 | AB switch Mounting Channel(GI) 75X40X4.8mm, 7.14KG/Mtr, each Channel(GI) length 3 Mtr., 2 no's Channel(GI) required =( 7.14x3x2) |
| 72 | HT MU Mounting Channel(GI) 100X50X6mm, 9.56KG/Mtr, each Channel(GI) length 3 Mtr., 2 no's Channel(GI) required =( 9.56x3x2) |
| 73 | HG/ DO Fuse Mounting Channel(GI) 75x40x4.8 mm GI Channel(GI) (3000 mm long)(7.14Kg./Mtr., 2 No's.) (Each 2x3.000x7.14= 42.84 Kg) |
| 74 | Cantilever Support Channel(GI) 75x40x4.8 mm GI Channel(GI) (810 mm long,2 No's.) (7.14Kg./Mtr., 2 No's.) (Each 2x0.81x7.14) |
| 75 | Angle(GI) for Cantilever arrrangement for HT MU 50 x 50 x 6 - 1282 mm.each 2 nos.(4.5 K.g. per mtr.) |
| 76 | MU and AB Switch Side Support Channel(GI) 100X50X6mm,9.56 KG/Mtr., each Channel(GI) length 0.35 mtr., 4 no's Channel(GI) required =( 9.56x4x0.35) |
| 77 | Channel(GI) Support for down Pipe 75X40X 4.8mm., 7.14KG/Mtr., each Channel(GI) length 0.8 Mtr., 1 no's Channel(GI) required =( 7.14x0.8x1) |
| 78 | Double Pole Belting Channel(GI) 75X40X 4.8mm., 7.14KG/Mtr., each Channel(GI) length 3 Mtr., 2 no's Channel(GI) required =( 7.14x3x2) |
| 79 | 50x50x6mm.GI Bracing Angle(GI), 4.5Kg./mtr., each Angle(GI) length 3.512 mtr., 2 nos Angle(GI) required = (4.5x3.512x2) |
| 80 | Danger Plate, 2 no's. |
| 81 | Back Clamp for danger Plate 25X3 mm. Flat(GI), 0.59Kg/Mtr. Flat(GI) of 0.510mtr length 2 no's = (2x0.59x0.510) |
| 82 | 55 SQ.MM. AAAC XLPE Covered Conductor |
| 83 | H.T. Stay clamp, 50x8 mm. Flat(GI), 3.14Kg/Mtr., 0.551 Mtr. Length, 2 no's qty. required ( 1 Pair) |
| 84 | H.T. Stay set (Complete ) |
| 85 | H.T. Stay Insulator Type-C |
| 86 | 7/10 SWG Stay Wire 15kg /stay |
| 87 | Gi Pipe Earthing 40mm. 3 Mtr. Long |
| 88 | 50x6mm Flat(GI) for earthing, 2.36kg/mtr., (12.5 Mtr. For L.A, 3 Mtr for AB Switch Body, 2.5 mtr. For mesh formation and 2.5 mtr. For raising)= 20.5x2.36 |
| 89 | GI barbed wire anticlimbing device 3 Kg. Per support, 2 no's qty. required =(2x3kg) |
| 90 | Back Clamp for anticlimbing device 25X3 mm. Flat(GI), 0.59Kg/Mtr. Flat(GI) of 0.510mtr length 8 no's = (8x0.59x0.510) |
| 91 | Lightning Arrester(12KV,10KA) (Station Class,class-2) |
| 92 | AB Switch (11KV,200A.3pole,50Hz) |
| 93 | 11 KV pin insulator polymer |
| 94 | H W fitting(B&S) 70KN, 3Bolt |
| 95 | Disc insulator (B&S) 70 KN polymer |
| 96 | WEDGE CONNECTOR FOR 55 SQMM.CONDUCTOR |
| 97 | GI Nut , Bolt & Washer of different sizes (13.718 Kg each DP with AB Switch) |
| 98 | POLYCARBONATE BIRD GUARD |
| 99 | Black Paint(GIS Numbering & Zebra Stripping) |
| 100 | Yellow Colour Paint(GIS Numbering & Zebra Stripping) for Background |
| 101 | D.O Fuse (11KV 200A 3Pole) |
| 102 | 20 Amp Fuse Link |
| 103 | Civil & Services |
