|
| 1 | Item Rate BoQ BoQ_Ver3.0 Item Rate Normal INR Only INR Select, Excess (+), Less (-) Less (-) Tender Inviting Authority: Executive Engineer, Mechanical & Hospital Division GMCH Jammu. Repair and Servicing of Split Air Conditioner Units installed at different locations of Govt. Super Specialty Hospital, Jammu. MHDJ/e-NIT 32 of 2026-27 Dated: 05.05.2026 Due : 14.05.2026 Bidder Name : PRICE SCHEDULE(This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name and Values only ) NUMBER # TEXT # TEXT # NUMBER # TEXT # NUMBER NUMBER TEXT TEXT # NUMBER # TEXT# TEXT # NUMBER # NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER # NUMBER # TEXT TEXT NUMBER # NUMBER # DATE NUMBER # NUMBER # TEXT # Sl.No. Item Code / Make Quantity Units Estimated Rate Addition / Deduction Rate including GST to be quoted by the bidder Rs. P Currency Convertion against each Item Quoted Currency in INR / Other Currency Rebate on old parts in Percentage (%) if any Excise Duty VAT Freight Charges ( Unloading & Stacking) Any Other Taxes/Duties/Levies Other Taxes 2 IIIrd Party i.e DGS&D / RITES etc Inspection Charges @0.34%+Service Tax Less for Cenvat Credit,if any respect of Supplies Under full Excise Duty Category Net Cost of item Rs. P TOTAL AMOUNT TOTAL AMOUNT With Taxes TOTAL AMOUNT In Words |
| 2 | Complete servicing of indoor and outdoor units of Air Conditioner by way of servicing using jet pressure pump and water jacket with proper chemical/water to remove unwanted dust/debris completely from evaporator and condensing coil of the indoor and outdoor unit respectively and also complete washing of air filters(complete wet servicing) and drainage line cleaning etc for three times in the summer season at periodic interval as per requirement .The complete job includes cost of material ,tool and tackle charges, all labor (skilled and unskilled) ,handling and transportation charges including cost on account of technician for attending the complaints as and when required and its rectification during defect liability period and taxes etc. |
| 3 | Refilling of specified refrigerant as per the models of the Ac’s in air conditioners after rectification of leakages in copper piping circuit with the help of copper brazing. The complete job includes cost of material, all labor (skilled and unskilled) handling and transportation charges and taxes etc |
| 4 | Replacement of defunct PCB’s by way of dismantling the old damage PCB and fitting of new PCB. The complete job includes cost of material, all labor charges (skilled and unskilled), handling and transportation charges and taxes etc |
| 5 | Replacement of defunct capacitors by way of dismantling the old damaged capacitor and fitting of new capacitor. The complete job includes cost of material, all labor charges (skilled and unskilled),handling and transportation charges and taxes etc |
| 6 | Replacement of defunct scroll compressor of air conditioner 2 ton capacity by way of dismantling the old damaged compressor and installation of new compressor. The job includes cost of fitting of cap and filter. The complete job includes testing of air conditioner after installation of compressor. The complete job includes cost of material, all labor charges (skilled and unskilled), handling and transportation charges and taxes etc |
| 7 | Replacement of fan motor of outdoor unit of air conditioner. The complete job includes cost of material, all labor charges (skilled and unskilled), handling and transportation charges and taxes etc. |
| 8 | Replacement of defunct condenser coil by way of dismantling the old damaged condenser coil and fitting of new condenser coil. The complete job includes cost of material, all labor charges (skilled and unskilled),handling and transportation charges and taxes etc |
| 9 | Replacement of damaged copper pipe by way dismantling the old damaged copper pipeline and laying of new copper pipeline. The complete job includes cost of material, all labor charges (skilled and unskilled),handling and transportation charges and taxes etc |
| 10 | Replacement of damaged PVC drain pipes by way of providing and fitting of new drain pipe afer cleae the choking.The job includes providing of Clamps, PVC gutties, wood screw, tape rolls, as per site requirement etc. for proper installation of drain pipe. The job includes installation, labour and transportation and taxes etc Total in Figures 23 23 0.0 23 INR Zero Only Quoted Rate in Figures Select 0.0 0.0 Zero Only Quoted Rate in Words INR Zero Only Please Enable Macros to View BoQ information |