| 1 | Installation of a 4000 GPM pump motor set Sl. No.03 in main patch sump |
| 2 | Assembling a 4000 GPM pump motor set in SOCP attendance room premises. |
| 3 | Transporting the above assembled pump motor set along with its starter and cable from SOCP attendance room premises to main patch sump. |
| 4 | Installation of the pump motor set on wooden slipper with proper alignment including fitting of coupling belt and greasing and packing of the pump. |
| 5 | Dismantling, transporting and fitting of suction. |
| 6 | Dismantling, transporting and fitting of 10” dia MS nipple, 10” dia MS bend and 10” dia short piece in the delivery side of the pump. |
| 7 | Dismantling of 10” dia MS pipes from the idle delivery range of Jarlahi patch and transporting the pipes manually to the loading point - 160 Nos. |
| 8 | Transporting of 10” dia MS pipes from the loading point to main patch and laying and jointing in the proposed range – 160 Nos. |
| 9 | Dismantling, transporting and fitting of 10” dia MS hose. |
| 10 | Dismantling, transporting and fitting of 10” dia sluice valve and NR valve. |
| 11 | Fabrication and fitting of 10” dia MS bend. |
| 12 | Fabrication of 10” dia MS taper pipe for jointing in the delivery. |
| 13 | Fabrication and fitting of matching piece of 10” dia MS pipe for jointing in the delivery after road crossing. |
| 14 | Shifting and laying of cable from the starter to the motor. |
| 15 | Alignment of pump motor set and commissioning of the pump. |
| 16 | Providing bolts, nuts and washer. |
| 17 | Shifting of both the drum pontoon along with their HT pump motor set |
| 18 | Dismantling of 10” dia hose and shifting of both the drum pontoon along with their 4000 GPM and 3000 GPM pump motor set towards lower side of the sump. |
| 19 | Dismantling, transporting and fitting of 10” dia MS nipple, 10” dia MS bend and 10” dia MS short piece in the delivery side of the pump. |
| 20 | Dismantling, transporting and fitting of 10” dia MS pipes in the delivery of both the pump (10+12 = 22 Nos.) |
| 21 | Dismantling, transporting and fitting of 10” dia MS hose in the delivery of both the pump. |
| 22 | Dismantling, transporting and fitting of 10” dia sluice valve and NR valve in the delivery of both the pump (02+02). |
| 23 | Fabrication and fitting of 10” dia MS bend. |
| 24 | Fabrication of 10” dia MS taper pipe for jointing in the delivery of both the pump (03+04). |
| 25 | Shifting and laying of cable from the starter to the motor of both the pump (70 Mtr. x 02). |
| 26 | Extension of delivery of both the pontoon pump with gradual decreasing of water level of the sump (04 x 02). |
| 27 | Leakage repairing in 10” dia MS pipe in the delivery of both pump in the top bench of the sump by removing earth, dismantling the damaged pipes, welding the damaged flange and damaged portion of the pipe and refitting (03+02). |
| 28 | Total impact of GST for the purpose of CTC Please Enable Macros to View BoQ information |