| 104 | Fixing of complete 33KV line Complete stay set includes1) Turn Buckle Assembly 2) Stay Rod & Stay plate 3) Stay Insulator 4) Stay Wire.5)Stay clamps with Nuts & bolts BA will do the excvation including excvation, supply of 0.5Cum cement concrete foundation 1:2:4 size ( 500mmx500mmx800mm) using 20mm BHG metal with all labour and material as per TPCODL Drawing & Standard.Note:- Excavation of earth will be done of size 500X500X1500 mm. |
| 105 | Concreting ratio 1:1.5:3(M-20 Grade) (500mmX500mmX2200mm) = 0.55Cu.mtr(Per Pole) |
| 106 | Couping ratio 1:1.5:3(M-20 Grade) with dimension (500X500X450)= 0.1125 Cu mtr(Per Pole) |
| 107 | Construction Earthing chamber including installation of earthing pipe.Making earthing chamber including excavation , soil treatment with bentonide powder , calculation of earthresistance, including Installation of 3Mtr GI Pipe 40mm/50mm including welding of Flat(GI)around pipe . |
| 108 | Supply and Erection of GI Fencing with Gate |
| 109 | Part-C:Construction of 1 nos of Guarding for Line Protecting on Single Pole for Road Crossing 20mtr |
| 110 | Guarding Channel(GI) 75x40x4.8 mm, 7.14 KG/Mtr., each Channel(GI) length 2.2 mtr., 4 no's Channel(GI) required =( 4x7.14x2.2) ( For Single Pole) |
| 111 | No-6 GI wire (0.192 kg/mtr.) for Main String |
| 112 | No-8 GI wire (0.131 kg/mtr.) for lacing |
| 113 | Eye Bolt (236mm, 16mm dia, 1.577kg/mtr.) |
| 114 | Gi Pipe Earthing 40mm. 3 Mtr. Long |
| 115 | 50x6mm Flat(GI) for earthing, 2.36kg/mtr., (10.7 mtr For raising)= 10.7x2.36 |
| 116 | Civil & Services |
| 117 | Construction Earthing chamber including installation of earthing pipe.Making earthing chamber including excavation , soil treatment with bentonide powder , calculation of earth resistance, including Installation of 3Mtr GI Pipe 40mm/50mm including welding of Flat(GI)around pipe . |
| 118 | Part-D Installation of 13mtr Pole for maintain height (as per consumer request) |
| 119 | 11 KV Cut Point with 90 Degree Angle |
| 120 | WPB (GI) Pole 160x152 (13Mtr. Long, 30.44KG/Mtr.)-DP (Total Pole Weight with Base Plate & Stiffner=395.72 KG+10.74 KG= 406.46 KG) |
| 121 | Straight Cross Arm 100X50X6mm, 9.56 KG/Mtr., each Channel(GI) length 1.2 mtr., 4 no's Channel(GI) required =( 4x9.56x1.2) |
| 122 | Fish Plate(GI) 50x6 mm., 2.36 kg/Mtr., each 0.280 mtr. length, 16 no's required = (16x2.36x0.280) |
| 123 | Straight Cross Arm 100X50X6mm, 9.56 KG/Mtr., each Channel(GI) length 0.306 mtr., 4 no's Channel(GI) required =( 4x9.56x0.306) |
| 124 | Danger Plate, 1 no's. |
| 125 | Back Clamp for danger Plate 25X3 mm. Flat(GI), 0.59Kg/Mtr. Flat(GI) of 0.510mtr length 1 no's = (1x0.59x0.510) |
| 126 | GI barbed wire anticlimbing device 3 Kg. Per support |
