| 1 | Repairs & Rewinding of motors |
| 2 | Rewinding and repairs of Squirrel cage induction motors,440V,3 phase,50 cycles/sec 500RPM with F class insulation including baking, varnishing, painting etc. (The scrap of winding material shall be retained by rewinder) |
| 3 | 40 HP |
| 4 | 50 HP |
| 5 | Supplying & erecting NDE Ball Bearing No 6212/C4 SKF Make suitable for 50 HP motor including all materials, labour, etc., complete |
| 6 | Supplying & erecting NDE Ball Bearing No 6211 / C4 SKF Make suitable for 40HP motor including all materials, labour, etc., complete |
| 7 | Supplying & erecting DE Ball Bearing No 7317BECBM suitable for 50 HP motor including all materials, labour, etc. Complete. |
| 8 | Supplying & erecting DE Bearing No 7316BECBM SKF Make suitable for 40 HP motor including all materials, labour, etc. Complete. |
| 9 | Rewinding of electric motor above 1 HP and upto 2 HP, three phase upto 1400 RPM with copper wire, overhauling with minor repairs, lubricating of ball bearings & bush bearing, and replacing screws etc. testing for the original speed and no load consumption with guarantee for one year. |
| 10 | Rewinding of electric motor above 2 HP and upto 3 HP, three phase upto 1400 RPM with copper wire, overhauling with minor repairs, lubricating of ball bearings & bush bearing, and replacing screws etc. testing for the original speed and no-load consumption with guarantee for one year. |
| 11 | Rewinding of electric motor above 3 HP and upto 5 HP, three phase upto 1400 RPM with copper wire, overhauling with minor repairs, lubricating of ball bearings & bush bearing, and replacing screws etc. testing for the original speed and no-load consumption with guarantee for one year. |
| 12 | Rewinding of electric motor above 7.5 HP and upto 10 HP, three phase upto 1400 RPM with copper wire, overhauling with minor repairs, lubricating of ball bearings & bush bearing, and replacing screws etc. testing for the original speed and no-load consumption with guarantee for one year. |
| 13 | Repair, overhauling of Kirloskar Make 3 HP Pump set type KDS 335++ |
| 14 | Repair, overhauling of Texmo Make 10 HP Pump set. |
| 15 | Repair, overhauling of Texmo Make 20 HP Pump set. |
| 16 | Servicing & overhauling of 40 HP motor including removing from location, dismantling cleaning the winding drying applying varnish baking, greasing the bearing, dynamic balancing of rotor & giving satisfactory trial on no load & full load |
| 17 | Servicing & overhauling of 50 HP motor including removing from location, dismantling cleaning the winding drying applying varnish baking, greasing the bearing, dynamic balancing of rotor & giving satisfactory trial on no load & full load. |
| 18 | Supplying heavy duty connection plate for upto 60 HP motor as per old sample. |
| 19 | Supplying SKF make general purpose bearing grease in 5 Kg. packings with catalogue no. LGMT 2/5 as per specifications of SKF etc complete. |
| 20 | Submersible pumps for Borewell (WP-SMP) |
| 21 | Supplying, erecting, testing and commissioning of minimum three & above star rated submersible pumpset of 3.75 kW/5 HP with 415 V, three phase, 50 Hz A.C. supply suitable for 150 mm dia. borewell with 210 to 860 lpm discharge at 38 to 13 m head & discharge & delivery pipe of size-65mm dia. with a necessary H type clamps as per specification no. WP-SMP. |
| 22 | Accessories |
| 23 | Supplying, erecting, testing and commissioning of D.O.L starter suitable for 400 V, 3 phase 50 Hz with no volt coil and overload element with necessary materials and connected to supply above 3 HP to 7.5 HP. |
| 24 | Supplying, erecting, testing and commissioning of flat flexible 3 core 4 sq.mm PVC sheathed submersible type copper cable suitably clamped at fixed intervals with column pipe assembly complete. |
| 25 | Supplying, erecting, testing and commissioning of D.O.L Starter suitable for 400 V, 3 phase 50 Hz with no volt coil and overload element with necessary materials and connected to supply for above 7.5 HP 10 HP. |
| 26 | Rebate for old dismantled materials /scrap. |
| 27 | Annual Electrical Maintenance of Panel Board/Starter Panel etc at WTP Baramati |
| 28 | Accessories |
| 29 | Supplying and replacing no-volt-coil from 30 HP to 90 HP motor starter. |
| 30 | Supplying and replacing thermal overload relay for motor starter 40 HP to 50 HP |
| 31 | Supplying & replacing electronic timer above 30 HP motor starter. |
| 32 | Supplying and replacing contactor for star-delta motor starter suitable for above 30 HP to 40 HP. |
| 33 | Supplying and replacing contactor for star-delta motor starter suitable for above 45 HP to 50 HP. |
| 34 | LT - MCCBs (SW-MCCB) |
| 35 | Providing & erecting 3 Pole MCCB, 415V, up to 100A, rated short-circuit breaking capacity 25 kA (Ics=100% of Icu), adjustable thermal (overload) setting and fixed magnetic setting with provided leads, provision for installation of shunt/UV/trip alarm contact. MCCB with phase barriers on both sides, insulation withstand capacity 800V, no line-load bias in provided enclosure/panel as per specification no. SW-MCCB |
