| 1 | Material & Labour for dressing of ground by cutting / removing vegetation, scrapping, clearing of all grass, shrubs, bushes, weeds, trees and saplings in entire SYL area (SYL phase I and II) by deploying jungle jims and tractors with operators including fuel, lubricant,required T &P etc complete all as specified and directed.Notes:-(i) 01 No. jungle jim, 01 No. tractor, with operator shall be measured as one unit with strict compliance supported with attendance/ log sheet duly signed by contractor and Engr in charge .(ii) Cut grass/bushes/vegetation, etc of any size and type of grass and vegetation shall be removed inside or outside SYL area and/ or any other area of installation as directed. (iii) If any of the above points are not followed then the penalty Rs 100/- per hour will be levied from the contractor. |
| 2 | Material & Labour for dressing of ground by cutting / removing vegetation, scrapping, clearing of all grass, shrubs, bushes, weeds, trees and saplings in entire SYL area (SYL phase I and II) by operator with bush grass cutter, 01 No. bush grass cutter with 01 operator including fuel, lubricant, etc will be provided by contractor complete all as specified and directed.Notes:-(i) Cut grass/bushes/vegetation, etc. of any size and type of grass and vegetation shall be removed inside or outside SYL area and/ or another area of installation as directed by Engr in charge.(ii) 01 No. bush grass cutter with 01 operator with, fuel and all machinery will be provided by contrator at no extra cost basis with strict compliance supported with attendance/ log sheet duly signed by contractor and Engr in charge (iii) If any of the above points are not followed then the penalty Rs 100/- per hour will be levied from the contractor. |
| 3 | Material and labour for draining out water completely from the Gravity sand filter bed-01 Nos, at SYL-I , removing the gravel/boulders, sand, silt, dirt etc from the filter beds and old unused gravel and sand shall be thrown out not exceeding 500 mtr, scrapping all the inner walls and bottom of the tanks by scrubbing with steel wire brush, washing with clean water and applying two coats of white lime wash on all internal and external surfaces of the bed, complete all as specified and directed. |
| 4 | Material and labour for draining out water completely from the Gravity sand filter bed-01 Nos, at SYL-II , removing the gravel/boulders , sand, silt, dirt etc from the filter beds and old unused gravel and sand shall be thrown out not exceeding 500 mtr, scrapping all the inner walls and bottom of the tanks by scrubbing with steel wire brush, washing with clean water and applying two coats of white lime wash on all internal and external surfaces of the bed, complete all as specified and directed. |
| 5 | Material and labour for round boulder/gravel layer of 300 mm thick of approved quality of size 40-50 mm or as per IS 8419 (Part 1) in filter bed unit and including taking out old unsv material complete all as specified and directed. |
| 6 | Material and labour for round gravel layer of 500 mm thick of approved quality of size 3.15mm to 10mm or as per IS 8419 (Part 1) in filter bed unit and including taking out old unsv material complete all as specified and directed. |
| 7 | Material and labour for silica sand of 750mm thick layer above the gravel, effective size of sand should be 0.45mm to 0.70mm, specific gravity of 2.55 to 2.65 and uniformity coefficient 1.3 to 1.7 in filter bed unit at SYL of approved quality and including taking out old unsv material complete all as specified and directed. |
| 8 | Taking down the Air scour Rotary twin-lobe blower/compressor 1000cum/hr @ 4000mmWC from the foundation and shifting it to local workshop approved by accepting officer and filling the lub oil of Servo system 320 of IOC and ENCLO-320 of HPCL-03 ltrs and transporting back to SYL plant and refixing at the same place including connecting all electrical connections and testing complete all as specified and directed. Note : (a) Spare parts required shall be measured and paid separately as supply only under the respective items. |
| 9 | Material and labour for replacement of pressure relief valve and pressure gauge complete all as specified and directed. |
| 10 | Material and labour for replacement of suction filters complete all as specified and directed. |
| 11 | Material and labour for replacement of suction silencer complete all as specified and directed. |
