| 1 | Repairing of leakage in existing Distribution/Rising Main/Transmission Main AC/PVC/HDPE pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including taking out the burst pipe from trench, dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material, tightening of CID Joints to make repair leak proof and then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers. for entire job contractor will use his own T&P & labour and will arrange transportation of material required from Jen store. (Required material such as pipe piece, CID Joints shall be provided by Department free of cost) |
| 2 | In all type Soil AC/PVC/HDPE pipe |
| 3 | 50/63/75mm |
| 4 | 80/90mm |
| 5 | 100/110mm |
| 6 | 125/140mm |
| 7 | Repairing of leakage in existing Distribution/Rising Main/Transmission Main CI/MS/DI pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at at site of work including taking out the burst pipe from trench, dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material, tightening of CID Joints to make repair leak proof and then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers. for entire job contractor will use his own T&P & labour and will arrange transportation of material required from Jen store. (Required material such as pipe piece, CID Joints shall be provided by Department free of cost) |
| 8 | In all type Soil |
| 9 | 100mm |
| 10 | 150mm |
| 11 | Replacement of CI/ DI Double flange sluice valves,non return valves,butter fly valves etc. in existing Distribution/Rising Main/Transmission Main pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including providing and fixing MS Nut and Bolt and rubber gasket, dewatering and providing adequate safety arrangement at site and then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers for entire job contractor will use his own T&P & labour and will arrange transportation of required material from store. (Required material such as Valve, Tail piece, CID Joints etc. shall be provided by Department free of cost) |
| 12 | In all type Soil |
| 13 | 80 mm |
| 14 | 100 mm |
| 15 | 125 mm |
| 16 | 150 mm |
| 17 | Restoration of cement concrete road including making of pit in regular shape, ramming and consolidation of surface, laying, positioning and compacting cement concrete ( M-20 ) minimum thickness 200 mm upto the satisfaction of engineer incharge. The rate includes the making of pit in regular shape, all labour, material and T&P charge complete job. |
| 18 | Unlowering of submersible pump set along with lowering pipes with depth up to 120 mtr and submersible cable with safety from tube well, checking the pump set, transportation of pump set from tube well site to store as direction, receiving repaired / new pump set from store/ divisional store , testing the same, transportation to site and lowering back into tube well along with submersible cable, lowering pipes, specials etc and commissioning of the tube well. The job also includes cable jointing, checking of discharge of pump set, interconnection of lowering pipe from nearby distribution pipe line, checking of starter and reporting for completion of Job or fault/problem if any. (Upto 20 Km distance run by lowering machine) |
| 19 | For three Phase pump set |
| 20 | G.I. Double Flanged Pipe Lowering Assembly of nominal dia |
| 21 | 50 mm |
| 22 | Repair Rewinding of Submersible motor includes full servicing and rewinding (wherever required) as per manufacturer's specification and to the satisfaction of Engineer Incharge. It includes the replacement of minor parts such as bushes (oil seal bush) Nut Bolts, washers, cable seal, gland ring, vent plug, water drain plug, etc. complete job |
| 23 | Above 7-5 HP to 10 HP V-6 |
| 24 | Above 10 HP to 12.5 HP |
| 25 | Particulars of spare parts of submersible Motor |
| 26 | Providing & Replacement of G.M./S.S. Bushes for all types of motors (per set of 4Nos.) including cost of sleeves |
| 27 | Providing & Replacement of thrust bearing for all types of motor. It includes cost of all components connected with thrust bearing. |
| 28 | Replacement of thrust plate for all types of motors |
| 29 | Motor opening cable jointing & refitting charges when rewinding is not required. |
| 30 | Supply and fixing spare parts for repair of pump set including cost of opening refitting, servicing, and machining, if required. It also includes the cost of nut bolt, studs, washer packing, keys etc. complete. |
| 31 | Providing & fixing of GM neck rings parts on impeller. |
| 32 | Plain Type V-6 |
| 33 | Providing & Fixing of GM/SS bush per piece |
| 34 | Plain Type V-6 |
| 35 | Providing & replacement of Nylon Impeller |
| 36 | Plain Type V-6 |
| 37 | Providing & fixing CI Diffuser/ guide vans per piece |
| 38 | Providing & fixing Gun metal Diffuser/ guide vans per piece |
| 39 | Providing & fixing Nylon Diffuser/ guide vans per piece |
| 40 | Providing & fixing Microlone Guide per piece |
| 41 | Providing & fixing of CI body per piece |
| 42 | Plain Type V-6 |
| 43 | Pump opening & fixing including machining & all finishing work for desired performance |
| 44 | Plain Type V-6 |
| 45 | Supplying of MS Rods and Chuck Nut (Complete Set) for different sizes of sluice valve and should be supplied as according to size of Check Nut including material for the following sizes. |
| 46 | Sluice Valve Size 80mm |
| 47 | Sluice Valve Size 100mm |
| 48 | Sluice Valve Size 125mm |
| 49 | Labour charges for removing electric fault in wiring / making connection through lugs (with the help of cramping tool) of motor pump set with starter at headworks of water supply scheme/Tubewell/ openwell including cost of insulation tape etc.. |
| 50 | Labour charges for replacement of defective ampere meter / volt meter with new one on existing panel board in pump house./Tubewell /openwell (new voltmeter/ampere meter will be provided by department |
| 51 | Labour charges for repairing of starter at site including opening and reassembling of starter with labour charges for replacing of defective parts with new one at site.(Parts will be supplied by Depatment) |
| 52 | 5 to 15 HP. |
| 53 | Labour charges for repairing of soft starter at site including opening and reassembling of starter with labour charges for replacing of defective parts with new one at site.(Parts will be supplied by Depatment) |
| 54 | 5 to 15 HP. |
| 55 | Supply & filling starter oil in oil immersed starters at site. Please Enable Macros to View BoQ information |