| 1 | Earth Work in Excavation of foundation of abutments as per drawing and technical specification including setting out, construction of shoring and bracing , removal of stumps and other deleterious matter, dressing of sides and botton and backfilling with approved material |
| 2 | Construction of Embankment with material obtained from borrow pits for local earthen construction of embankment with approved material obtained from abailable land and permitted and approved by engineer incharge and as per technical specification cluase 301.3.4.1 with lead up to 1000m, spreading, gradding to required slope and copecting to meat reuirment of talbes 300.1 and 300.2 as per tech classification 301.5. cartage 2 km |
| 3 | Providing and laying of 1:6:12 CC in foundation and base in cement sand and Brick ballast 40 mm gauge including all required complete for proper completion of work as per S.I. no 273 |
| 4 | M-150 Brick work in 1:4 cement & fine sand (1.25 F.M.) mortar morter in foundation and plinth including supply of all materials, labour & tools & plants etc. required for proper completion of the work. Excluding GST. SI No. 305 |
| 5 | Construction of granular sub-base by providing coarse graded material,spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method at OMC, and compacting with smooth wheel roller to achieved the desired density, complete as per clause 401 |
| 6 | WBM Grading III - Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade camber, applying and brooming , crushable screaning to fill up the interstices of coarse aggregrade watering and compacting & required (1-3 as per TS. Clause 405 |
| 7 | Provideing and Laying of 80 mm thick interlocking concrete block pavements as per technical specification clause 1504. |
| 8 | PCC work with 1:2:4 with cement, coarse sand & 20 mm stone grit including all material labour etc complete as per SI No. 279A |
| 9 | 12mm thick plaster in 1:4 cement & sand morter all complete as per S.I. No. 13.11 |
| 10 | RCC work in slab with 1:1.5:3 with cement, coarse sand & 20 mm stone grit including all material labour etc complete SI no 284 |
| 11 | P/L of MS work in slab as reinforcement including all material TNP etc complete SI No 504 |
| 12 | P/L of information road signboard at site including all material labour etc. |
| 13 | As per Order of Joint Secretary G.O.No.G-1877 Dated-21-02-2025 and Dierector cum-Chief Engineer U.P.RED, LucknowLetter No.801 Dated 03-03-2025 Deduction 5 % for Competative Price Efficiency Please Enable Macros to View BoQ information |