| 127 | Back Clamp for anticlimbing device 25X3 mm. Flat(GI), 0.59Kg/Mtr. Flat(GI) of 0.510mtr length 4 no's = (4x0.59x0.510) |
| 128 | 11 KV pin insulator polymer |
| 129 | H W fitting(B&S) 70KN, 3Bolt |
| 130 | Disc insulator (B&S) 70 KN polymer |
| 131 | Earthing of Support ( Coil Type ) |
| 132 | No-8 GI wire (Dia 4.6mm) 0.131 KG/ Mtr.- 2 Mtr. For connecting pole with Coil earthing |
| 133 | NON METALLIC TIES -11KV 55SQMM CVRD AAAC |
| 134 | IPC for 55 sq.mm AAA conductor (For covered conductor)-11kV |
| 135 | Spike (GI ) (using 50x6mm Flat(GI) welded with 8 mm square bar) ( 2 Nos of spike per Set in each Pole ) |
| 136 | H.T. Stay clamp, 50x8 mm. Flat(GI), 3.14Kg/Mtr., 0.551 Mtr. Length, 2 no's qty. required ( 1 Pair) |
| 137 | H.T. Stay set (Complete ) |
| 138 | H.T. Stay Insulator Type-C |
| 139 | 7/10 SWG Stay Wire 15kg /stay |
| 140 | GI Nut , Bolt & Washer of different sizes (7.433 Kg each Cut Pole) |
| 141 | Black Paint(GIS Numbering & Zebra Stripping) |
| 142 | Yellow Colour Paint(GIS Numbering & Zebra Stripping) for Background |
| 143 | Civil & Services |
| 144 | Fixing of complete 11KV line Complete stay set includes 1) Turn Buckle Assembly 2) Stay Rod & Stay plate 3) Stay Insulator 4) Stay Wire.5)Stay clamps with Nuts & bolts BA will do the excvation including excvation, supply of 0.5Cum cement concrete foundation 1:2:4 size ( 500mmx500mmx800mm) using 20mm BHG metal with all labour and material as per TPCODL Drawing & Standard. |
| 145 | Concreting ratio 1:1.5:3(M-20 Grade) (500mmX500mmX1800mm) = 0.45Cu.mtr(Per Pole) |
| 146 | Couping ratio 1:1.5:3(M-20 Grade) with dimension ( 500X500X450)= 0.1125 Cu mtr(Per Pole) |
| 147 | 11 KV Pin Points With WPB |
| 148 | WPB (GI) Pole 160x152 (13Mtr. Long, 30.44KG/Mtr.)-DP (Total Pole Weight with Base Plate & Stiffner=395.72 KG+10.74 KG= 406.46 KG) |
| 149 | 11 KV V cross Arm(GI) (10.2 K.g. each ) |
| 150 | Top bracket 100x50X6 mm GI Channel(GI) (2kg each) |
| 151 | Danger Plate, 1 no's. for each pole |
| 152 | Back Clamp for danger Plate 25X3 mm. Flat(GI), 0.59Kg/Mtr. Flat(GI) of 0.510mtr length 1 no's = (1x0.59x0.510) |
| 153 | GI barbed wire anticlimbing device 3 Kg. Per support |
| 154 | Back Clamp for anticlimbing device 25X3 mm. Flat(GI), 0.59Kg/Mtr. Flat(GI) of 0.510mtr length 4 no's = (4x0.59x0.510) |
| 155 | 11 KV pin insulator polymer, 3 Nos. required for each support |
| 156 | Earthing of Support ( Coil Type ) |
| 157 | No-8 GI wire (Dia 4.6mm) 0.131 KG/ Mtr.- 2 Mtr. For connecting pole with Coil earthing |
| 158 | GI Nut , Bolt & Washer of different sizes (1.45 Kg/ Pin Point) |
| 159 | Black Paint(GIS Numbering & Zebra Stripping) |
| 160 | Yellow Colour Paint(GIS Numbering & Zebra Stripping) for Background |
