| 1 | Shifting of HT 2000GPM Pump Motor set Sump No.01 |
| 2 | Dismantling & Transporting of 8\\" dia M.S.pipe in the suction & delivery Safe Place of the pump 95Nos.x 20'=1900 ft |
| 3 | Dismantling & withdrawal of H.T. pump along with their motor & baseplate from their existing position. |
| 4 | Transporting of dismantling pump along with motor ,starter & baseplate from their existing position to the Another Place of the sump . |
| 5 | Installation of pump , motor set on the ground level with proper alignment including fitting of coupling belt & greasing packing of the pump |
| 6 | Dismantling ,transporting &fitting of 8\\" dia M.S.nipple ,8\\"dia M.S. bend ,8\\" dia M.S.pipe &footvalve in the suction of the the pump. |
| 7 | Dismantling ,transporting &fitting of 8\\" dia M.S.nipple ,8\\"dia M.S. bend ,8\\" dia shortpiece in the delivery of the the pump. |
| 8 | Transporting Laying & Jointing of 8\\" dia M.S.pipe in the suction & delivery of the the pump 45Nos.x 20'=900 ft |
| 9 | Dismantling ,transporting &fitting of 8\\" dia sluice valve & N.R. valve in the delivery of the pump 2 set |
| 10 | Dismantling transporting &fitting of 8\\"dia hose pipe in the delivery of the pump. |
| 11 | Commissioning of the pump motor set |
| 12 | Shifting & laying of cable from pole to starter & starter to the motor of the pump(35+25)mtr = 60 mtr |
| 13 | Providing & fitting of nut & bolt |
| 14 | Fabrication & fitting of 8\\" dia M.S. Shortpiece |
| 15 | Dismantling ,transporting and erection of shed another place of sump |
| 16 | Providing and fitting of R.I. cloth |
| 17 | Providing of gland packing |
| 18 | Shifting of 2000GPM Pump Motor set Sump no.02 |
| 19 | Transporting Laying & Jointing of 8\\" dia M.S.pipe in the suction & delivery of the the pump 55Nos.x 20'=1100 ft |
| 20 | Fabrication & fitting of 8\\" dia M.S. Tapper Pipe |
| 21 | Providing & fitting of nut & bolt |
| 22 | Transporting of Pump along with motor ,starter & baseplate from their existing position to the Sump No.02 |
| 23 | Installation of pump , motor set on the ground level with proper alignment including fitting of coupling belt & greasing packing of the pump |
| 24 | Transporting &fitting of 8\\" dia M.S.nipple ,8\\"dia M.S. bend ,8\\" dia M.S.pipe &footvalve in the suction of the the pump. |
| 25 | Transporting &fitting of 8\\" dia M.S.nipple ,8\\"dia M.S. bend ,8\\" dia shortpiece in the delivery of the the pump. |
| 26 | Transporting &fitting of 8\\" dia sluice valve & N.R. valve in the delivery of the pump |
| 27 | Transporting &fitting of 8\\"dia hose pipe in the delivery of the pump. |
| 28 | Commissioning of the pump motor set |
| 29 | Shifting & laying of cable from pole to starter & starter to the motor of the pump(35+25)mtr = 60 mtr |
| 30 | Providing & fitting of Body Stud nut |
| 31 | Providing and fitting of R.I. cloth |
| 32 | Providing of gland packing |
| 33 | Extension of suction pipe |
| 34 | Total impact of GST for the purpose of CTC Please Enable Macros to View BoQ information |