| 12 | Material and labour for replacement of discharge silencer complete all as specified and directed. |
| 13 | Material and labour for replacement of V belts complete all as specified and directed. |
| 14 | Material and labour for replacement of coupling complete all as specified and directed. |
| 15 | Material and labour for replacement of pulley complete all as specified and directed. |
| 16 | Material and labour for replacement of anti vibration pad complete all as specified and directed. |
| 17 | Material and labour for replacement of shaft complete all as specified and directed. |
| 18 | Material and labour for replacement of bearings complete all as specified and directed. |
| 19 | Material and labour for replacement of gear drive complete all as specified and directed. |
| 20 | Disconnecting all electrical connections from electric motor 22KW/30HP and decoupling from air scour rotary twin blower and dismantling from foundation and transporting to local workshop approved by Accepting Officer for opening the motor taking out of burnt winding and thorough cleaning of the slotes, rewinding the complete motor with supper enamaled copper wire of same size and provn of supper quality insulating materials, warnishing and drying and taking back from wksp including lathe and other any type of machine work such as rotor work, welding, metalling, machining and grinding for bearing sheet etc and mounting, connecting all electrical connections alongwith reassembling pump set and testing complete all as specified and directed. |
| 21 | Dewatering sludgy water from the clariflocculator of size 20m diax 5m deep by means of diesel engine or pump including disilting, cleaning of clariflocculator, alum mixing chamber, aerator and its connected drain and taking out sludge in form of solid manually and getting out minimum of 500m distance and buried the same in low lying area. Tank should be cleaned at least twice times during the contract period , also mention the date of cleaning on the tank and cost shall be paid to the contractor each time of cleaning ,complete all as specified and directed. Note :(a) Spare parts required shall be measured and paid separately as supply only under the respective items |
| 22 | Welding of angle iron 40 x 3mm size complete all as specified and directed |
| 23 | Material and labour for replacement of shaft of 5 HP pump set as per existing complete all as specified and directed |
| 24 | Material and labour for replacement of bearings of 5 HP pump set as per existing complete all as specified and directed. |
| 25 | Material and labour for replacement of gear box drive of 5 HP pump set as per existing complete all as specified and directed |
| 26 | Dewatering the sludge tank of capacity 0.6 LG by any means and removing the mud, silt, dirt etc from tank with the help of sludge motor/manually and scrapping all arround the inner wall and bottom of the tank by scrubbing with steel wire brush, washing with clean water and applying two coats of white lime wash on the internal surface of the tank Sludge pump set shall be provided by the contractor and tank should be cleaned at least twice times during the contract period and cost shall be paid to the contractor each time. also mention the date of cleaning on the tanks ,complete all as specified and directed. |
| 27 | Dewatering the Raw water sump of capacity 0.7 LG by any means and removing the mud, silt, dirt etc and scrapping all arround the inner wall and bottom of the tank by scrubbing with steel wire brush, washing with clean water and applying two coats of white lime wash on the internal surface of the tank complete all as specified and directed by Engr-in-Charge.Note: Raw water tank will be available for cleaning 4 to 6 hrs everyday.Sludge pump set shall be provided by the contractor and tank should be cleaned at least twice times during the contract period and cost shall be paid to the contractor each time, also mention the date of cleaning on the tanks ,complete all as specified and directed. |
| 28 | Disconnecting all electrical connections from sludge motor of 10 HP, dismantling and transporting to local workshop approved by Accepting Officer for opening the motor taking out of burnt winding and thorough cleaning of the slotes, rewinding the complete motor with supper enameled copper wire of same size and provn of supper quality insulating materials, varnishing and drying and taking back from wksp including lathe and other any type of machine work such as rotor work, welding, metalling, machining and grinding for bearing sheet etc and transporting back to SYL, mounting, connecting all electrical connections alongwith relowering into the sludge tank and testing complete all as specified and directed. |
