| 1 | Excavation for roadway in earth, soil of all sorts, sand, gravel or soft murum including dressing section to the required grade, camber and side slopes and conveying the excavated materials with all lifts upto a lead of 50m. and spreading for embankment or stacking as directed. |
| 2 | Providing earth work in embankment with approved materials obtained from other sources upto lead of 50m. including all lifts, laying in layers of 20cm. to 30cm. thickness breaking clods, dressing to the required lines, curves, grades & section, watering and compaction with vibratory roller with V-Sat attachment to achieve not less than 97 % of standard proctor density etc. complete ( Material obtained from Other sources) |
| 3 | Conveying materials obtained from road cutting including all lifts, laying in layers of 20cm to 30cm. breaking clods, dressing to the required lines, curves, grades and section, watering and compacting to not less than 97% of standard Proctor density for a lead of over 50m. to 300m. inclusive from the site of excavation to the site of deposition as directed |
| 4 | Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader/ Paver on prepared surface and compacting with vibratory roller to achieve the desired density, complete as per clause 401 -- Plant Mix Method and Grading - I Material |
| 5 | Wet Mix Macadam -- Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. Laying By Grader/Paver. |
| 6 | Providing and applying tack coat on the prepared surface heating by fames in Boiler and spraying bitumen with sprayer on Dry / Hungry B.T. surface 3 kg/10 sqm. (VG-30 bulk bitumen rates are considered to arrive at rates) |
| 7 | Prime coat - Providing and applying primer coat with bitumen emulsion on prepared surface of granular Base including cleaning of road surface and spraying, primer at the rate of 0.60 kg/sqm using mechanical means |
| 8 | DENSE BITUMINOUS MACADAM: Proving and laying dense bituminous macadam using crushed aggregates of Grading 1, premixed with bituminous binder of specified grade of Bitumen @ 4.50 per cent by weight of total mix and filler, transported to site with VTS , laid over a previously prepared surface, finished to the required grade, level, alignment, and rolling to achieve the desired density for 76-100 mm compacted thickness .USING Batch mix type hot mix plant with SCADA, Sensor Paver, Vibratory roller with Stone Dust filler.(VG-30 bulk bitumen rates are considered to arrive at rates) |
| 9 | BITUMINOUS CONCRETE:- Providing and laying bituminous concrete using crushed aggregates of grading 1, premixed with bituminous binder @ 5.20 per cent by weight of total mix and filler, transported to site with VTS , laid over a previously prepared surface, finished to the required grade, level, alignment, and rolling to achieve the desired compaction for 50 mm compacted thickness with specified grade of Bitumen,Excluding prime / tack coat. For Bitumen of specified grade -- USING Batch mix type hot mix plant with SCADA, Sensor Paver, Vibratory roller with Stone Dust filler. (VG-30 bulk bitumen rates are considered to arrive at rates) |
| 10 | Providing and Laying hot applied thermoplastic road marking strip on Bituminous Surface of specified shade/ colour of 2.5 mm thick including 1.5 Refractive index reflectorizing glass beads @ 250gm/sqm .Thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC 35:2015. |
| 11 | Providing and Laying hot applied thermoplastic road marking strip on Bituminous Surface of specified shade/ colour of 2.5 mm thick including 1.5 Refractive index reflectorizing glass beads @ 250gm/sqm .Thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC 35:2015. Initial Dry reflectivity RL shall be > 250 mcd/sqm/lux measured in the initial 7 days and sustained reflectivity RL of 100 mcd/sqm/ lux and Qd of 100 mcd/sqm/ lux measured at the end of 2 years by means of a Standard Reflectometer of Zehntner, Easylux, Delta make capable of measuring RL & QD both according to IRC 35:2015 clause 15.5. The finished surface to be level, uniform, and free from streaks and holes complete as per direction of Engineer-in-charge and in accordance with applicable specifications.(Refer MORTH Clause 803 for technical Specification and Performance for IRC 35:2015). |