| 161 | NON METALLIC TIES -11KV 55SQMM CVRD AAAC |
| 162 | Spike (GI ) (using 50x6mm Flat(GI) welded with 8 mm square bar) ( 2 Nos of spike per Set in each Pole ) |
| 163 | Civil & Services |
| 164 | Concreting ratio 1:1.5:3(M-20 Grade) (500mmX500mmX1800mm) = 0.45Cu.mtr(Per Pole) |
| 165 | Couping ratio 1:1.5:3(M-20 Grade) with dimension (500X500X450)= 0.1125 Cu mtr(Per Pole) |
| 166 | Part-E Supply and Laying of 11kV 3C, 95sqmm UG Cable with spare 50mtr |
| 167 | Supply of materials for 11kV, 3Core, 95sqmm Aluminium, XLPE insulation UG Cable with accessories |
| 168 | Length of 11kV 3C, 95sqmm cable (HDD) |
| 169 | Supply of 11kV, 3Core, 95sqmm, XLPE insulation armoured UG cable (SC rating of cable in kA- 9kA and SC rating of Armour in kA- 9kA) |
| 170 | Supply of Outdoor termination kits Heat Shrinkable type suitable for 11kV, 3Core, 95sqmm, HT UG Cable kits |
| 171 | Supply of materials for High Density Polyethelene (HDPE) pipe 160mm diameter, PE 80- PN8 for laying of 11kV UG cable |
| 172 | Erection, Commissioning & Testing of 11kV new line by 3Core, 95sqmm, XLPE UG cable |
| 173 | Erection of Straight through jointing Kits/Outdoor termination kits/Indoor termination Kits Heat Shrinkable type suitable for 11kV, 3Core, 95sqmm, aluminium UG cable kits |
| 174 | Installation, Laying, Commissioning & Testing of 11kV, 3Core, 95sqmm, XLPE U/G cable by HDD method with HDPE pipe (160mm dia, PN8 PE80) including suply of HDPE Pipe. |
| 175 | Laying of 160mm dia PE 80-PN8, HDPE pipe inside open trench. |
| 176 | Civil works with supply of all materials like cement, MS tor rod, brick, coarse & fine aggregates and labour, T&P, etc for HT Cable Trench |
| 177 | Supply and Erection of Cable Route Marker along the cable route at an interval of 30mtrs with civil works |
| 178 | PART-F :- Installation of 11/0.4 KV, 250 KVA plinth mounted DSS-1 No |
| 179 | WPB (GI) Pole 160x152 (11Mtr. Long, 30.44KG/Mtr.)-DP(Total Pole Weight with Base Plate & Stiffner=334.84 KG+10.74 KG= 345.58 KG) |
| 180 | 9 Mtr. long 300 Kg. PSC Pole |
| 181 | Pole clamp for EYE hook for (XLPE Aerial bunched Cable) |
| 182 | EYE hook for XLPE Aerial bunched Cable |
| 183 | Dead End Clamp suitable for messenger XLPE Aerial bunched Cable |
| 184 | LT Cable raising Channel(GI) 75x40x4.8 mm GI Channel(GI) (1000 mm long)(7.14Kg./Mtr., 6 No's.) (Each 6x1.000x7.14= 42.84 Kg) |
| 185 | Top Channel(GI) GI 100 X 50 X 6 MM (3000 mm long) (9.56Kg./Mtr, 2 No's.) (Each 2x3.000x9.56= 57.36 Kg) |
| 186 | Fish Plate(GI) 50x6 mm., 2.36 kg/Mtr., each 0.280 mtr. length, 6 no's required = (6x2.36x0.280) |
| 187 | M.U Channel(GI) GI 75x40x4.8 mm (3000 mm long)(7.14Kg./Mtr., 2 No's.) (Each 2x3.000x7.14= 42.84 Kg) |