| 29 | Material & Labour for Mild steel framed works such as grills, gratings etc with ends of bars, shouldered and/or rivetted, or forged into spikes, framed guard bars; barred iron doors; ladders; framed balusters; walk ways; railings; frame works of water tank and similar work confirming to Fe.290.Gde-E-165 including nuts, bolts, washers, welding, binding, cold or hot, drilling holes for bolts, in any shape or size inclusive of one primer coat, one under coat and one finishing coat of paint including taking down existing complete all as specified and directed. |
| 30 | Removing of bushes/shrubs, small trees, vegetation growth of any type / size upto the bottom of raw water tank approx 10 mtr slant height for Tank No 01, taking out debris and grass growth from the Raw water tank including using round up chemicals for killing/drying the bushes/weeds/shrubs etc. and removal of the same to a distance not exceeding 500mtr including making good all the surface of raw water tank upto the entire gravitation system complete all as specified and directed. |
| 31 | All as per Srl Item no. 15.00 here in before but for Tank No. 2 complete all as specified and directed |
| 32 | All as per Srl Item no. 15.00 here in before but for Tank No. 3 complete all as specified and directed |
| 33 | All as per Srl Item no. 15.00 here in before but for Tank No. 4 complete all as specified and directed |
| 34 | Notes for Ser item No 15.00 to 18.00:-a) Please note that at one stage only One tank shall be provided for cleaning. b) Contractor shall provide boat & safety equipment during taking out the debris from water surface without dewatering the raw water tanks. c) Water supply should not be affected during cleaning of debris from raw water tank. d) Cleaning of Raw water tank and above mentioned area should be done atleast twice during the period of CA & each time Cost to the same will be paid to contractor. |
| 35 | Disilting, cleaning (debris and grass growth of any type/ size) and removal of mud from canal of appx 1100 mtr taking out mud debris grass growth and any type of silt etc complete all and removal to a distance not exceeding 500mtr including making good all the bottom surface of canal .Canal should be cleaned every month during the contract period and cost shall be paid to the contractor each time complete all as specified and directed. Note :- Regular cleaning of canal each month is compulsory if not executed then a penalty of Rs 10000 per month will be imposed on the contractor. |
| 36 | Complete removal of the wild grass/ vegetation from surrounding area of OHTs, Tubeswells/Boosters and installations area such as booster 1, booster 43, OHT 31, OHT 35, OHT 2, OHT 4, OHT 14 , OHT 10, OHT 10a, OHT-18,OHT 48 and making the surface clear, removing the silt / mud if required and plain and complusory spraying roundup chemical on the same clean area as directed after removing and depositing the same at a distance not less than 50 mtr away from the site complete all as specified and directed. Note- All necessary T&P will be provided by the contractor and no extra amount will be paid for that seperately. |
| 37 | Demolition of brick work built in cement mortar incl all quoins, arches, pillars, in any situation etc complete all as specified and directed. |
| 38 | Material and labour for brick work with sub class 'B' bricks straight or curved on plan exc 6 m mean radius built in CM 1:6 complete all as specified and directed. |
| 39 | Demolition of Concrete in ground floors and pavings n exc 15 cm thickness (below or above ground level) complete all as specified and directed |
| 40 | Material and labour for vibratory compacted, precast cement concrete rubber moulded, colored (except grey color), interlocking designer paver blocks in Milano shape, conforming to IS-15658-2006 of 60mm thickness, M-35 grade, as in path, hard standing, etc. including surface excavation over area n.exc 30cm deep and averaging 15cm deep and getting out in soft/loose soil and removing excavated soil exc 50mtr but not exceeding 250mtr, including demolition of existing paver blocks and earth work complete all as specified and directed. |
| 41 | Material and labour for cement concrete 75mm thick PCC 1:4:8 type D2 using 40mm graded crushed stone aggregate complete all as specified and directed. |
