| 1 | Quarrying, Carrying, & Supplying stone Boulders / Shingles etc. from quarry site selected by the Engineer-in-charge to the site of work including cost of materials,loading unloading and carriage including all incidental charges like royalty and labour charges for laying boulder in apron or within wire netting of sausage for slope pitching and all lifts & dressing the exposed faces etc. complete as per direction of the engineer-in -charge (Quarry bed belongs to L & LRO Deptt. Govt. of W.B) N.B.The construction wing is to add royalty and other related fees at the presently prescribed rates for forest and non-forest area as stated below to arive at the total rate at quarry site till such rates are modified by the Forest Department and Department of Industry, Commerce & Enterprises, Government of West Bengal. (b) For Non-Forest area Royalty : Rs. 106.00 per Cum Royalty (including other charges wherever applicable) certificates in original from competent authority are to be submitted along with the bill, otherwise amoun t due towards Royalty( including other charges wherever applicable, but excluding GST) will be deducted from the bills of works Comprising Boulder above 30 kg. each 60%, 20 Kg and above 30%, and 10 kg and above 10%. (Apron) |
| 2 | Quarrying, Carrying, & Supplying stone Boulders / Shingles etc. from quarry site selected by the Engineer-in-charge to the site of work including cost of materials,loading unloading and carriage including all incidental charges like royalty and labour charges for laying boulder in apron or within wire netting of sausage for slope pitching and all lifts & dressing the exposed faces etc. complete as per direction of the engineer-in -charge (Quarry bed belongs to L & LRO Deptt. Govt. of W.B) N.B.The construction wing is to add royalty and other related fees at the presently prescribed rates for forest and non-forest area as stated below to arive at the total rate at quarry site till such rates are modified by the Forest Department and Department of Industry, Commerce & Enterprises, Government of West Bengal. (b) For Non-Forest area Royalty : Rs. 106.00 per Cum Royalty (including other charges wherever applicable) certificates in original from competent authority are to be submitted along with the bill, otherwise amoun t due towards Royalty( including other charges wherever applicable, but excluding GST) will be deducted from the bills of works Boulder above 20 kg |
| 3 | Supplying, fitting, fixing end pieces for rectangular / square / circular sausages at the ends, with 10 SWG / 8 SWG G I wire net of different mesh sizes tying & sewing the same maintaning a lap langth of 150mm all around with 12 SWG G I wire complete, including the cost of supply of wire netting,fitting etc, complete as per direction of the Engineer - in charge. Mesh size 150 mm x 150 mm with 10 SWG wire |
| 4 | Making rectangular / circular sausage cage with 10 SWG galvanized iron wire of 150 mm. x 150 mm. mesh wire netting with proper lapping of minimum 150 mm including sewing the joints with 12 SWG G I wire and supply of all materials and equipments including placing the sausage cage in position, filling the same with boulder or lump aggregates complete as per direction of the Engineer-in-charge but excluding the cost of boulder / lump aggregates and its carriage upto site.(Cost is excluding the cost of end pieces)1.50 metre diameter |
| 5 | Cutting uprooting and clearing jungles including shrubs, water weeds, bushes, trees, plants, upto 30 cm. girth including removing as directed by Engineer-in-charge. |
| 6 | Quarrying, Carrying & Supplying river bed materials from quarry site selected by the Engineer-in-charge to the site of work including cost of materials, loading unloading stacking and carriage including all incidental charges like royalty and labour charges for laying river bed materials with all leads and lifts in slope, base of apron, on the road surface and dressing the exposed faces and laying uniformly including preparing bed with earth upto 30 cm, where necessary and compacting as per direction of the engineer-in -charge. (Quarry bed belongs to L & LRO Deptt. Govt. of W.B) N.B.The construction wing is to add royalty and other related fees at the presently prescribed rates for forest and non-forest area as stated below to arive at the total rate at quarry site till such rates are modified by the Forest Department and Department of Industry, Commerce & Enterprises, Government of West Bengal. (b) For Non-Forest area Royalty : Rs. 106.00 per Cum Royalty (including other charges wherever applicable) certificates in original from competent authority are to be submitted along with the bill, otherwise amoun t due towards Royalty( including other charges wherever applicable, but excluding GST) will be deducted from the bills of works River Bed Materials |
| 7 | Earthwork from borrow pits over existing embankment or for repairs to embankment, closing breaches etc. within an initial lead of 30 metre and lift of 1.50 metre including breaking clods and depositing the same in layers not exceeding 25 cm. and rough dressing etc. complete as per profile |
| 8 | Extra rate over Item No. 7.00 for all kinds of soil for every additional lead of 30 metres or part thereof beyond the initial lead of 30 metres. Please Enable Macros to View BoQ information |