| 188 | AB Switch Mounting Channel(GI) 75x40x4.8 mm GI Channel(GI) (3000 mm long)(7.14Kg./Mtr., 2 No's.) (Each 2x3.000x7.14= 42.84 Kg) |
| 189 | AB Switch Side Support Channel(GI) 100X50X6mm,9.56 KG/Mtr., each Channel(GI) length 0.35 mtr., 2 no's Channel(GI) required =( 9.56x2x0.35) |
| 190 | Channel(GI) Support for down Pipe 75X40X 4.8mm., 7.14KG/Mtr., each Channel(GI) length 0.8 Mtr., 1 no's Channel(GI) required =( 7.14x0.8x1) |
| 191 | HG/ DO Fuse Mounting Channel(GI) 75x40x4.8 mm GI Channel(GI) (3000 mm long)(7.14Kg./Mtr., 2 No's.) (Each 2x3.000x7.14= 42.84 Kg) |
| 192 | Cantilever Support Channel(GI) 75x40x4.8 mm GI Channel(GI) (810 mm long,2 No's.) (7.14Kg./Mtr., 2 No's.) (Each 2x0.810x7.14= 11.57 Kg) |
| 193 | Cantilever Support Angle(GI) 50 X 50 X 6MM GI (1282 mm long) (4.5Kg./Mtr, 2 No's.) (Each 2x1.282x4.5= 11.54Kg) |
| 194 | Double Pole Belting Channel(GI) 75X40X 4.8mm., 7.14KG/Mtr., each Channel(GI) length 3.0 Mtr., 2 no's Channel(GI) required =( 7.14x3x2) |
| 195 | 50x50x6mm.GI Bracing Angle(GI), 4.5Kg./mtr., each Angle(GI) length 3.512 mtr., 2 nos Angle(GI) required = (4.5x3.512x2) |
| 196 | 50x6mm Flat(GI) for earthing, 2.36kg/mtr., (2.5x7 mtr. For mesh formation, 12 Mtr. For LA and 2.5 mtr. For raising, 11 mtr for AB switch, 2.8 mtr for HG Fuse, 5x2 mtr. for DTR Nutral, (1.3+4.5) mtr. For DTR Body, 0.500 mtr for LTDB & AB Switch operating handle, 3 mtr. for Fencing) ( Each 65.6x 2.36= 154.81 Kg) |
| 197 | 250 KVA , 11/ 0.4 KV (Cu) Transformer with Tap Changer BIS Energy Loss level II, Ammendment-4 |
| 198 | LT Distribution Box with MCCB, Aluminium Busbar for 3 Bay with kit kat fuse for 250 KVA S/S |
| 199 | 55 SQ.MM. AAAC XLPE Covered Conductor |
| 200 | 1 Cx 400 mm2 LT XLPE Cable(Un-Armoured) |
| 201 | LT Cable Supporting Channel(GI) 100 X 50 X 6 MM GI Channel(GI) (2000 mm long)(9.56 Kg./Mtr., 2 No's.) (Each 2x2x9.56= 28.56 Kg) |
| 202 | LT Cable Supproting Angle(GI), 50x50x6mm.GI 4.5Kg./mtr., each Angle(GI) length 2 mtr., 4 nos Angle(GI) required = (4.5x4x2) |
| 203 | Supply of 1.1kV, 4Core, 150 sqmm, XLPE insulation armoured -Aluminium UG cable from LTDB to Pole |
| 204 | AB Switch(11KV,200A.3pole,50Hz) |
| 205 | H.G.Fuse( 11KV.200A.3Pole) |
| 206 | WEDGE CONNECTOR FOR 55 SQMM.CONDUCTOR |
| 207 | POLYCARBONATE BIRD GUARD |
| 208 | Disc insulator (B&S)70 KN polymer |
| 209 | H W fitting (B&S)70KN(3bolted) |
| 210 | Lightning Arrester(12KV,10KA) Station Class 2 |
| 211 | 11KV pin insulator polymer |
| 212 | HT stay set complete |
| 213 | HT stay Clamp (1.9Kg/pair) |
| 214 | HT stay insulator TYPE-C |
| 215 | 7/10 SWG GI stay wire, Grade -2 (15Kg./ Set) |
| 216 | 40 mm Nominal bore GI pipe (medium gauge) earthing device with 3 mtr .Long |
