| 1 | Earth work cutting in ordinary soil up to 1.5 m lift &30m led with all complete work (S.I.No.253) |
| 2 | Earth work cutting/Filling of embankment lead 30 m and up to 1.5 m lift with all complete work (S.I.No.253) |
| 3 | PCC 1:6:12 cement sand and 40mm brick ballast and all compelte the work (s.I.No.-273) |
| 4 | M-150 brick work (1:4) cement sand mortor including all complete work (S.I.No.303) |
| 5 | M-150 brick work (1:4) cement sand mortor including all complete work (S.I.No.303) |
| 6 | 12mm thick cement plaster in 1:4 etc all complete work |
| 7 | Struck Pointing (1:2) cement sand mortor including all complete work (S.I.No.574) |
| 8 | Flush pointing (1:2) cement sand mortor including all complete the work (S.I.NO.575) |
| 9 | 100mm dia PVC Pipe for drainage system etc all complete work |
| 10 | R.CC work (1:1.5:3) with cement course sand &20mm the stone grit including all complete work (S.I.No.279B) |
| 11 | M.S iron work including cutting bending and praper laying all complete work (S.I.No.504) |
| 12 | P/L of 7.50cm compacted layer of WBM Grade-3 with (22.40-53) mm ballast and stone screening type -B (dala gritt 11.20mm) including water charge and consolidation all complete of work |
| 13 | Providing&Applying of tack coat at the rate of 0.25kg/sqm includig material laboured all complition of work |
| 14 | Providing & Laying D.G.B.M.-50mm thick with 100-120TPH hot mix plant producing an average out put 75 tones per hour using crushed of aggregates of specified grading and premixed with bitumen VG-30 grade bluk @3.40% of weight of mix and including all completion of work as per MORT 7 Hspecification-504 |
| 15 | Providing & Laying B.C-30 mm thick with 100-120TPH hot mix plant producing an average out put 75 tones per hour using crushed of aggregates of specified grading and premixed with bitumenC.R.M.B bluk55grade @5.00% of weight of mix and including all completion of work as per MORT & Hspecification-508 |
| 16 | Providing &laying of Rubber molded reflective Zig-Zag 80 mm thick Interlocking tiles of precast compressive strength I.S.I marked. In gray based Including joints filled and bedding 5cm. With local sand leveling dressing of surface required level &slop and also including all materail labour T&p loading unloading stacking cartage and all taxes required for proper completion of work as per MORD specification No.1500 |
| 17 | Construction of Granular Sub base (G.S.B) by providing closed graded material mixing by mix in place method including water and compacting with vibratory rollers as per MORT& H specification401 |
| 18 | Cement Concrete work (1:1.5:3) with cement course sand &20mm the stone grit including all complete work |
| 19 | Cartage of earth upto 5 km. distance from site with all complete work. |
| 20 | Laying of 100 micron polythelene under the foundation & floor for anti saltpeter treatment i/c supply of all materials, labour T&P required for proper completion of the work New item |
| 21 | Head Load material in unloaded distance from the side etc all complete work Please Enable Macros to View BoQ information |