|
| 1 | Supply and installation of copper refrigerant piping of required sizes duly insulated with closed cell elastomeric insulation thickness asspecified by manufacturer,as per pipe size and cabling between indoor and outdoor complete with proper supports etc for following capacity unit. All related civil work such as making hole, chasing in wall, shall be inclusive in the quoted price. 1.8 TR WALL MOUNTED UNIT (3-Star Rated), R-32 Gas Inverter/Non Inverter |
| 2 | Communication cable between IDU & ODU For Split AC (2.5 Sq mm X 4 C) |
| 3 | Communication cable between IDU & ODU For Ducted AC (1.5 sq mm X 8 C) |
| 4 | To supply, install, test and commission PVC drain pipes duly insulated with 6 mm thick nitrile rubber and 'U ' traps from indoor units to nearest drain point. 32 mm dia |
| 5 | To supply, install, test and commission PVC drain pipes duly insulated with 6 mm thick nitrile rubber and 'U ' traps from indoor units to nearest drain point. 25mm dia. |
| 6 | Out door stand for Split Ac (pre fabricated) |
| 7 | Gas charging of VRF/VRV system with R410A refrigerant gas. Before gas charging system shall be flushed with high purity Nitrogen Gas to remove carbon content, dirt particles to make sure that there is no chance of mixing any impurity with Refrigerant Gas. Thereafter System shall be tested with Nitrogen Gas at 1.5 Times of working pressure of R410 Refrigerant Gas to ensure leakpro of system. Whole system shall be Vacuumed up to 500-micron level which ensures the zero-moisture content level in piping to ensure better cooling efficiency and long life of the system. All as per pre approved by Engineer in-charge. For additional technical parameters of products/ work , refer Annexure \\"A\\" attached with this BSR . |
| 8 | Supply & Fixing of FR PVC insulated & sheathed 3 core flexible copper conductor as per PWD specification for electrical Works confirming to IS:694 and as per IS 8130 : 2013 of 1.1 kV grade .Wire should be made from 99.99% purity copper, class 5 stranding in acc. to IEC 60228 for lower watt loss , oxygen free (<10 ppm) for less chances of oxidization and higher silver content for gives better conductivity , insulation PVC type A ,flame retardant as per IS 10810-53, better amperage rating as per VDE 0298 part 4 including making connection etc. as required. OEM Must have its own in house NABL lab setup for all testing facilities for wires. All as per pre approved by Engineer in charge, making connections. For additional technical parameters of products/ work , refer Annexure \\"A\\" attached with this BSR . 4 core x 2.5 Sq.mm |
| 9 | Supply, installation, testing and comissioning of interconnecting copper refrigerant piping of DHE Grade C12200- ASTM B68, B75, chemical composition of copper %- 99.0 Min and Phosphorus %- 0.015 to 0.040 . For Annealed copper tube :- Tensile strength = 210 Mpa wih elongation % = 40 Min . Ink Mark Brand Printing on Hard Tubes should be present. duly insulated with tubular elastomeric nitrile rubber FM/UL approved with high water vapor diffusion resistance and low thermal conductivity should be certified 'Class O' in Fire Propagation as per BS 476 Part 6 including chase cutting andfilling with mortar, Slotted channel supports mounted on 10 mm threaded rod at suitable spacing the exposed piping shall be wrapped with glass woven cloth and lag coating for vapour barrier and weather protection. Joints shall be covered with nitrile rubber tape of 3 mm thick complete as required of following sizes. All as per pre approved by Engineer in-charge. For additional technical parameters of products/ work , refer Annexure \\"A\\" attached with this BSR . 25 mm O.D., wall thinkness ≥ 1.2mm (insulation – 19 mm thick) |
| 10 | 19.1 mm O.D., wall thinkness ≥ 1.0mm (insulation – 13 mm thick) |
| 11 | 12.7 mm O.D., wall thinkness ≥ 0.8mm (insulation – 13 mm thick) |
| 12 | Providing & Fixing of IS : 4985 - 2000 Class -4 (10 Kgf / Sqcm) UPVC drain water piping with fittings (IS:7834 & 10Kgf/sqcm) like elbow, socket, Tee, solvent cement jointing, support with MS hanger on ceiling or recessed in wall with chasing & plastering with 6 mm thick closed cell elastomeric nitrile rubber insulation including leakage testing etc. as required of following Nominal sizes. All as per pre approved by Engineer in-charge. For additional technical parameters of products/ work , refer Annexure \\"A\\" attached with this BSR . 20 mm |
| 13 | 25 mm |
| 14 | 40 mm |