| 36 | Providing & erecting 3 Pole MCCB 415V, 250A, rated short-circuit breaking capacity 36 kA (Ics=100% of Icu) adjustable thermal (overload) setting and adjustable magnetic setting with provided leads, provision for installation of shunt/UV/trip alarm contact. MCCB should have phase barriers both sides, with insulation withstand capacity 800V, no line-load bias in provided enclosure/panel as per specification no. SW-MCCB |
| 37 | Accessories |
| 38 | Supplying, erecting, testing and commissioning of pump protection relay comprising current sensing phase failure and UV+OV relay with dry run and overload protection suitable for three phase pumps. |
| 39 | Supplying and installing pressure gauge of 100 mm dia, 0.7 kg per cm square or 0-14 kg per cm square or 0-21 kg per cm square fitted with pressure gauge U tube & 12/15 mm dia, pad cock valve and G.I. pipe, elbow etc complete. |
| 40 | Outdoor Fittings (FG-ODF) |
| 41 | Supplying and erecting integrated LED street light fitting 85-90W IP65 & IK08 class having single piece pressure die-cast aluminium housing, having system lumens output of Min. 9300 Lumens, min. efficacy of 110 lumen/W, CRI>70, CCT upto 6500K, THD<10%, p.f. >0.95, operating range of 140-270V, inbuilt surge protection of 10 kV, Life class of 50,000 Hrs at L70B50 including driver complete with minimum 2 Years warranty as per specification No. FG-ODF/SL. |
| 42 | Accessories for Outdoor Fittings (FG-BKT) |
| 43 | Supplying and erecting street light Wall bracket made from 40 mm. dia ‘B’ class G.I. pipe 1.2 m in total length complete as per specification no. FG-BKT/WB. |
| 44 | LT Cables (Aluminum) (CB-LT/AL) |
| 45 | Supplying, erecting & terminating FR XLPE insulated, galvanised steel formed wire armoured (strip) cable, 1100 V 4 core 35 sq. mm. aluminium conductor complete erected with glands & lugs on wall/ trusses/pole or laid in provided trench/ pipe as per specification no. CB-LT/AL |
| 46 | Supplying, erecting & terminating FR XLPE insulated, galvanised steel formed wire armoured (strip) cable, 1100 V 4 core 10 sq. mm. aluminium conductor complete erected with glands & lugs on wall/ trusses/pole or laid in provided trench/ pipe as per specification no. CB-LT/AL |
| 47 | Annual Maintenance of 50 HP Pure water pumps @ WTP |
| 48 | Dismantling of the pump set, motor and bowl assembly to ascertain the repairs. |
| 49 | Transportation of Dismantled Pump from PW Pump House up to Workshop. |
| 50 | Machining & assembling of Bowl Assembly Shaft |
| 51 | Providing & assembling bowl bushes |
| 52 | Providing & assembling suction case bush |
| 53 | Providing & assembling of discharge case bowl bush |
| 54 | Providing & assembling of strainer |
| 55 | Machining & assembling of impellers |
| 56 | Machining & assembling of Bowl Neck Ring |
| 57 | Providing & assembling Sand Collar |
| 58 | Assembling of Bowl Assembly |
| 59 | Providing & assembling of shaft coupling |
| 60 | Providing & assembling of SS Sleeves on Line Shaft |
| 61 | Machining & assembling of spider |
| 62 | Providing & assembling of spider rubber bearings. |
| 63 | Machining of line shaft, assembling of sleeve & rubber spider |
| 64 | Providing & assembling of gland cap & gland bush. |
| 65 | Providing & assembling of head shaft |
| 66 | Transportation of repaired pump from workshop upto PW Pump House |
| 67 | Providing & fixing nut bolts & rubber packing required for complete assembling of pump |
| 68 | Assembling, commissioning of the pump set at site including giving test & trial. |
| 69 | Rebate for old dismantled materials /scrap |
| 70 | Annual Maintenance of 40 HP Pure water pumps @ WTP |
| 71 | Dismantling of the pumpset, motor and bowl assembly to ascertain the repairs. |
| 72 | Transportation of Dismantled Pump from PW Pump House up to Workshop |
| 73 | Providing & assembling of discharge case bowl bush |
| 74 | Machining & assembling of Bowl Assembly Shaft |
| 75 | Providing & assembling bowl bushes |
| 76 | Providing & assembling suction case bush |
| 77 | Providing & assembling of strainer |
| 78 | Machining & assembling of impellers |
| 79 | Machining & assembling of Bowl Neck Ring |
| 80 | Providing & assembling Sand Collar |
| 81 | Providing & assembling of shaft coupling |
| 82 | Assembling of Bowl Assembly |
| 83 | Providing & assembling of SS Sleeves on Line Shaft |
| 84 | Machining & assembling of spider |
| 85 | Providing & assembling of spider rubber bearing |
| 86 | Machining of line shaft, assembling of sleeve & rubber spider |
| 87 | Providing & assembling of gland cap & gland bush. |
| 88 | Providing & assembling of head shaft |
| 89 | Transportation of repaired pump from workshop upto PW Pump House |
| 90 | Providing & fixing nut bolts & rubber packing required for complete assembling of pump |
| 91 | Assembling, commissioning of the pump set at site including giving test & trial. |
| 92 | Rebate for old dismantled materials /scrap Please Enable Macros to View BoQ information |