| 217 | GI Nuts & Bolts of Assorted size (25 Kg/ DSS DP) |
| 218 | GI Barbed wire/Anticlimbing device (3Kg /Pole) |
| 219 | Back Clamp for anticlimbing device 25X3 mm. Flat(GI), 0.59Kg/Mtr. Flat(GI) of 0.510mtr length 8 no's = (8x0.59x0.510) |
| 220 | Danger plate 11kv |
| 221 | Back Clamp for danger Plate 25X3 mm. Flat(GI), 0.59Kg/Mtr. Flat(GI) of 0.510mtr length 2 no's = (2x0.59x0.510) |
| 222 | Name plate |
| 223 | Yellow Colour Paint(GIS Numbering & Zebra Stripping) for Background |
| 224 | Black Colour Paint(GIS Numbering & Zebra Stripping) for numbering |
| 225 | Civil & Services |
| 226 | Concreting ratio 1:1.5:3(M-20 Grade) (500mmX500mmX1800mm) = 0.450Cu.mtr(Per Pole) (For WPB Pole) |
| 227 | Couping ratio 1:1.5:3(M-20 Grade) (500mmX500mmX450mm) = 0.113Cu.mtr(Per Pole) |
| 228 | PCC ratio 1:3:6(M-10 Grade) For DSS Area (3.5X2.5X0.1)= 0.875 Cu. mtr. |
| 229 | Fixing of stay set with 0.5Cum cement concrete foundation 1:3:6(M-10 Grade) size ( 900mmx600mmx900mm) using 40mm BHG metal with all labor and material except stay set , stay wire , stay insulator . |
| 230 | Construction Earthing chamber including installation of earthing pipe.Making earthing chamber including excavation , soil treatment with bentonide powder , calculation of earthresistance, including Installation of 3Mtr GI Pipe 40mm/50mm including welding of Flat(GI)around pipe . |
| 231 | LTDB Plinth |
| 232 | DTR Plinth |
| 233 | Laying of 4 Cx 150 mm2 LT XLPE Cable |
| 234 | Laying of 1.1kV cable from 400 to 1000sqmm |
| 235 | SITC and Erection of GI Fencing with Gate |
| 236 | Concreting ratio 1:1.5:3(M-20 Grade) (500mmX500mmX1500mm) = 0.375Cu.mtr(Per Pole) (For PSC Pole) |
| 237 | Supply of AL Lugs suitable for 400 sq mm cable/conductor, Crimping with cable and Fixing/connecting include supply and erection of PVC Tape as per voltage requirement. |
| 238 | Supply of AL Lugs suitable for 150 sq mm cable/conductor, Crimping with cable and Fixing/connecting include supply and erection of PVC Tape as per voltage requirement. |
| 239 | Supply and erection of double Compression Flameproof Type Glanding for armored Cable 1C 300-1000 sqmm including making hole in Base plate and dressing of cable along with vermin proofing properly .Supply to be done as per TPCODL Spec and approved make dowells. |
| 240 | Supply and erection of double Compression Flameproof Type Glanding for armored Cable 3.5/4C 120-185sqmm including making hole in Base plate and dressing of cable along with vermin proofing properly .Supply to be done as per TPCODL Spec and approved make dowells. Approved for 240 ( Two Hundred fourty ) items only Please Enable Macros to View BoQ information |