| 15 | Supply, Fixing and testing of following capacity ISO certified company made wall mounted stabilizer having output voltage variation from 200 V to 250 V(+/-5%) with input voltage variation from 170 V to 260 V, time delay facility from 2 to 4 minute and high cutoff at 270 V with providing of 16 Amp /20 Amp Industrial plug top making connection etc complete in all respect. All as per pre approved by Engineer in-charge. For additional technical parameters of products/ work , refer Annexure \\"A\\" attached with this BSR . 3 KVA |
| 16 | 4 KVA |
| 17 | 5 KVA |
| 18 | Making hole in stone masonary/ RCC wall/ RCC slab with core cutter for accomodating refrigerant pipe/ drain pipe/ MS pipe/ cables etc of following dia 50 mm dia per running inch length |
| 19 | 100 mm dia per running inch length |
| 20 | 150 mm dia per running inch length |
| 21 | 200 mm dia per running inch length |
| 22 | Providing and making wall openings in existing stone / Brick masonary partition wall complete with all requited T & P , Scafolding and providing lintel of required size and strength, repairing ,plastering and cleaning the site debrises as required. |
| 23 | Supply & fixing MS powder coated stand suitable for 1.0/1.5/ 2.0 Tr outdoor type of Split AC. All as per pre approved by Engineer in-charge. For additional technical parameters of products/ work , refer Annexure \\"A\\" attached with this BSR . |
| 24 | Dismantling of split air conditioner of any capacity/any type including existing indoor unit & outdoor unit , refrigerant piping , connecting cables , drain pipe etc. including shifting of dismentaled material to store complete as required |
| 25 | Supplying and charging of fresh refrigerant and testing of performance of air conditioner/ fridge/ water cooler of following capacity including capillary and strainer/ filter. 1.0 TR Window/ Split A.C. |
| 26 | 1.5 TR Window/ Split A.C. |
| 27 | 2.0 TR Window/ Split A.C. |
| 28 | 165 Ltr Refrigerator |
| 29 | Replacement of defective compressor by company repaired compressor as per OEM recommendations of following gadgets including testing etc. as required. Replacement of material or components shall be use as per guidelines of OEM of original product. All the scrap material should be retained by the contractor. 1.0 TR A.C. |
| 30 | 1.5 TR A.C. |
| 31 | 2.0 TR A.C. |
| 32 | 165 Ltr Refrigerator |
| 33 | 200/210 Ltr Refrigerator |
| 34 | 280/310 Ltr Refrigerator |
| 35 | P & Replacement of condensing/ cooling coil of copper fins for following capacity A.C./ Water cooler/ Fridge as required. Replacement of material or components shall be use as per guidelines of OEM of original product. All the scrap material should be retained by the contractor. 1.0 TR A.C. |
| 36 | 1.5 TR A.C. |
| 37 | 2.0 TR A.C. |
| 38 | 165 Ltr Refrigerator |
| 39 | Servicing of 1.0/1.5/2.0 TR capacity Split/ Window type air conditioner |
| 40 | P & Replacement of overload protection of A.C./ Water cooler as required. Replacement of material or components shall be use as per guidelines of OEM of original product. All the scrap material should be retained by the contractor. |
| 41 | P & Replacement of thermostat of A.C./ Water cooler/fridge as required. Replacement of material or components shall be use as per guidelines of OEM of original product. All the scrap material should be retained by the contractor. |
| 42 | P & Replacement of selector switch of 1.0/1.5/2.0 TR A.C Fan as required. Replacement of material or components shall be use as per guidelines of OEM of original product. All the scrap material should be retained by the contractor. |
| 43 | P & Replacement of starting relay of A.C/water cooler/fridge compressor as required. Replacement of material or components shall be use as per guidelines of OEM of original product. All the scrap material should be retained by the contractor. |
| 44 | P & Replacement of door liner of 165/200 Ltr. Fridge as required. Replacement of material or components shall be use as per guidelines of OEM of original product. All the scrap material should be retained by the contractor. |
| 45 | P & Replacement of door gasket of 165/200 Ltr. Fridge as required. Replacement of material or components shall be use as per guidelines of OEM of original product. All the scrap material should be retained by the contractor. |
| 46 | S & F of capacitor of 230V/ 275V, 50Hz rating of plastic casing and terminals -Lugs or copper wire. Running capacitor 2.5/3.15 micro farad |
| 47 | 4.0 micro farad |
| 48 | 6.0 micro farad |
| 49 | 8.0 micro farad |
| 50 | Starting capacitor 40-60 micro farad |
| 51 | 60-80 micro farad |
| 52 | 80-100 micro farad |
| 53 | 120-150 micro farad Please Enable Macros to View BoQ information |