| 12 | Providing and fixing Mandatory/Regulatory sign boards in circular shape of ______ mm dia made out of ____mm aluminum sheet bonded with white retro reflective sheeting of Class B ( Type IV High intensity micro-prismatic grade sheeting-HIP) having pressure sensitive/heat activated adhesive retoreflective specified back ground, border and back side retoreflctive symbols, letters, numerals, arrow as per IRC:67-2012 Table No 8.3 Supported with back support frame 25mm x 25mm x 3mm, duly painted on back side with grey stove enamel paint and supported on one no. of M. S. angle iron post of size 65 mm X 65 mm X 6 mm, 3.45 m long, duly painted with with flat oil paint having alternate black and white bands of 25 cm width including G.I. fixtures etc; fixing the boards in M25 grade concrete block of size 60cm X 60cm X 75cm including transportation etc; complete. Class B ( Type IV High intensity micro-prismatic grade sheeting-HIP) shall have 7 years written warranty from the manufacturer and authorised distributor/convertor issued for field performance including the screen printed areas and cut-out sheeting and cut-out durable transparent overlay film and this warranty certificate in original should be submitted to the Engineer in charge by the contractor/supplier. |
| 13 | 600 mm dia made out of 1.5mm aluminum sheet |
| 14 | Providing and applying priming coat over new/old steel and other metal surfaces including preparing the surface by thoroughly cleaning oil, grease, dirt and other foreign matter and scoured with wire brushes, fine steel wool, scrappers and sand paper, scaffolding etc. complete. |
| 15 | Providing and applying two coats of synthetic enamel paint of approved colour to new /old structural steel work and wood work in buildings, including scaffolding if necessary, cleaning and preparing the surface (excluding primer coat) etc. complete. |
| 16 | Providing and applying two coats of flat oil paint of approved colour to the old structural steel work and iron work previously painted in building including scaffolding, if necessary, cleaning and preparing the surface (excluding primer coat) etc. complete. |
| 17 | Testing |
| 18 | BASIC TEST OF AGGREGATE: Water Absorption, Specific Gravity,Impact Value, Crushing Value. |
| 19 | BASIC TEST OF AGGREGATE: Sieve Analysis. |
| 20 | BASIC TEST OF AGGREGATE: Flakiness Index & Elongation Index. |
| 21 | MIX DESIGN: GSB Mix Design./Cement Treated Sub Base ( CTSB) |
| 22 | MIX DESIGN: Wet Mix Macadam Mix Design. |
| 23 | FINE AGGREGATE: Fineness Modulus ( Sieve Analysis ),Silt & Clay Content |
| 24 | SOIL / MURUM: Liquid limit & plastic Limit. |
| 25 | SOIL / MURUM: Compaction Test ( Proctor Density ). |
| 26 | SOIL/ MURUM CBR Test Lab With compaction test. |
| 27 | SOIL/ MURUM CBR Test Field Determination Test Excluding Transportation. As per IS 2720 Part XXXI |
| 28 | BITUMEN: Penetration, Softening Point, Flash & Fire Point, Specific Gravity |
| 29 | BITUMEN: Viscosity. |
| 30 | BITUMEN: Extraction Test.(Bituminous mix) |
| 31 | BITUMEN: Extraction &Sieve Analysis of Bituminous mix ( for BM/DBM/AC) (2 samples of extraction for one sieve analysis including extraction) |
| 32 | BITUMEN: Marshall Stability & Flow measurement ( Set of 3 moulds) |
| 33 | BITUMEN: Job Mix Design with all Tests on aggregate (Excluding bitumen) for DBM/SDBC/AC/SMA (Stone Mastic Ashphalt) ( Testing of Bitumen shall be seperately Charged) |
| 34 | BITUMEN: Density of Bituminous Core. |
| 35 | PAINT / THERMO-PLASTIC PAINT: Glass bead contents & grading analysis. |
| 36 | PAINT / THERMO-PLASTIC PAINT: Reflectance & yellowness index. |
| 37 | PAINT / THERMO-PLASTIC PAINT: Flowability.(Percentage residue). |
| 38 | PAINT / THERMO-PLASTIC PAINT: Softening Point. (Ring & ball method). |
| 39 | PAINT / THERMO-PLASTIC PAINT: Drying Time. |
| 40 | Royalty |
| 41 | Providing earthwork Please Enable Macros to View BoQ information |