| 42 | Material and labour for sand cushioning 25mm compacted complete all as specified and directed. |
| 43 | Preparation of old surfaces of CI/DI/GI pipe 300 to 20 mm bore by removing old paint and applying two coats of synthetic enamel paint on all external surfaces of CI/DI pipe for rising supply, overflow and washout 100mm bore vertical length including necessary scaffolding and other arrangement required for painting complete all as specified and directed. |
| 44 | Material & Labour for scraping the existing paint by using wire brushes and sand paper etc and preparing the external surfaces and applying two coats of cement base paint on OHT/UG sump at height of 20-25 mtr or at any other surface complete all as specified and directed. |
| 45 | Dismantling of floor or wall tiling/ kota stone/ dholpur stone/checked tile /ceramic tile including cement mortar bedding and removing the rubbish outside the defence land complete all as specified and directed. |
| 46 | Dismantling plain or corrugated mild steel sheeting any gauge, thickness, including Nanital or similar pattern roof covering, complete all as specified and directed. |
| 47 | Material and labour for pre-painted galvalume aluminium zinc coating GI based corrugated mild steel sheeting 0.50 mm thick of any colour having tensile strength of 550 Mpa as in roof covering / cladding and fixed with self tapping screws, complete all as specified and directed. |
| 48 | Material and labour for Dholpur stone cladding gang saw cut with machine cut edges, uniform colour of each stone size exceeding 0.25 sqm area and not exceeding 0.5 sqm fixed with and including one number SS clamps (grade -202) of flat 30mm X 2mm, 150mm long made to shape in each slab, making 'V' groove at top and bottom of stone and drilling hole for hold fastener, polishing, rubbing & including silicon treatment complete all as specified and directed. |
| 49 | Material and labour for retro reflector board of size 4'x3' with high quality retro reflector tape green base high intensity prismatic sheeting (HIP) grade white retro tape cutting good quality with 3mm thick ACP sheet base including 40mm x 40mm square size MS pipe legs and all around the board appx 18 feet incl welding the MS flat plate of size 25mm x 3mm across the board appx 10 feet including grouting the sign board in PCC 1:2:4 and dismantalling the UNSV sign board in Sector 'C' from different pump house area complete all as specified and directed. |
| 50 | Material & labour, jointing and testing for replacement of existing size with pre-insulated multi stranded copper conductor flat of size 10 sqmm, 3 core submersible cable and connected with suitable and required thimbles and nut bolts to panels and Booster pump complete all as specified and directed. |
| 51 | All as per Srl Item No 34.00 here in before of size 6 sqmm 3 core. |
| 52 | Taking down, opening and repair of existing pump set up to 5 HP with gear box provided with pulley and two nos of belts taking it for repair to workshop, making the same functional including installation back at existing location testing and making electrical connections , complete all as specified and directed.Note :(a) Spare parts required shall be measured and paid separately as supply only under the respective items (b) Make of spare parts shall be same as of existing pump set. |
| 53 | Supply only shaft bush pump suitable upto 5 HP complete all as specified and directed |
| 54 | Supply only ball bearing suitable for pump upto 5 HP complete all as specified and directed |
| 55 | Supply only impeller complete all as specified and directed |
| 56 | Supply only metal coupling complete all as specified and directed |
| 57 | Supply only gearbox complete all as specified and directed |
| 58 | Supply only belts complete all as specified and directed. |
| 59 | Supply only stainless steel shaft keys complete all as specified and directed |
| 60 | Material and labour for replacement of MCCB 160 Amp, 4 pole, 16 KA, complete all as specified and directed |
| 61 | All as per Srl Item No 37.00 here in before but for cap 100 amps. |
| 62 | Material and labour for replacement of Ammeter as per existing size, 0-200 Amp digital type with CT complete set complete all as specified and directed. |
| 63 | Material and labour for replacement of volmeter as per existing size, 0-500 Amp digital type with PT complete all as specified and directed |
