| 1 | Clearing grass and removal of rubbish upto a distance of 50m outside the periphery area away from the work site as per pre measurement incuding all labour charges, T&P, B & O.C. Workers Cess etc. complete as directed by the Engineer-in-charge. |
| 2 | Earth work in excavation in ordinary soil including trimming the slopes and bed to the required section and depositing the excavated soil in canal banks or nearby filling reaches or spoil banks including breaking clods to maximum 5cm to 7cm size and laying in layers not exceeding 0.3m in depth with all leads, lifts & delifts, all labour charges, T&P, B & O.C. Workers Welfare Cess etc. complete as per the specification and as directed by the Engineer-in-charge. (Measurement shall be taken on finished level section) |
| 3 | Earth work in excavation of foundation in all kinds of soil including dressing and levelling the bed to required section, breaking clods to maximum 5 cm to 7 cm and depositing the excavated materials away from work site in layers not exceeding 0.3m in depth with all leads, lifts and delifts including dewatering, shoring, shuttering, etc. if required, all labour charges, T&P, B & O.C. Workers Welfare Cess etc. complete as directed by the Engineer-in-charge. |
| 4 | Filling in foundation and plinth and sides of structures with sand of approved quality including watering & ramming with all leads, lifts and delifts including cost, conveyance, royalty, EMF, DMF & Additional Charges taxes etc. of all materials, all labour charges, T & P, B & O.C. Workers Welfare Cess etc. complete as directed by the Engineer-in-Charge. |
| 5 | Cement concrete M-15 grade with 40 mm and down grade size crusher broken hard granite metal of approved quality free from weathered skin surface or any other deleterious materials, mixing and vibrating by mechanical means including hoisting and laying with all leads, lifts and delifts including cost, conveyance, royalty EMF, DMF & Additional Charges taxes etc. of all materials, all labour charges, providing weep holes and construction joints as per requirement, T&P, hire and running charges of all machineries, watering and curing, B & O.C. Workers Welfare Cess etc. complete as directed by Engineer in charge. |
| 6 | Cement concrete (1:2:4) with 12mm size hard granite crusher broken chips of approved quality free from weathered skin surface or any other deleterious materials with all leads, lifts & delifts including cost, conveyance, royalty EMF, DMF & Additional Charges taxes etc. of all materials, all labour charges, providing weep holes & construction joint as per requirement T&P, watering and curing, B & O.C. Workers Welfare Cess etc. complete as directed by the Engineer-in-charge. |
| 7 | Providing Form Work for concrete with F-1 finish for unexposed surfaces of structures with steel shutters rigidly fixed and removal of forms and making good to the surfaces where necessary complete with all labour, materials & T & P, B & O.C. Workers Welfare Cess complete as directed by the Engineer-in-Charge. Please Enable Macros to View BoQ information |