| 1 | Dismantling of Brick Work with lime/cement mortar and its proper disposal including cost of labour, T&P for proper completion of work as directed by Engineer-in-Charge and as per I.D. specifications. |
| 2 | Earth filling in washed out Portion of both bank (Slant Area) and scoured canal bed upto required level with silt/earth available in canal bed , all lead & lift manual compaction and dressing to profile with cost of labour ,T&P etc.required for proper completion of work as directed by Engineer-in-Charge as per I.D. specification. |
| 3 | Earth work in excavation in foundation for toe wall including digging and refilling the trenches with its proper disposal within 30 meter lead & all lift with cost of labour and T&P for proper completion of work as directed by Engineer-in-Charge as per drawing and I.D. specification. |
| 4 | Earth work in excavation in foundation for below bed level for boulder placing including digging with its proper disposal within 30 meter lead & all lift with cost of labour and T&P for proper completion of work as directed by Engineer-in-Charge as per drawing and I.D. specification. |
| 5 | Providing and laying of Mirjapur Stone Boulder 40 to 60 kg. Lift upto 1.50M and lead of 60.00 M. in Mechanically woven double twisted hexagond shaped wire mesh gabion box/crate class 2 as per IS code (16014:2024)of size 1x1x1 m, mesh size 10cm x 12cm ,10 SWG Galvanised steel wire mesh with polymer coated including cost of all material,royalty, labour, T & P etc. complete for work. as per direction of Engineer-in-charge. |
| 6 | Laying of dismantled brick. Lift upto 1.50M and lead of 60.00 M. in Mechanically woven double twisted hexagond shaped wire mesh gabion box/crate class 2 as per IS code (16014:2024)of size 1x1x1 m, mesh size 10cm x 12cm ,10 SWG Galvanised steel wire mesh with polymer coated including cost of all material, labour, T & P etc. complete for work. as per direction of Engineer-in-charge. |
| 7 | Providing & Laying MZP Boulder . in Mechanically woven double twisted hexagond shaped wire mesh gabion box/crate class 2 as per IS code (16014:2024)of size 1x1x0.30 m, mesh size 10cm x 12cm ,10 SWG Galvanised steel wire mesh with polymer coated 30 cm thick Pitching on slope including cost of all materials,roylaty, labour and T&P etc. |
| 8 | Laying of C.C. (1:3:6) M-10 in toe wall foundation cement with coarse sand and Graded Crushed stone grit(10mm-20mm) including cost of material, labour, T&P required for proper completion of work as directed by Engineer-in-Charge . |
| 9 | Laying of.C.C. (1:2:4) M-15 in toe wall foundation cement with coarse sand and Graded Crushed stone grit(10mm-20mm) including cost of material, labour, T&P required for proper completion of work as directed by Engineer-in-Charge . |
| 10 | Laying of R.C.C. (1:1.5:3) M-20 cement with coarse sand and Graded Crushed stone grit including cost of material, labour, T&P required for proper completion of work as directed by Engineer-in-Charge . |
| 11 | Bending, binding cutting placing in position reinforcement steel including cost of binding wire and other accessories required for proper completion of work. As per direction of direction of Engineer in Charge. |
| 12 | Centering and shuttering for R.C.C/C.C work including cost of all materials, labour and T&P with all leads and up lift/down lift for proper completion of work as directed by Engineer-in-Charge as per I.D. specification. |
| 13 | Supplying and laying Geo textile (sheet) 200 gsm thick below stone boulder including cost of all materials, labour and T&P with all leads and lift/down for proper completion of work as directed by Engineer-in-Charge as per drawing and I.D. specification. |
| 14 | Boring with 150 mm diameter casing pipe including lowering and extraction of assembly, loading, unloading and carriage including cost of all materials, labour and T&P etc. required for complete work as directed by Engineer-in-Charge as per I.D. specifications. |
| 15 | Running of 5 H.P. generator set pump for dewatering including arrangement of Pump suction and delivery pipes and other accessories at site including cost of all materials, labour and T&P etc.for complete work as directed by Engineer-in-Charge as per I.D.specifications. Please Enable Macros to View BoQ information |