| 64 | Material and labour for replacement of defective aluminium bus bar(set of four) of rating upto 400 Amps including nut , bolts, washers, etc complete all as specified and directed. |
| 65 | Material and labour for replacement of defective phase indicators (set of three red, green & yellow) of ratings 240 volts, single phase complete all as specified and directed. |
| 66 | Material and labour for repairs to panels by replacing broken hinges, thimbles of suitable size ,corroded nut, bolts etc including welding, drilling, cuttings etc complete and painting the panel by preparing the surfaces, applying two coat of synthetic enemelled paint, including making danger mark & supply and fix aluminium busbar set of four of suitable amperage as per requirement etc complete all as specified and directed. |
| 67 | Material and labour for replacement of DOL starter suitable for upto 05 HP pumpset complete all as specified and directed |
| 68 | Disconnecting all electrical connections from electric motor upto 5 HP and decoupling from pump and dismantling from foundation and transporting to local workshop approved by Accepting Officer for opening the motor taking out of burnt winding and thorough cleaning of the slotes, rewinding the complete motor with supper enamaled copper wire of same size and provn of supper quality insulating materials, varnishing and drying and taking back from wksp including lathe and other any type of machine work such as rotor work, welding, metalling, machining and grinding for bearing sheet etc and mounting, connecting all electrical connections alongwith reassembling pump set and testing complete all as specified & directed. |
| 69 | Material & Labour for PCC 1:3:6 type C1 (using 20 mm graded crushed stone aggregate) for filling of road/path cutting etc complete all as specified and directed |
| 70 | Material & Labour for Mild steel, plain, black sheet of thickness 2mm in wall cladding, steel gates, tank covers and similar work, cut to size, holes punched, incl round headed screws, clout nails or rivets or nuts, bolts and fixed to wood or steel framing with plain 40 mm lap joints with rivetted or welded seams, incl bending or turning up, mitred angles etc and one coat of primer and one coat of paint after fixing as required including taking down existing complete all as specified and directed. |
| 71 | Preparation of old/new plastered or un plastered surfaces of wall and applying two coats of cement based paint complete all as specified & directed. |
| 72 | Material & Labour for concerteena coil with barbed wires and barbs having 1000mm dia of streched coil diameter, high-tensile core wire (2.5mm+0.1mm), and 0.5mm thick galvanized or stainless steel blades including dismantling of existing complete all as specified & directed. |
| 73 | Chemical Analysis test of treated water sample taken from Filteration plant Ph- I & II at SYL and submitted to PHE laboratory for the same along with 2 ltr water sample bottle for each test and the report must be submitted to this office on the last day of each month complete all as specified and directed . Note :- Test report has to be submitted by contractor to deptartment till 05th day of every month if not then a penalty of Rs 100 per day will be imposed on contractor . |
| 74 | Material & Labour for replacement of heavy duty rubber moulded coloured chequered tiles with laquer polish for extra shine of 50 Sqm size 300 mm x 300 mm x 22-25 mm thick, ISI marked, set, jointed and pointed in neat cement slurry over and including 20 mm thick (average thickness) cement screed (1:4) base complete all as specified and directed. |
| 75 | Dewatering and cleaning of the clean water sump of capacity 5 LG by any means and removing the mud, silt, dirt etc and scrapping all arround the inner wall and bottom of the tank by scrubbing with steel wire brush, washing with clean water and applying two coats of white lime wash on the internal surface of the tank complete all as specified and directed.Note: Pump set shall be provided by the contractor and tank should be cleaned at least twice times during the contract period and cost shall be paid to the contractor each time, also mention the date of cleaning on the tanks, complete all as specified and directed. |
| 76 | Note:- Amount of credit of Rs. 148890.00 for retrieved materials is mentioned in Schedule of Credit of tender documents in PDF form which will be deducted offline while acceptance of tender. Please Enable Macros to View BoQ information |