| 1 | Providing cost of situ 400mm dia double under reamed piles (6 Mtr. Long pile) drives to required depth below the ground levels as per specification with R.C.C. M-25 using 20mm size and downgraded hard crusher broken granite chips excluding cost of steel rod MS Rod as hall with CI core in RCC bore holes of required size including cost, carriage ,royality and all other taxes and labour charges etc. Complete as per direction of the Engineer-in-Charge. |
| 2 | Cement concrete M-25 using 20mm size hard crusher broken granite chips from approved quarry for road work free from weathered skin surface, dust and all other deleterious materials including cost, carriage, royalty and taxes of materials to the site of work and mixing by mechanical means with hoisting, laying concrete in position and compacting by late vibrator including curing upto required period etc. Complete as per direction of Engineer-in-Charge. |
| 3 | Providing weep holes in brick masonary/plain/reinforce concrete abutment, wing wall/return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of IV 20H towards drawing face including cost carriage & royalty of all materials etc. Complete as per direction of Engineer-in-Charge. |
| 4 | Rigid smooth centering and shuttering for RCC/CC work including false work and dismantling them after casting and removing the debris away from the working area and stacking the useful materials for reuse including cost, carriage, royalty and taxes of all materials with all labour to the site of work etc. Complete as per direction of the Engineer-in-Charge. (RCC Column, Beam) |
| 5 | Rigid smooth centering and shuttering for RCC/CC work including false work and dismantling them after casting and removing the debris away from the working area and stacking the useful materials for reuse including cost, carriage, royalty and taxes of all materials with all labour to the site of work etc. Complete as per direction of the Engineer-in-Charge. (RCC Slab) |
| 6 | Rigid smooth centering and shuttering for RCC/CC work including false work and dismantling them after casting and removing the debris away from the working area and stacking the useful materials for reuse including cost, carriage, royalty and taxes of all materials with all labour to the site of work etc. Complete as per direction of the Engineer-in-Charge. (WALL) |
| 7 | Labour charges for straighting, cutting, bending, binding and tying the grils and placing in position for fabrication and finishing of reinforcement including topping when necessary including supply of binding wire 18 to 20 gauge with all leads, lifts from binding yard including cost, carriage of un coated HYSD bar confirming to Fe 415 grade including over lapping, and wastage, welding etc. Complete as per direction of the Engineer-in-Charge. |
| 8 | Earth work in excavation of foundation in all kinds of soil by manual means/mechanical means with all leads, lifts & delifts including leveling and dressing the foundation bed upto design bed level and depositing the excavated earth away from the working area including breaking clods maximum 5cm to 7cm in size and laying in layers not exceeding 0.30mtr. in depth including bailing out water and dewatering if required etc. Complete as per direction of Engineer-In-Charge. |
| 9 | Filling foundation and plinth with sand including watering & ramming with all labour and T&Ps with all leads, lifts and delifts including cost carriage & royalty of all materials etc. Complete as per direction of Engineer-in-Charge |
| 10 | Cement concrete (1:3:6) using 4cm size hard granite crusher broken metal free from weathered skin surface of uniform colour and texture from approved quarry and approved quality conferming to specification, mixing by concrete mixture including hoisting and laying concrete in position with all leads, lifts, and delifts including cost conveyance, royalty and taxes of materials including dewatering by suitable means, supplying T&P quaring for specified period with hire and running charges of machineries required for the work, construction and maintenance of coffer dam and approach road if required till completion of work etc. Complete as per direction of Engineer-in-Charge. |
| 11 | Cement concrete (1:2:4) using 12mm size hard crusher broken granite chips/aggregate free from weathered skin surface of uniform colour and texture from approved quarry and approved quality conforming to specification mixing by concrete mixure including hoisting, laying concrete in position including cost, carriage, royalty and taxes of materials including dewatering by suitable means, supplying T&P quaring for specified period with hire and running charges of machineries required to the site of work with curing upto required period etc. Complete as per direction of Engineer-in-Charge. |
| 12 | Earth work in all kinds of soil from approved borrow areas except sand, sandy and slushy soil and transportation of excavated earth by mechanical /manual means with all leads, lifts and delifts including breacking clods maximum 5cm to 7cm and laying in layers not exceeding 0.30m in depth over the properly prepared surface including uprooting stumps with cost of hire and running charges of transport vehicle, T&P, royality and all other incidential charges etc. Complete as per direction of Engineer-in-Charge. (The earth should be arranged by the bidder at his own cost and royality will be deducted as applicable). Measurement will be taken on finished level section.) |
| 13 | Dismantling and removing of cement concrete under 3meter height including stacking the useful materials for reuse & removing the debrises far away from the working area within 50Mtr. with all leads, lifts & delifts etc. Complete as per direction of Engineer-in-Charge. Please Enable Macros to View BoQ information |